laitimes

Notice on the maintenance and construction of national and provincial trunk roads in the territory of Xilin Gol League

author:Pentium Media

Notice on the maintenance and construction of national and provincial trunk roads in the territory of Ximeng

Notice on the maintenance and construction of national and provincial trunk roads in the territory of Xilin Gol League

In order to improve the safe traffic capacity of the national highways and create a safe and good highway traffic environment, according to the construction arrangement of the highway maintenance project of the Xilin Gol League Transportation Development Center in the spring of 2024, the pavement of the national and provincial trunk roads in the whole Union will be grouted, and the relevant matters are hereby notified as follows:

1. G207 line

(1) Semi-closed construction section: G207 line (Baiyinhua to Balagar Gaolesi toll station) K380+055-K476 section;

Semi-closed construction time: April 10 to May 30, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: G207 line (Xilinhot to West Wuzhumuqin Banner) K476 + 500-K589 + 327 up and down section, G207 line (Xilinhot Reservoir Road Ban to Wuritu) K614 + 000 - K704 + 000 up and down section;

Semi-closed construction time: April 8 to May 15, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Precautions: During the construction period, half of the closed construction is adopted, the traffic is not closed, the construction personnel move on the road, and the vehicles and pedestrians who pass through the above sections of the road are requested to consciously abide by traffic laws and regulations during the construction period, and follow the instructions of the construction site signs and traffic signs to drive slowly and cautiously, and pay attention to safety.

2. G209 line

(1) Semi-closed construction section: G209 line (Sunit Left Banner to Sunit Right Banner) K0+000-K50+000 up and down section;

Semi-closed construction time: from April 10 to May 10, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: G209 line (Sunit Right Banner to Siziwang Banner) K157+600-K201+383 section;

Semi-closed construction time: April 7 to May 15, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Precautions: during the construction of the use of half closed construction, not closed traffic, construction personnel in the road to move operations, during the construction period please pass through the road section of the motor vehicle driver drive cautiously, in accordance with the guidance signs, traffic signs, traffic markings, prompt signs of the provisions of the passage, obey the command of the on-site construction personnel. We apologize for the inconvenience caused by road construction to the public.

3. G303 line

(1) Semi-closed construction section: G303 line (North Ring Road) K1207 + 201-K1228 + 060 road section, G303 line (Xilinhot to Abaga Banner) K1228 + 060-K1283 + 600 up and down section;

Semi-closed construction time: April 8 to May 15, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: G303 line (Xilinhot to Abaga Banner) K1283 + 600 - K1331 + 533 up and down section;

Semi-closed construction time: April 1 to May 1, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Precautions: during the construction period, half of the closed construction, not closed traffic, construction personnel in the road to move operations, during the construction of vehicles and pedestrians passing through the above sections of the road consciously abide by traffic regulations, and according to the construction site signs and traffic signs instructions to be cautious and slow, pay attention to safety.

Fourth, G306 line

(1) Semi-closed construction section: G306 line (Dashui pineapple to Balagaar Gaole Town South Exit) K631+845-K693+001 section;

Semi-closed construction time: April 10 to May 30, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: G306 line (Balagar Gaole Town to Uriastai Town) K700+905-K812+305 section;

Semi-closed construction time: April 15 to May 31, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Semi-closed construction section: G306 line (Uriastai Town to Zhuengadabuqi Town) K815 + 355 - K885 + 060 up and down section;

Semi-closed construction time: April 12 to May 10, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(4) Precautions: During the construction period, the use of half-width closed construction, not closed traffic, construction personnel in the road to move operations, please pass the above road sections of vehicles and pedestrians consciously abide by traffic regulations, and according to the construction site signs and traffic signs instructions cautious and slow, pay attention to safety.

5. G331 line

(1) Semi-closed construction section: G331 line (Abaga Banner to Sunit Left Banner) K5988+000-K6046+000 up and down section;

Semi-closed construction time: April 1 to May 1, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: G331 line (Abaga Banner to Sunit Left Banner) K6046 + 000 - K6118 + 300 up and down section;

Semi-closed construction time: April 10 to May 10, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Semi-closed construction section: G331 line (Sunit Left Banner to Erenhot) K6118 + 300 - K6220 + 119 up and down section;

Semi-closed construction time: April 16 to May 16, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(4) Semi-closed construction section: G331 line (Erenhot to Erlegh Temple) K6229-K6273 section;

Semi-closed construction time: April 19 to May 19, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(5) Precautions: During the construction period, half of the closed construction is adopted, the traffic is not closed, the construction personnel move the operation on the road, and the vehicles and pedestrians who pass through the above sections of the road are requested to consciously abide by traffic laws and regulations during the construction, and follow the instructions of the construction site signs and traffic signs to drive slowly and cautiously, and pay attention to safety.

6. G334 line

(1) Semi-closed construction section: G334 line (Wulagai to East Uzhumuqin Banner) K1263+373-K1390+000 section;

Semi-closed construction time: April 7 to April 30, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Precautions: During the construction period, half of the closed construction is adopted, not closed traffic, the construction personnel move on the road, during the construction period, please consciously abide by the traffic laws and regulations of the vehicles and pedestrians who pass through the above sections, and follow the instructions of the construction site signs and traffic signs to drive slowly and carefully, pay attention to safety.

7. S206 line

(1) Semi-closed construction section: S206 line (Ulagai to Jinshan Power Plant) K77+400-K162+139 section;

Semi-closed construction time: April 7 to April 30, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Precautions: During the construction period, half of the closed construction is adopted, not closed traffic, the construction personnel move on the road, during the construction period, please consciously abide by the traffic laws and regulations of the vehicles and pedestrians who pass through the above sections, and follow the instructions of the construction site signs and traffic signs to drive slowly and carefully, pay attention to safety.

8. S304 line

(1) Semi-closed construction section: S304 line (river sandwich to Duolunuoer North) K693+600-K743+700 up and down section;

Semi-closed construction time: April 15 to May 20, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Precautions: During the construction period, half of the closed construction is adopted, not closed traffic, the construction personnel move on the road, during the construction period, please consciously abide by the traffic laws and regulations of the vehicles and pedestrians who pass through the above sections, and follow the instructions of the construction site signs and traffic signs to drive slowly and carefully, pay attention to safety.

9. S312 line

(1) Semi-closed construction section: S312 line (Zhuengadabuqi to Alatan Heli) K0+000-K1+300 section;

Semi-closed construction time: April 12 to May 10, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Semi-closed construction section: S312 line (Erenhot to the junction of National Highway 331) K493+119-K499+466 section;

Semi-closed construction time: April 16 to May 16, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(3) Precautions: during the construction period, half of the closed construction, not closed traffic, construction personnel in the road to move operations, during the construction of vehicles and pedestrians passing through the above sections of the road consciously abide by traffic regulations, and according to the construction site signs and traffic signs instructions to be cautious and slow, pay attention to safety.

10. S514 line

(1) Semi-closed construction section: S514 line (Airport Road) K0+000-K3+387 up and down section;

Semi-closed construction time: April 8 to May 15, 2024 (if the project is not completed during this period, it will be postponed to the date of completion of the project);

(2) Precautions: During the construction period, half of the closed construction is adopted, not closed traffic, the construction personnel move on the road, during the construction period, please consciously abide by the traffic laws and regulations of the vehicles and pedestrians who pass through the above sections, and follow the instructions of the construction site signs and traffic signs to drive slowly and carefully, pay attention to safety.

Notice is hereby given

Xilin Gol League Transportation Development Center

April 24, 2024

Highway construction

Notice on the maintenance and construction of national and provincial trunk roads in the territory of Xilin Gol League
Notice on the maintenance and construction of national and provincial trunk roads in the territory of Xilin Gol League

Source: Ximeng Highway, "Ximeng Rong Media See" WeChat public account

Read on