laitimes

The President of Colombia witnessed the completion of the 23 MW photovoltaic project in Lefical

author:China Infrastructure News

In faraway South America

The President of Colombia came

Constructed by PowerChina

Site of the 23 MW PV project in Leifikar

Together with the employees of Power Construction

Celebrate the successful completion of the project

The project is a new energy generation in Colombia

A landmark project to replace traditional oil and gas power generation

It has a positive effect on the realization of the global "double carbon" goal

The President of Colombia witnessed the completion of the 23 MW photovoltaic project in Lefical

On April 12, the 23 MW photovoltaic power generation project in Lefical, Colombia, undertaken by PowerChina, was completed. Colombian President Gustavo Petro and Colombian Petroleum President Ricardo Roa attended the completion ceremony.

The President of Colombia witnessed the completion of the 23 MW photovoltaic project in Lefical

President Petro said that reducing the use of oil and gas energy and achieving "carbon peak and carbon neutrality" as soon as possible is an important strategic development goal of the Colombian government. The success of the Lefical PV project is a milestone and marks the great potential of renewable energy generation in Colombia. As the world's top new energy power contractor, we are grateful to PowerChina for bringing China's advanced technology and high-quality equipment to Colombia, actively participating in the construction of Colombia's energy transition, and "co-building, sharing and win-win" with the Colombian people.

The President of Colombia witnessed the completion of the 23 MW photovoltaic project in Lefical

Ricardo said the Refical PV project is the first refinery site PV project in Latin America. Congratulations to the executive teams of PowerChina and Colombian Petroleum for their achievements, and thank the builders for their hard work.

The President of Colombia witnessed the completion of the 23 MW photovoltaic project in Lefical

The total installed capacity of the project is 23 MW, providing 34.29 GWh of clean energy per year to the Cartagena refinery. The project has created more than 400 jobs and made a positive contribution to the employment of residents in the surrounding communities. (PowerChina)

Read on