laitimes

In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward

author:China Industry Network

Original title: Heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward

Workers' Daily-China Workers' Network reporter Mao Nongxi correspondent Du Mingyang Li Yong

On December 15, heavy snowfall fell in Shangzhou District, Shangluo City, Shaanxi Province, located in the depths of the Qinling Mountains, with a snowfall depth of more than 10 centimeters, and the snow on the ground was slippery, which had a great impact on road traffic safety. The cadres and workers of the first branch of the 3rd section of the West 10th High-speed Railway of the China Railway Seventh Bureau, located in Sanchahe Town, Shangzhou District, stepped forward to give full play to the advantages of equipment, organize snow and ice removal, ensure the smooth flow of nearby roads, facilitate the masses, and ensure production.

In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward
In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward
In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward
In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward
In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward
In the heavy snow in Qinling, the West 10th Project Department of China Railway Seventh Bureau stepped forward

The employees of the first branch of the 3rd bid section of the West 10th High-speed Railway of China Railway Seventh Bureau took the initiative to organize more than 50 people to mobilize 6 loaders, 4 pickup trucks, 16 tons of industrial salt, small trolleys and brooms, and clean up the snow of 15.7 kilometers of construction roads and 3 mixing stations in three work areas under the jurisdiction of the project. The snow has been falling, and the employees are not afraid of the cold, with a clear division of labor, full of enthusiasm, and are busy with their work. Everyone shoveled, pushed, swept and sprinkled (salt), tacitly cooperated and worked together to shovel up the snow and ice layer little by little and pile it up. Shovels fly, brooms dance, snow shovels, ice breaks, and ...... Busy figures form a beautiful landscape in the snow. After more than 4 hours of hard work, the construction road, tunnel doors, and the road surface around the station were cleaned and cleaned, and the ice was also removed in time.

Subsequently, the employees also threw industrial salt on the Lilong Road (county road) in front of the project department to ensure that the road was not icy, which not only ensured the safety of the project transport vehicles, but also provided safety and convenience for the residents of Sanchahe Town, and was praised by local residents.

Source: Workers' Daily client