laitimes

Learning, thinking, and application, unity, knowledge, belief and action, systematic planning, and solving development problems

author:People's Daily Network Hebei

The system concept is a basic idea and working method.

In the second batch of theme education, the majority of party members and cadres in Hebei Xi use systematic thinking and systematic methods to plan work and guide practice, deeply grasp the relationship between the overall situation and the partial, the current and the long-term, the macro and the micro, the main contradiction and the secondary contradiction, the special and the general, strengthen the overall coordination, coordination and cooperation, and form a joint force to solve problems and promote development.

Strengthen departmental linkage

Innovate docking ideas and improve the quality and efficiency of the introduction of central enterprises

On the Chengde Dam, the cold wind blows strongly. Standing on a high place and looking into the distance, I saw a forest of windmills, paddles dancing vigorously, coupled with the blue sky and white snow, a magnificent picture of the outside of the plug!

There is also an invisible picture scroll that is being extended here - not only to be a "large installer", but also to create a "China Green Hydrogen Valley".

"Hydrogen energy has the characteristics of diverse sources, efficient utilization, clean and environmental protection, and wide application, and is an important direction for global energy transformation and upgrading. Recently, Wang Haijun, head of the central enterprise docking service center of Chengde State-owned Assets Supervision and Administration Commission, told the author, but for a long time, the high operating costs of intermediate links such as transportation and storage have become a major obstacle to the popularization of hydrogen energy.

To prevent storage and transportation from being "stuck", Chengde urgently needs to introduce enterprises with technical advantages in related fields. After several considerations, they set their sights on China Energy Conservation and Environmental Protection Group Co., Ltd. (hereinafter referred to as CECEP), the only central enterprise in mainland China whose main business is energy conservation, emission reduction and environmental protection, and has strong technical advantages in clean energy storage and transportation.

The introduction of second- and third-level subsidiaries of central enterprises and innovative business sectors is a system engineering, and it will not work alone. Chengde has set up a central enterprise docking service center in the Municipal State-owned Assets Supervision and Administration Commission, set up special work classes at the city and county levels, and set up 7 industrial investment docking groups according to the local industrial development positioning, forming a four-tier work leadership mechanism of municipal leaders, municipal central enterprise docking service centers, work classes, and investment docking groups, so as to achieve the same pace up and down.

Starting from September 2023, Chengde SASAC and Chengde Heating Group Co., Ltd. actively connected with CECEP, and introduced CECEP New Energy Investment and Development Co., Ltd., a third-level subsidiary of CECEP, by taking advantage of the good cooperation foundation between CECEP and Chengde Heating Group.

"We have the technology advantage, but we lack the resources, and Chengde has plenty of clean energy. Li Gang, vice chairman of the company, said that on November 17, 2023, the company as a whole moved from Beijing to Shuangqiao District, Chengde City, and will actively cooperate with Chengde Thermal Power Group and Chengde's clean energy company in the future to integrate hydrogen energy storage and transportation and energy-saving technologies to form a strong competitive advantage.

Since the launch of the second batch of theme education, Chengde has observed things from the perspective of universal connection, comprehensive and systematic, development and change, innovated docking ideas, adopted more diversified methods, highlighted "accuracy", improved "hit rate", and continuously improved the quality and efficiency of the introduction of central enterprises.

"There is a new generation" to enhance the level of cooperation. Actively seek to cooperate with new projects with central enterprises that have been settled, so as to register new companies. Huaneng Group has invested in a number of clean energy projects in Chengde. Chengde City actively contacted it, and Huaneng Group registered one third-level subsidiary in Chengde County, Weichang Manchu Mongolian Autonomous County and Longhua County.

"And the flowers bloom" to extend the industrial chain. Aiming at the central enterprises that have landed, we will adopt the methods of attracting investment by business and industrial chain, and introduce subsidiaries of central enterprises. Guohua Investment Co., Ltd. and Fengning Manchu Autonomous County have implemented the Guohua Clean Energy Industrial Park project on the basis of the original cooperation.

"Borrowing chickens to lay eggs" to upgrade the new platform. Promote the cooperation between enterprises in Chengde and relevant central enterprises in the form of "merging similar items", and become subsidiaries of central enterprises through mergers and acquisitions, so as to obtain more capital injection and larger market share, and become bigger, better and stronger on the new platform.

"Fund introduction" leverages the door of central enterprises. Explore the establishment of strategic investment funds or industry guidance funds with central enterprises, and use the fund as a "medium" to attract central enterprises to land.

Since 2023, Chengde has introduced a total of 30 central enterprises, of which 21 are newly registered and 9 have moved in from Beijing or other provinces, and the number of central enterprises introduced has reached the highest level in history.

Think about the problem comprehensively

Carry out the "Party and Mass Service Bazaar" activities to solve problems for the masses and enterprises

In August 2023, Raoyang County suffered heavy rain and flooding. Luhan Village, Dayin Village, was the hardest-hit flood-stricken village, and more than 10 acres of sheds and more than 20 acres of pear trees and field crops planted by villager Wang Xipeng were all flooded. After the disaster, based on the foundation of the local meat donkey industry, he decided to develop the breeding industry.

The development of the meat donkey industry requires at least hundreds of thousands of yuan, and Wang Xipeng can't come up with so much money at all. Later, a neighbor told him that there was a stall in the village called the "Party and Mass Service Bazaar" that could reflect the problem.

Wang Xipeng decided to go to the market to "try his luck".

Unexpectedly, on the "Party and Mass Service Bazaar", there are not only government departments, but also financial units. By comparing the preferential loan policies of various banks, he found a loan product that suited him, and borrowed 200,000 yuan and 300,000 yuan from the Postal Savings Bank and the Industrial and Commercial Bank of China respectively.

Taking the theme education as an opportunity, from November 4, 2023, the Organization Department of the Raoyang County Party Committee organized the "Party and Mass Service Bazaar" activity. The activity is matched by the party organization, and the functional departments of towns and villages, counties and social organizations participate together to solve problems for the masses and enterprises. Lei Boning, member of the Standing Committee of the Raoyang County Party Committee and head of the Organization Department, said that in the activity, they combined all aspects of factors to analyze and think, set up three types of booths, and established three ledgers to ensure that the reasonable demands of the masses are properly resolved, and promote the theme education to go deeper and more practical.

In order to meet the diverse needs of the masses who "catch up with the market", the Organization Department of the county party committee instructed all towns to reasonably set up three types of booths: "people's support booths", "relief booths" and "service booths".

The town party committee has set up a "people's support booth", with the town's deputy section-level cadres serving as the "stall owners" to record the demands of the masses; the functional departments directly under the county government have set up "relief booths", and the "stall" departments have organized groups to deliver services such as benefiting farmers, financial credit, and free health clinics to the grassroots level; and village party branches have set up "service booths" to provide public welfare services to the masses on the spot.

"In order to do the people's affairs well, we have established three ledgers: 'people's sentiment ledger', 'task ledger' and 'service ledger'. Liu Jingmao, deputy director of the Organization Department of the Raoyang County Party Committee, introduced.

Before the start of the activity, the party members of the joint household visited the masses of Baolian, collected the problems and demands, formed a "people's sentiment ledger", and reported to the town party committee in the village; according to the feedback information of the township party committee, the organization department of the county party committee classified the people's needs, coordinated with the county-level functional departments, and formed a "task ledger"; after the end of the activity, the departments that received the task of "stalling" sorted out the unsolved problems and other situations to form a "service ledger". For the problems that have not been solved, the organization department will convene relevant departments to jointly study and solve them.

Up to now, the county has organized 8 phases of the "Party and Mass Service Bazaar", and solved more than 600 reasonable demands for enterprises and the masses on the spot.

Strengthen the construction of mechanisms

Build a new model of "series + parallel" fast approval to help project approval run out of "acceleration"

Qinhuangdao Economic and Technological Development Zone, December 29, 2023. Ding Dapeng, the project manager of the Coastal Machinery Intelligent Manufacturing Factory of Coastal Machinery Manufacturing Co., Ltd., is busy communicating with the construction unit and making final preparations for signing the construction contract of the intelligent manufacturing factory.

Previously, Ding Dapeng got the "Engineering Construction Project Rapid Approval Point Table" from the Administrative Examination and Approval Bureau of Qinhuangdao Economic and Technological Development Zone, and quickly completed the approval work of the construction permit stage, only to sign a contract with the construction unit. In this table, there is a QR code behind each approval item, from which we can also view the detailed process, and we can have a clear idea of the approval progress. ”

Since 2023, Qinhuangdao City has carried out 8 municipal-level special rectifications, including "Outstanding Problems in Optimizing the Business Environment". Since the launch of the second batch of theme education, the Administrative Examination and Approval Bureau of Qinhuangdao Economic and Technological Development Zone has conscientiously carried out anatomical research in view of the problems existing in the approval of the project.

There are detailed guidance for each approval link, and the required materials and approval requirements are easily available online. Why can't enterprises complete the approval process smoothly?

For this problem, the staff of the bureau has carried out comprehensive and systematic thinking and combing. They found that the approval of general industrial projects is divided into four major stages: project approval and land use planning permission, engineering construction permit, construction permit, and completion acceptance, and each major stage contains several small stages, involving multiple departments, and each department has its own processes and requirements.

"Every project has its own characteristics, and the approval process is different. Tian Xiaojun, director of the bureau, said that it is necessary to sort out a comprehensive list of approvals, and then implement "one policy one policy" based on the actual situation in order to provide good services for enterprises.

To this end, the Administrative Examination and Approval Bureau of Qinhuangdao Economic and Technological Development Zone has produced the "List of Rapid Examination and Approval of Engineering Construction Projects", which takes the four major stages of examination and approval as the first-level horizontal header, the eight small stages such as the filing of enterprise investment projects as the second-level horizontal header, and the 34 approval items involved as the longitudinal header.

"We draw a thick line in the horizontal box corresponding to the approval item, the beginning of the line segment is the time to start preparing the approval materials, and the end of the line segment is the time that needs to be completed. Tian Xiaojun said, "The horizontal axis of the form is the serial approval stage, and the vertical axis is the parallel approval project. ”

The new model of "series + parallel" rapid approval helps project approval to run out of "acceleration", makes it more convenient for enterprises and people, and stimulates market vitality and social creativity. (Zhao Jian, Li Jiancheng, Sun Yeda, Ji Jingjing)

Source: Hebei News Network