laitimes

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

Zhongjian Puyuan-Fangjia [seven times] visited the house to broadcast the construction progress, update the construction progress of the community, want to know more about the progress, and consult the members of the house visit team.

At the request of fans, I want to take a look at the recent construction progress, and the members of the house exploration team entrusted by the owner arranged to step on the plate, took some pictures of the construction progress of the community, and shared it with you.

In order to facilitate communication, the owner exchange group has been established to help find neighbors, and the owners who buy (Zhongjian Puyuan) can send me a private message, private message content: There is a house to have a home, and the private message automatic reply content is the way to join, after joining to know more neighbors, the benefits of the fans, irregular stepping on the plate to update the construction progress of the community, public welfare housing inspection, etc., it is not easy to step on the plate, welcome everyone to like and share and forward.

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

★ Hello owners and friends, the platform is committed to outputting high-quality, real content of the report, with a fair and just objective perspective, to bring you the most intuitive construction site situation.

★ Our content covers: construction site real shot, house type measurement, house type VR, park real video, etc., so that owners can understand the construction progress of their own real estate in real time.

This time, we came to the Zhongjian Puyuan plot, and the time of stepping on the plate was around 13 o'clock in the afternoon, so you can refer to the situation of the plot. This is the 7th time that Fangjia has stepped on the construction site, and let's take a look at our harvest this time.

★ This article covers:

◆ Overall construction progress

[Construction site + video]

◆ Surrounding environment

Property Introduction

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

Aerial view

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

As of April 21, according to the statistics of the editor, in 2023, a total of 10+113 residential units will be contracted, and the average price of online signing will be about 73,000 yuan per square meter.

[Floor area ratio] 1.5

【Greening rate】30%

[Total Building] 28 buildings

Total number of units: 983

[Parking space ratio] 1:1.3

【Project Address】Dongwei Road, Chaoyang District, Beijing, intersects with Airport Expressway about 700 meters to the south

【Site area】It covers an area of about 61,500 square meters

【Above-ground construction area】The building area is about 92,200 square meters

【Delivery time】Expected to be the end of 2025 (official notice of specific time)

[Project plot ratio] 1.50

【Project greening rate】30%

Outdoor construction progress

[Construction site + video]

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

The real shot of the plot from all angles, the building floors with fast progress are being built, the foundation with slow progress is also tied with steel bars, there are a lot of construction materials on site, and various processing sheds are also working.

Surroundings

Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.
Zhongjian Puyuan-Fangjia [seven times] stepped on the field to broadcast the construction progress.

There is a former reed ditch bus station around!

★ Statement: Fangjia only uses a third-party perspective to make a true and objective report on the construction progress of the owner's visit to the community. Note: The building number is judged by the little brother according to the distribution of the real estate, if there is something wrong, please send a private message to correct;

★ The above is the content sharing of this stepping on the plate, it is not easy to step on the plate, your reading and sharing and forwarding is the greatest encouragement to the Fang family.

That's the end of today's content, for more exciting content, please follow my headline account.

Read on