In the construction stage of the construction project, the mechanical and electrical installation project is a very important project, the current construction acceptance specifications in the mechanical and electrical part of the unit project accounted for a large proportion, mechanical and electrical installation can often create many construction highlights for the project, in order to further improve the on-site management personnel mechanical and electrical installation of the excellent management level and awareness, the content to share with you is the fire pump room installation project details highlight display, I hope you will be inspired and helped.

One

Overall installation requirements

(1) The equipment and pipeline space are reasonably arranged, the function and status of the equipment are clear and accurate, the installation elevation of valves and pipe fittings is unified, and the equipment and pipelines are arranged neatly, in rows (rows), neat and beautiful.

(2) The installation sequence of equipment pipe fittings is reasonable and standardized, fixed firmly, and runs smoothly, without running and dripping.

(3) The drainage ditch is set up in a standardized manner, the slope is reasonable, there is no water accumulation, and when the floor is painted, the ditch and the ground should be separated by different paints.

(4) The electrical layout of the equipment is reasonable, and the lightning protection and grounding connection is standardized.

(5) The equipment foundation is angular, and the support (bracket) base pier is uniformly made of molds and painted to increase the visual effect.

Two

Installation highlights showcased

After the optimization of the floor plan of the fire pump station:

The installation project of the fire pump room is done like this, and there is no fault with it!

The overall arrangement is reasonable, the pipeline is evenly arranged, the valve elevation is consistent, the spacing is reasonable, and the identification is clear:

The installation project of the fire pump room is done like this, and there is no fault with it!

The piping is installed neatly, the pipe topcoat is evenly painted, and the root treatment of the bracket base is delicate:

The installation project of the fire pump room is done like this, and there is no fault with it!

The foundation of the equipment is smooth, the edges and corners are square, and the roots and corners are delicate and beautiful:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The installation sequence of valves, pressure gauges, filters, flexible joints, and eccentric reducer flat joints at the suction pipe is accurate, and the connecting parts are tight and firm, and there is no dripping water leakage:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The electrical bridge line layout is reasonable, the equipment adopts waterproof elbows, and the installation is dexterous:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The color of the drainage ditch and the ground is beautiful, the layers are clear, the drainage slope is reasonable, and there is no water accumulation:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The elbow bracket of the outlet pipe is set up in a standardized manner, the weld is full, and the pier protection is meticulously handled:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

Repeated grounding of equipment and equipment metal housing, safe and reliable:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The through-wall pipeline is tightly plugged and centered beautifully:

The installation project of the fire pump room is done like this, and there is no fault with it!

The water level gauge and overflow pipe are clearly marked:

The installation project of the fire pump room is done like this, and there is no fault with it!

The hydraulic alarm bell of the alarm valve group is set reasonably, the spacing is uniform, the line is arranged in rows, the identification is clear, and the drainage is smooth:

The installation project of the fire pump room is done like this, and there is no fault with it!
The installation project of the fire pump room is done like this, and there is no fault with it!

The Department of Housing and Urban-Rural Development has released!

2023 is a great year for the reform of fire engineering specifications, and the "General Code for Fire Protection Facilities" GB 55036-2022 and the "General Code for Building Fire Protection" GB 55037-2022 have been implemented successively.

When the original specification is abolished and the new specification is implemented, the participating units and even the competent units will inevitably have some confusion in fire acceptance, and the industry urgently needs an authoritative and practical guidance to avoid the problems in fire protection acceptance and prevent and control in advance.

Today, it's coming!

The Department of Housing and Urban-Rural Development organized the compilation of the "Guidelines for the Prevention and Control of Common Problems in Building Fire Protection Acceptance"!

The installation project of the fire pump room is done like this, and there is no fault with it!

Recently, the Provincial Department of Housing and Urban-Rural Development organized the preparation of the "Guidelines for the Prevention and Control of Common Problems in Building Fire Protection Acceptance" (hereinafter referred to as the "Prevention and Control Guidelines") officially published by China Building Industry Press.

The "Prevention and Control Guide" follows the principle of "facing our province, combining prevention and control, and easy to investigate and promote reform", summarizes and sorts out nearly 10,000 engineering construction projects in the province, combined with the experience accumulated by experts and personnel in design, construction, installation, supervision and other units in their daily work and their understanding of the norms, lists two categories (violating the mandatory provisions of the national engineering construction fire protection technical standards and with "strictly prohibited", "must", "shall", "should not", "shall not" The non-mandatory provisions of the requirements) common or typical quality problems, clear normative practices or reference examples, not only analyze the causes of fire protection design problems, but also put forward specific solutions in the form of pictures and texts.

The "Prevention and Control Guide" is divided into 10 chapters, the main contents of which include the general layout, fire resistance level, plane layout, safety evacuation, building structure, fire water supply and fire extinguishing facilities, smoke prevention, smoke exhaust and ventilation and air conditioning common problems and prevention, fire electrical common problems and prevention, fire protection products and fire protection linkage operation common problems and prevention.

The successful publication of the "Prevention and Control Guide" will play a reference role for the daily work of the fire inspection and acceptance staff of the housing and construction departments at all levels in our province and the construction, design, construction and supervision units. The Provincial Department of Housing and Urban-Rural Development will also organize local housing and construction authorities to conduct publicity and training in the near future to improve the level of fire inspection and supervision in our province.

Read on