The budgeter summarizes himself

Budgeter's self-summary Chapter 1

  The year 20xx is coming to an end soon, and it has been seven months since I came to the company's budget department in May, and during these seven months, I have done some work and gained some work experience and knowledge. The past work is summarized as follows:

  When I first came to the company, I was responsible for the budget of the plumbing project according to the arrangement of the leader, and then due to the need to take into account the budget of the electrical project, the work has been completed as follows:

  1# 3# building, 4# building, 6# building, garage, police station plumbing and electrical engineering budget. 5# 1# building, 2# building, 3# building, 5# building, 7# building, 8# building, underground garage plumbing project budget and 1# building, 8# building electrical engineering budget.

  1# ground 6# building plumbing project pair.

  In the above work, I found some of my own shortcomings, such as: the grasp of the market price of materials is not accurate enough, the fire alarm and other professional is very strong, the in-depth grasp of things is not comprehensive enough, etc., these are the places that need to be learned and improved in my future work. In order to make faster progress, I decided to do the following in my future work:

  1. Real-time understanding of industry trends and grasping market information;

  2. Make the budget accurate and clear in combination with on-site and change negotiations;

  3. Actively do a good job in the audit of the project and control the cost;

  4. Continue to learn professional knowledge to enrich yourself after work;

  The above is my summary of some of the past work and the expectations and requirements for the future work, in the next work may encounter this or that problem, I believe that I will face the difficulties, meet the challenges, and do a good job within the division. Please correct and criticize the leader!

Budgeter's self-summary 2

  I've been with the company for four years, but I've been working on projects, and I still feel unfamiliar with the budget field. After half a year of budget work, I deeply feel that in order to do a good job in budgeting, we must be patient, steady, and sit still. With the help of my boss and colleagues, I started my budget from scratch to now I can make an independent quotation, which can be said to have made some progress. I am very grateful to my leaders and colleagues who have guided and helped me. During my time in the budget and contract department for most of the year, I felt like Paul said in "How Steel is Made": "When he looks back, he will not regret ...... because he feels that he wasted his time".

  1. I have a lot of cheerful personality and have more communication with colleagues

  Breaking through oneself is a difficult journey, but if you don't break through yourself, you can only stagnate. After moving into the Budget Contracts Department, I also tried more in this area. My colleagues have also helped me a lot in this regard. People have different personalities, and some people are born with communication skills, and I have to rely on the acquired training. In the past six months, I have been thinking about how to change myself, how to make myself more sunny and energetic. I used to be a traditional person and dressed very old-fashioned. Two colleagues helped me choose two clothes, which was a small thing, but it was also a way for me to try out new styles in my outfit, and I still can't thank them enough.

  2. Participate in the calculation of engineering quantities

  After entering the budget department, he participated in the calculation of the engineering quantity for the first time, and calculated the engineering quantity of Zijincheng Fire Protection, Mekeni Water Supply and Drainage, and Huizhou Bainaohui weak electricity during the PK period. Although the speed of calculating the engineering quantity is very slow, everything starts with an attempt, and with the first time, there is no fear of the next 10,000 times. During the PK period, it is necessary to calculate the quantity of the project and quote the quotation, which is often overnight. I changed the QQ screen name to "late return", which means to return with the stars and the moon. In fact, don't remember these hardships and tiredness, what you should remember is that we have broken through together, tried together, and worked hard together. There is hardship and tiredness to grow.

  3. Apply the materials and construction seen on the project to the budget work.

  I have been working on the project for three years, and I have seen all the materials used in the project, and I am familiar with them, although I am not a technical engineer, but I am familiar with the installation methods of various equipment, which has played a role in the process of budget quotation.

  A few shortcomings:

  1. Although communication and expression skills have improved, they are still lacking

  Not being good at communicating with others, and having difficulty expressing myself properly have always been my biggest shortcomings. Coupled with my introverted personality and speaking Mandarin in my hometown, more often I choose to be silent, but this is no longer an era of "silence is golden". In actual work, it is more necessary to communicate and exchange, take the initiative to understand others more, and let others know more about themselves, only in this way can they get along with colleagues happily and work easily and happily.

  2. The level of quotation is insufficient, and the accuracy of quotation needs to be improved

  Although I can now make quotations independently, there are still many problems, and it is difficult to do everything in a comprehensive way. This is due to the proficiency of the offer and the comprehensive level of the offer. At this stage, I can only carry out a preliminary calculation of the engineering quantity and a simple set of quotas for a project, and I am very vague about other aspects, such as some uncommon empirical problems in the process of calculating the engineering quantity, and a series of problems such as fee collection.

  3. The speed of calculating the engineering quantity is slow and not proficient enough

  I felt like a snail when I calculated the quantity of work in the first few times, and it was easy to miss the calculation when adding the quotation and time limit, and the slow speed and anxiety were easy to miss.

  4. Insufficient sensitivity to engineering data

  There are a lot of data involved in the project, such as installed capacity, air-conditioning area and floor area, etc., which seem to have little to do with the budget, but the essence is closely related, they reflect the generalization of the project as a whole, so as a budget officer, you should be able to know these data well and apply them comprehensively.

  5. Lack of overall concept of the system

  Although I have seen all the systems in the project, I am still not familiar with the internal operation of the system. The sound and light alarm was omitted when calculating the quantity of Zijin City's fire protection project, which was caused by the lack of an overall concept of the system.

  6. Lack of proficiency in the use of Century Odds software

  Century Win is one of the essential tools for budgeting. I used to learn more about the quotation on the table, under the guidance of my colleagues, the software quotation only reported the street lamp installation project of Weijing Road, and I was still very unfamiliar with the odds of the century, I knew very little, and I still knew little about the use of software and price adjustment.

  7. Lack of ideas on the construction of departments

  At every departmental meeting, there is a sharing section, and I share the least. There is often a lack of ideas in the work of peacebuilding in the sector, and there is a lack of innovative elements in the work of modeling. I also think about these questions a lot, but I rarely think about them.

  A few improvements:

  1. Open your heart, communicate with more people, improve your communication and expression skills, and expand your social circle. At the same time, you should also pay more attention to your dress, improve your external image, and increase your self-confidence.

  2. More involved in the calculation of engineering quantities

  Quantity calculations, like other skills, become more and more proficient the more you use them. Therefore, in the future, we should participate more in the calculation of engineering quantities, ask more colleagues in the engineer office for relevant skills, and constantly improve our speed and accuracy in the summary, so as to calculate the engineering quantity quickly and accurately.

  3. Strengthen the study of high voltage and weak current, and understand the overall operation mode of the air conditioning systemHigh voltage and weak current have always been two major problems, so these two parts should be listed separately to ask experienced colleagues for advice. It is best to have the opportunity to systematically understand these two major pieces of knowledge next year. It is also necessary to participate in the quotation of air conditioning and understand the composition and operation mode of the air conditioning system.

  4. Participate in relevant training, learn more budget knowledge, and strive to improve your budget level. This year, I participated in the budget officer training in Shanghai, and I learned a lot of knowledge in the course of the class, and applied this knowledge to practical work. Participating in training is the most effective means to improve your quotation skills, so in next year's work, you will also participate in more internal and external training organized by the company, enrich your strength, apply what you have learned, and improve your quotation level.

  5. Focus on strengthening the estimation ability of the project and improving the error detection ability.

  Estimation is actually based on experience, based on a limited number of parameters in the project to calculate the cost of the project. Estimates measure the accuracy of a project's quote. Therefore, it is necessary to ask for more advice, be good at summarizing this experience, and compare the estimate with the quotation, one is to check whether the quotation is wrong, and the other is to accumulate more estimating experience, and apply the experience of these estimation to the next quotation.

  In the budget and contract department for most of the year, I have learned a lot of knowledge, but also accumulated a lot of experience, but this is far from enough, in the future work to continue to learn from the elderly, and colleagues to communicate, learn from each other's strengths, and constantly improve their budget ability, I believe that next year's budget work will do better.

Budgeter's self-summary Chapter 3

  The two years in school have taught me a lot of things, and it is precisely because of these two busy years that I have learned how to use and cherish time, and it has also cultivated my current independent and capable work style.

  Guangsha is different from other schools, militarized management, strict management of hospitals, I used to be unable to figure it out, all of this I fully understood in my practical position. Since I started practicing, my boss has stipulated that I go to work at 9 o'clock, I go to work at 8 o'clock, start working, get off work at 4 o'clock, and leave the company at 5 o'clock. This is not to show how diligent I am, in fact, the boss is looking at it.

  The competition and pressure faced by society are self-evident, and when you are in school, you will hear such words: "It is useless to learn in school, and you will be able to learn everything when you go out......" This sentence is a blank promise, and it is not good to do it now, so how to talk about it in the future. The theoretical basis of school learning is very, very important, and it is a prerequisite for doing a project to make a budget and look at the map, which is the drawing and map reading that we learn in school. The courses arranged by the school are actually very suitable for us, the basic knowledge of the freshman, the professional knowledge of the sophomore, and the application of some software, such as Luban software to learn steel and civil engineering, in fact, this is very good, like the work I am doing now, some are very urgent, all need to be calculated by software, as far as I am concerned, the calculation of reinforcement is very unproficient, so now I must learn quickly!

  I always thought that the outside world was so wonderful and free, but in the past six months, I have tasted all the ups and downs, and I have tasted everything. In the first month of practice, when I first left the campus, I was very immature, and the students majoring in engineering cost were doing the work of a clerk, printing manuscripts, copying documents, and sending materials...... Do everything, in your spare time, memorize the quota by yourself, and look at the cost information on the cost network. In this month, I found that I had so many deficiencies, and the layout of the simplest manuscript was not clear at the beginning, and it was also during this month's adaptation period that I grew a lot and became mature.

  Now I am able to do some small projects, some with other budgeters, and some on my own. During the period, I am also learning the knowledge of bidding, the bidding of the two slope projects in Xiaoshan Evolution Town is in progress, and I will also participate in the bid opening, and I also followed the master to see the scene, and I gained a lot. We all know that it is important for people who are engaged in the cost profession to be certified. For example, I don't have a cost officer certificate now, and I can't write my name on the project visa form I made, and I can't stamp my seal when I do a good project. I'm going to take the cost engineer exam in June next year, so I'll definitely work hard.

  I practice in Yongjia Haitian Certified Public Accountants, and my job position is audit and capital verification. On the first day of work, because I was not familiar with the work of an accounting firm, the master first asked me to start with a simple voucher check and slowly understand the audit process. A week later, I followed the master out to the company, and when I arrived at the company, the teacher and the customer had proper communication, and we started to work intensively. Through the practice in the accounting firm, I learned a lot of things before I graduated, and many things that were not in the textbooks but must be possessed after work. Understand the main scope of responsibilities and organizational composition of the firm's work, learn some necessary office transaction handling skills, understand the latest accounting policies and regulations, and gradually become familiar with the process and key steps of the audit business, and realize the importance of the external audit responsibility as an accounting firm.

  As a trainee, I would like to talk about the management system of the school in all aspects, and many students will have thoughts about the fact that there are teachers patrolling and checking discipline during class. After working in the unit, you will find that the leaders will become patrol "teachers" at any time, and they often come to our office when they have nothing to do. Furthermore, don't think that the theories learned in school are not important, just imagine that we can't even understand the basic accounting entries, you say how do we check other people's accounts, how do we answer some questions that others don't understand, you can't say that I go to ask the teacher first every time. So I give you a little advice, I hope you really take advantage of the current days in school, to master the professional knowledge, so that no matter what, you will always get started faster than those who don't understand, and you will always have an advantage in competing with others.

  Finally, I would like to talk about my experience after practice! Bidding farewell to campus life and stepping into a complex and colorful social family, I deeply realize that campus life is so happy. Finance and auditing itself is a relatively tedious work, and in the face of so many boring accounts and figures, I often feel bored and tired, so that there are many mistakes and omissions, and the more wrong it is, the more annoying it is, and the more annoying it is, the more annoying it is. You must adjust your mentality, as long as you do it with your heart, it will be left and right. The more you do it, the more fun you feel, and the more you do it, the more energetic you become. First of all, I would like to thank my alma mater for its training, and I also wish the younger students a happy study and progress every day.

Budgeter's self-summary Chapter 4

  20xx years have passed, the new year is about to begin, on the occasion of saying goodbye to the old and welcoming the new, review the work of the past year, summarize the experience and lessons of the work of the year, which is conducive to the future work to develop strengths and avoid weaknesses, and better do a good job in technical work, the following is a summary of the work of the past year in several aspects:

  First, the main work of this year:

  As a technician and budget officer of the installation department, I complete the operation and management work of the construction department on time and in accordance with the rules and regulations of the company and the installation department.

  1. Technical management:

  In the past year, we participated in the review of the drawings of 6 new projects, and notified the construction personnel of the review content in a timely manner. After the drawings are reviewed, the construction organization design and technical disclosure shall be prepared in a timely manner and issued to the construction personnel. In the construction process, a number of new projects and projects under construction have been negotiated and changed many times according to Party A's requirements, due to the lack of design drawings to meet the use of functions, temporary changes of Party A often occur in the construction process, and the changes to the visa before construction have been done in a timely and accurate manner, and some can not be visaged before construction, and the visa was carried out immediately after the completion of construction.

  2. Data management:

  For the construction and new projects are in accordance with the image progress of the project, timely and accurate collection of material certificates, material testing, concealed engineering acceptance, inspection batch quality acceptance, sub-project quality acceptance, and timely find Party A's resident land engineer, supervision engineer to sign and seal, so as to achieve the construction data of each inspection batch, sub-division, concealed acceptance, material test date can coincide with the actual construction date, to meet the requirements of data preparation.

  Second, the specific work situation:

  This year's technical management, data preparation, budget and final accounts work mainly have the following characteristics:

  1. Heavy workload: undertake the technical management and data compilation of 17 projects, and provide the material supply plan of each project in a timely manner.

  2. The location of the construction site is scattered, and the trunk line is long: this year, there are 2 residential buildings, Yatou west to the steel cord, east to the technical school, north to the rubber factory, and the construction sites are far apart.

  3. The project involves many construction units and supervision units, and the regular meetings of various projects and supervision are frequent.

  4. Construction of the same community with multiple construction companies:

  In the technical school student apartment, salt industry residential building C#, D#, steel cord workshop, are adjacent to a number of construction companies, the quality of the work, not only personal problems, directly affect the company's reputation.

  In this case, how to do a good job in technical management and data preparation, ensure the quality of project construction, not only satisfy Party A and the supervision party, win honor for the company, but also ensure the compilation and review of budget and final accounts, and the provision of materials, this problem is placed in front of me.

  In view of this situation, we should arrange our work reasonably, distinguish priorities, grasp key points, and take into account other things.

  First of all, with the rubber high-rise, Taixiang high-rise as the focus of the work to arrange a lot of time in the two high-rise residential construction sites, and the use of two high-rise residential construction to the standard floor, the preparation of other engineering budget and final accounts and data preparation, at the same time a large number of reading specifications, process regulations, according to their own mastery of the quality of water, electricity and heating construction of common problems, each process before the construction of the specific construction requirements, precautions, The specification requires a detailed preparation, issued to the on-site construction personnel in a timely manner, and does a good job in quality pre-control, so as to avoid quality problems to the greatest extent;

  While managing and guiding the construction of two high-rise residential buildings, arrange the data compilation work of other construction sites, and often work overtime and overtime to compile the projects that urge the data, so as to ensure that the data can be handed in on time.

  For the project change, the on-site construction personnel are more familiar with the situation, and the construction personnel are not evacuated from the construction site in a timely manner, and the project that requires Party A to draw a floor plan and system diagram is used many times to make computer drawings when the computer is idle at night, so as to change the drainage project The change is larger, and the construction drawings need to be drawn.

  On the last night, I even worked overtime until dawn, and on the day of the workers' evacuation, we completed the change of floor plan and system diagram, and worked with the construction personnel and Party A for on-site visas.

  Due to the fact that there are many small projects in the past two years, and I just took over the budget and final accounts of the installation project last year, I am not very familiar with the work content and procedures, and there are many projects that have not been made before the final accounts, so that at the beginning of the year, there are still a large number of final accounts for the completed projects that have not been prepared in time, and only relying on working time is far from being able to complete the work tasks on time and quality.

  Therefore, at the beginning of the year, part of the completed engineering drawings were left at home, and the budget and final accounts were prepared by making full use of the evening time; among them, the final accounts of many projects such as residential building 3#, office building, and community H# were prepared and completed in the evening, so as to ensure that the final accounts could be completed on time and with good quality.

  For the final account time of the trial project determined by Party A, it is guaranteed to be on call, regardless of the distance, the cold and hot weather and whether the road is icy, so as to ensure that the final account project can be finalized in time.

  Third, the effectiveness of the work

  In last year's work and daily life, it was found that there were some common quality problems in the construction of water, electricity and heating, specifically in the following aspects:

  1. The height of the leakage seal in the bathroom is insufficient, and the elevation difference is large;

  2. The connection between the toilet basin and the drainage pipe is not sealed;

  3. The spacing between the water supply pipeline clamps is too large and the installation is not firm;

  4. The color separation of wires is not clear;

  5. The installation elevation of switches and sockets varies greatly;

  6. There is rust in the disconnection card in the lightning protection box;

  These problems are not only a violation of the provisions of the construction quality acceptance specifications, but also directly affect people's lives.

  In response to these problems, at the beginning of each construction site, specific requirements were put forward to the construction team leader and team leader, especially emphasizing the seriousness of this problem, and patiently explaining to them the requirements in the specification and the harm to people's lives.

  Fourth, there are still problems in the work

  Engaged in the installation of data preparation, budget and final accounts for two years, deeply feel the busyness of the work, the responsibility of the heavy; big things, small things on the body, often pay attention to this end, but ignore the other, a little light-heavy, failed to carry out the work in an all-round system, mainly in the following aspects:

  (1) Lack of corresponding experience, in August, when the company inspected all the engineering data, it did not understand the setting of the inspection points in the inspection batch quality acceptance.

  (2) The supervision and seal of some projects are lagging behind, and the materials entering the site of individual projects are not reported to the supervision party in a timely manner.

  (3) Due to the large number of projects and heavy tasks, individual project data cannot be synchronized with the project.

  (4) For the sake of anti-theft, radiators, switches and sockets are constructed after the installation of doors and windows is completed, resulting in the delay in the project change visa, which affects the preparation of final accounts.

  Although the above problems can not affect the quality of the project and the acceptance of the project, but the "find the shortcomings to catch up with the advanced, based on the fundamental striving for the advanced" as the work policy, always feel that they have not fulfilled the responsibilities of a technician and budget officer, and will strive to do better in the future work.

  5. Plans for future work

  By summarizing the work of the past year, find out the deficiencies in the work, so as to overcome them in the future work, and at the same time, it is also necessary to read more books, conscientiously study the norms and regulations and relevant documents, master professional knowledge, improve their work ability, strengthen their sense of responsibility, and do a good job in personal work in a timely manner.

Budgeter's self-summary Chapter 5

  When the new year is quietly approaching, my 20xx years of work at XX company have come to an end. Over the past year, with the careful care and help of the company's leaders, department managers and colleagues, I have conscientiously studied and comprehended the spirit of the company's corporate culture, kept in mind the company's purpose and mission, guided by the corporate philosophy, obeyed the work arrangement, strengthened learning and exercise, conscientiously performed my duties, and better completed the tasks arranged by the leadership. The thinking and work of this year and the direction of future efforts are summarized as follows:

  1. Report on the work in 20xx

  With the pursuit of ideals and the love of construction, in March 20xx, I came to Construction Co., Ltd. to work in the general management department. During this year's work, I was engaged in the bidding of the company's engineering projects, the sending and receiving of documents, the declaration of professional titles and the sorting of the company's internal files. It has successively participated in the production and binding of more than 20 large and small engineering projects such as the renovation project of the outpatient building of the company's health center, the comprehensive teaching building, the maintenance and renovation project, the project, the low-rent housing project, and the project.

  At the same time, all kinds of documents issued by the superior authorities shall be received in a timely manner and submitted to the general manager and chairman for signature and approval. And after the approval of the spirit of the relevant documents and notices issued to each project department in a timely manner, and at the same time the issued documents are registered. Actively respond to the notice issued by the superior to declare the assistant engineer documents, and organize the company's internal personnel to actively declare, and the number of assistant engineers declared this time is 23.

  In order to further improve the company's internal management requirements, the company's internal archives are newly standardized. Set up the company's archives to register and record the company's internal information according to different years and different projects, so as to improve the company's internal management objectives to a higher level.

  2. Be proactive, correct your work attitude, conscientiously study and comprehend the company's corporate culture, and take every learning and training seriously.

  Conscientiously study and comprehend the company's corporate culture, conscientiously study the company's relevant management systems, procedures and documents, and learn the spirit of the company's relevant meetings and leadership speeches. Through learning, I understand that the company has put forward very concise and incisive requirements for building quality, safe production, operation and management, team building and other aspects. It clarifies the company's future development ideas and key tasks and requirements at this stage. The ideas and ideas of the entire company's corporate culture are consciously and actively implemented into the actual work, and we are guided to better complete each task.

  In order to further establish a correct outlook on life and values, improve their self-cultivation and consciousness, actively join the company's working committee, learn to understand the various lines, principles and policies of the party and the country, and submit an application for joining the party.

  Take every training and learning organized by the company seriously, the company is people-oriented, pay attention to the development of people, care for employees, I empathize, the company spends a lot of manpower, material and financial resources, and frequently organizes various trainings to train employees.

  During this year, I had the opportunity to participate in the learning and training of construction engineering cost personnel, which consolidated my theoretical knowledge, and also learned the business skills in the work, which were also tested in the actual work, which will make me inexhaustible.

  3. Strengthen the study of professional knowledge in various aspects, and strive to improve the level of professional knowledge in all aspects.

  The society continues to develop, the company continues to progress, and the only knowledge we have learned is far from meeting the company's requirements for us. In this regard, I use my business time to learn professional knowledge such as construction cost economic management, construction laws and regulations, and construction contract management specifications, so as to improve my professional knowledge level and business and technical ability, and pave the way for the development of the company.

  Fourth, correctly understand yourself and find out the gaps and shortcomings.

  In this working period of one year, my ideological understanding and consciousness and work ability need to be further improved, there is one-sidedness in the awareness and understanding of some issues, not objective enough, resulting in some negative thoughts in work and life, in the future I will strengthen study, improve ideological understanding, positive and optimistic face work and life.

  In terms of work, the thinking is not clear enough, and there is a phenomenon of wanting to do things well but not doing well. The knowledge required for their position and the business they should engage in are not deep enough, and some problems cannot be considered more comprehensively, and sometimes there are one-sided views and practices on things, which leads to the phenomenon of slacking off in work. The study of the company's rules and regulations is not comprehensive enough, the understanding is not thorough enough, and the company's rules and regulations can not be better reflected in every detail of their work. It is necessary to further strengthen the re-study, re-understanding and re-understanding of the company's rules and regulations.

  In terms of learning, the knowledge learned has not been effectively consolidated. After learning and training, there is no immediate application and operation, which leads to the phenomenon of forgetting what you learn today and tomorrow. In the future, I will study and consolidate the knowledge points I have learned according to the memory cycle.

  Fifth, in the future, we will continue to improve our comprehensive quality and contribute to the development of the company.

  With the rapid development of the company, it can be expected that our work will be more onerous and more demanding, and we will need to master a wider and deeper knowledge. To this end, I will work more diligently, study hard, strive to improve the ideological and cultural quality and business level skills, and make due contributions to the development of the company.

Budgeter's self-summary Chapter 6

  Years go by, time flies, in a blink of an eye I have been working in the company for almost a year, looking back on the work of this year, in the company's leaders and colleagues care and help, I have a deep understanding and understanding of the company's working environment, management mode, organization, rules and regulations, in the ideology, business ability and other aspects have made certain progress, better completed the company assigned to the task.

  In order to do a better job in their future work, sum up their experience and draw lessons, we now summarize the work in the past year as follows:

  1. Earnestly study business skills and actively participate in budget work.

  Having good political and professional qualities is the prerequisite and necessary condition for doing a good job in one's own work. As a budgeter, in the field of engineering budgeting, I am a newcomer, the understanding of the industry is relatively superficial, in order to improve their own quality, quickly adapt to the enterprise environment and work, I continue to work hard to learn, I believe that diligence can make up for clumsiness, in the company's leaders and colleagues with the trust and help, and constantly improve business skills, as soon as possible to adapt to the needs of the job, in a short period of time quickly integrated into this large collective, for the smooth development of the future work laid the foundation.

  2. Obey the work arrangements of the company's leaders, and actively do other work arranged by the leaders.

  I just started to the company and was not familiar with some business processes, thanks to Sister Shen and Sister Cui for their help to me, it was their patient help and teaching that allowed me to complete my own work. Obey the work arrangement of the company's leaders, and take other tasks assigned by the leaders seriously, without shirking or neglecting. Make scientific and reasonable use of time, while completing their own work, actively assist other departments and colleagues to carry out their work, and complete other tasks arranged by the company.

  3. Use the rest time after work to strengthen learning.

  In order to continuously improve my business skills and better serve my own work, I have worked hard to search for some information related to the budget work such as the current quota information documents and the calculation rules of the project, and strengthen the business knowledge such as learning the skills of quantity calculation. Strive to learn computer knowledge, actively and conscientiously study engineering budget software, so as to improve their work efficiency, truly achieve twice the result with half the effort, and make their due contribution to the healthy development of the company.

  Here, I am very grateful to Section Chief Yao and the company leaders for giving me the opportunity to go out to study, through this period of training and learning, I have a deeper understanding of my work, and my work is more serious and meticulous.

  Because the job of a budgeter is to work with numbers, we should be more accurate in our requirements for numbers. When checking the engineering quantity, it should be that each engineering quantity can truly and clearly reflect the actual situation of the project. In the process of checking, in strict accordance with the company's regulations, in line with the principle of seeking truth from facts, each project quantity is carefully compared, so that "two no", no duplication, two no missing items.

  To do this, first of all, it is necessary to understand the reasons for the occurrence of the visa; secondly, it is necessary to examine whether the content of the visa is consistent with the actual situation, whether it is within the scope of the quota, and whether there is any false phenomenon such as duplication and false reporting of the amount of work. Thirdly, those visas with ominous content and incomplete procedures should be returned and redone. In short, I will do every project as accurately as possible.

  I know very well that my experience and practice level are not enough, and I still need to continue to invest in the melting pot of the company to temper, and I also need to continue to devote myself to social practice, constantly improve myself, strengthen my internal quality, be proactive, and adapt to the development of the company.

  First of all, we must have a correct attitude, be down-to-earth, and work hard to complete the work assigned by the superior; secondly, we must constantly improve ourselves, seize every opportunity to learn and grow, strive to improve our business level, and be good at discovering new things and new knowledge related to work in our spare time; finally, we should give full play to our strengths with the attitude of a master and share more work within our capacity for the company.

  I would like to thank all the leaders for providing me with this job, so that I have the opportunity to improve and progress together with you, and thank every colleague for their enthusiastic help and careful care for my work in the past year.

  Although I still have a lot of experience and ability, I believe that diligence can make up for the shortcomings, as long as we understand each other more, communicate more, and make unremitting efforts, I believe that the company will be better tomorrow.

  In the future, I will go on bravely, the company's work is more suitable for me, I really believe that I can do a good job. In short, I still feel my potential in the future, and I believe that I can do well. It is very tempting for everyone to have a better future, and I firmly believe that in the future work, I will go more smoothly and I can go well.

  In fact, there are many things that are unpredictable now, and I don't know my future, and I will continue to work the road in the future!

  I have been working in cost estimation for more than xx years. The number of projects has also increased dramatically, according to the use of quotas, the use of XX provincial building quotas, decoration quotas, municipal engineering quotas, garden quotas, etc. According to the structure, there are brick-concrete structure, frame structure, frame shear structure, etc. According to the number of floors, there are single-storey, multi-storey, and high-rise. According to the use, it is divided into industrial buildings, civil buildings, etc.