laitimes

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

author:Qinzhou traffic police

Due to the needs of the upgrading and reconstruction project of the Golden Bay Bridge, in accordance with the relevant provisions of the Road Traffic Safety Law of the People's Republic of China and the implementation regulations, it is decided to redirect the two-way trial operation of the Baotong Bridge of the Golden Bay Bridge, and the specific notice is as follows:

1. Traffic diversion time

From April 26, 2024, it is expected to end on May 2, 2024.

2. Traffic diversion locations

Baotong Bridge section of Jinhaiwan Bridge.

3. Traffic diversion measures

The original Golden Bay Bridge will be fully closed, and vehicles and pedestrians will be prohibited from passing.

Please drive through the above-mentioned road sections according to the instructions of traffic signs and markings, obey the command and guidance of on-site traffic management personnel, and it is recommended that the general public use map software to understand real-time traffic conditions before traveling, and adjust travel plans in time. We ask for your understanding for the inconvenience caused by traffic diversion.

Notice is hereby given.

Attachment: Schematic diagram of the passage route of Baotong Bridge of Jinhaiwan Bridge

Traffic Police Detachment of Qinzhou Public Security Bureau

April 24, 2024

Annex:

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

Figure 1: Schematic diagram of the passage route of Baotong Bridge of Jinhaiwan Bridge

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

Figure 2: Schematic diagram of the east intersection of Baotong Bridge of Jinhaiwan Bridge

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

Figure 3: Schematic diagram of the west intersection of Baotong Bridge of Jinhaiwan Bridge

Source: Command Center Editor: Feng Junbao Review: Qin Chengchao Final Review: Li Youdong

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

Qinzhou traffic management hotline report and signal light failure reporting telephone: 0777-2883009 report mailbox: [email protected] complaint telephone: 0777-2800829 vehicle management business consultation telephone: 0777-2817788 accident handling consultation telephone: 0777-2829088 order business consultation telephone: 0777-2836386 first brigade captain hotline: 0777— 2810407 Second Brigade Captain Hotline: 0777-2392226 Third Brigade Captain Hotline: 0777-2834696 Fourth Brigade Captain Hotline: 0777-2828815 Fifth Brigade Captain Hotline: 0777-3888750 Pubei Brigade Captain Hotline: 0777-8213623 Lingshan Brigade Captain Hotline: 0777-6421908

Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge
Notice on the implementation of two-way trial operation of the Jinhaiwan Bridge and Baotong Bridge

Read on