laitimes

Key points of Wanda piping threading control

author:Mechanical and electrical world

If you need the original PPT of this article, please reply at the end of the article: piping, and then reply by private message: piping, and the editor will send you a download link.

Common quality problems in piping and threading - unqualified materials

Key points of Wanda piping threading control

Common quality problems of piping and threading - construction control is not available

Standard Points:

1. The spacing between the outlet pipes is small, which affects the waterproof construction

2. The spacing between multiple rows of concrete pipes is small, and the multi-layer pipes are crossed, which affects the quality of concrete vibration

3. The spacing between the booms in the ceiling is large and uneven

4. The piping of the open and dark distribution into the distribution box is uneven, and the grounding of the metal pipe is not standardized

5. The practice of piping through expansion joints is not standardized

6. The use of hoses is not standardized, and there are a large number of bare wires in the ceiling

Related standards, atlases

"Code for Acceptance of Construction Quality of Building Electrical Engineering" GB50303-2015

"Code for Construction and Acceptance of Wiring Engineering of 1kV and Below" GB50575-2010

"Regulations for the Construction and Acceptance of Socketed Tight Steel Conduits, Wires, and Pipelines" CECS120-2007

Electrical piping out of the exterior wall

Key points of Wanda piping threading control

Standard Points:

The spacing between steel pipes (the net distance between steel pipes is not less than 150mm)

Two layers of anti-rust paint on the inner wall of the steel pipe, and two layers of anti-corrosion paint on the outer soil covering

The mouth of the inner wall needs to be flared

Whistle piping

Key points of Wanda piping threading control

Standard Points:

The spacing of multiple rows of concrete piping pipes is small, which affects the quality of concrete vibration and causes leakage of roof panels and basement side walls

The spacing of parallel wire pipes in the concrete shall not be less than 25mm

The thickness of the concrete protective layer on the surface of the pipe buried in the wall or concrete should not be less than 15mm, and the thickness of the concrete protective layer of the buried pipe with fire protection and explosion-proof requirements should not be less than 30mm

Three-layer pipe crossing is not allowed

Exposed piping in the ceiling

Key points of Wanda piping threading control

Standard Points:

The exposed steel pipe should be arranged neatly, horizontally and vertically

The spacing of the fixing points is even, and the fixation is firm

The installation of equipment and lamps in the ceiling needs to be fixed with metal hoses and special joints to eliminate bare wires in the ceiling

Open piping + open box

Key points of Wanda piping threading control

Standard Points:

The exposed steel pipe should be arranged neatly, horizontally and vertically

The spacing of the fixing points is even, and the fixation is firm

The galvanized metal pipe is grounded in the box and connected by tinned with multi-core soft copper wire greater than 4 mm2

Wet places and galvanized layer damage should be treated with anti-corrosion

Plastic PVC pipes do not need to be grounded when entering the box

The pipe is threaded into the distribution box and the guard is intact

Dark piping + dark box

Key points of Wanda piping threading control

Standard Points:

The dark piping should be straight and neat, and the grounding should be good

The pipe mouth is leveled into the embedded box;

Plastic PVC pipes do not need to be grounded when entering the box

The pipe is threaded into the distribution box and the guard is intact

Expansion joint piping

Key points of Wanda piping threading control

Standard Points:

When the pipeline wears the expansion and contraction settlement joint, a metal hose (length can not exceed 2 meters) should be used for the transition, and the line should be grounded during construction

In-tube threading

Key points of Wanda piping threading control

Standard Points:

The color of the phase wire, the neutral wire and the protective ground wire should be distinguished, and the yellow and green double-color wire should be used as the protective ground wire, and the light blue wire should be the working zero line. Yellow, green, and red are phase wires, and white wires are used for switch control lines

Before threading, the wire pipe should first check the protection of each nozzle to ensure that the protection is complete and complete;

After threading, self-inspection and mutual inspection should be carried out according to the specifications and quality evaluation standards, and when it does not meet the requirements, it should be corrected immediately, check the specifications and number of wires, and then carry out insulation tests after inspection

If you need the original PPT of this article, please reply at the end of the article: piping, and then reply by private message: piping, and the editor will send you a download link.