laitimes

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

author:Fangjia poplar forest
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Poly Tianhui-Fangjia [six times] visited the house to broadcast the construction progress, update the construction progress of the community, and want to know more about the progress, and consult the members of the house visit team.

At the request of fans, I want to take a look at the recent construction progress, and the members of the house exploration team entrusted by the owner arranged to step on the plate, took some pictures of the construction progress of the community, and shared it with you.

In order to facilitate communication, the owner exchange group has been established to help find neighbors, and the owners who buy (Poly Tianhui) can send me a private message, private message content: there is a house to have a home, and the private message automatic reply content is the way to join, after joining to know more neighbors, the benefits of Fangjia fans, irregular stepping on the plate to update the construction progress of the community, public welfare house inspection, etc., it is not easy to step on the plate, welcome everyone to like and share and forward.

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

★ Hello owners and friends, the platform is committed to outputting high-quality, real content of the report, with a fair and just objective perspective, to bring you the most intuitive construction site situation.

★ Our content covers: construction site real shot, house type measurement, house type VR, park real video, etc., so that owners can understand the construction progress of their own real estate in real time.

This time, we came to the Poly Tianhui plot, and the time to step on the plate was around 2 o'clock in the afternoon, so you can take a look at the situation of the plot. This is the 6th time that Fangjia has stepped on the construction site, let's take a look at our harvest this time.

★ This article covers:

◆ Plot construction progress + on-site situation + video

◆ Surrounding environment

Property Introduction

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Aerial view of the Southern District

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Aerial view of the North District

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Tianhui Garden (South)

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Tin Sun Wo Court (North District)

As of April 21, according to the statistics of the editor, in 2023, a total of 291+126 residential units will be contracted, and the average price of online signing will be about 8.2-86,000 yuan per square meter.

【Number of buildings】8 buildings in the north area and 9 buildings in the south area

【Total number of households】332 households in the North District and 494 households in the South District

【Total land area】The north plot is 18,856.66 square meters, and the south plot is 24,387.06 square meters

[Total construction area] 61,784.65 square meters for the north plot and 84,278.94 square meters for the south plot

【Closing time】June 2026

Outdoor construction progress

[Plot construction progress + site situation + video]

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

The plot building is under construction, the building with fast progress has been built with about 6 floors, and the slow progress is still in the construction of the foundation, and a lot of materials such as wood and steel bars are stacked on site.

Real shots of the surrounding area

Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.
Poly Tianhui-Fangjia [six times] stepped on the spot to broadcast the construction progress.

Real photos of surrounding road signs.

★ Statement: Fangjia only uses a third-party perspective to make a true and objective report on the construction progress of the owner's visit to the community. Note: The building number is judged by the little brother according to the distribution of the real estate, if there is something wrong, please send a private message to correct;

★ The above is the content sharing of this stepping on the plate, it is not easy to step on the plate, your reading and sharing and forwarding is the greatest encouragement to the Fang family.

That's the end of today's content, for more exciting content, please follow my headline account.

Read on