Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

author:Modern decoration of Qeeka Home

Everyone has many firsts in their lives, the first time they learn to ride, the first time they learn to cook.... The first time it was hard to learn the skills you wanted to learn, and decoration was no exception. For the first renovation of my family's first new house, I also did my homework for a month, visited many foremen and owners after the renovation, and only then did I clarify the whole process and the details of the decoration.

Today, I will share the decoration knowledge I learned with you, hoping to help the friends who are preparing for decoration!

Before decorating, we must fully consider these 4 things ↓↓↓

1. What is the budget left for decoration, your needs for home improvement, simple or luxury?

2. Does the overall layout of the rough room need to be changed? Is there anything unsatisfactory? How big do you want to buy furniture and appliances?

3. After the size of the furniture is determined, determine the water and electricity points according to the living needs of the family.

4. The basic materials to be selected are similar, such as tiles, floors, cabinets, doors and windows, etc.

Determine your budget and needs before renovation, the decoration process can be smoother.

Next, I learned to draw a sketch of the whole process of decoration after a month ↓↓↓

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

Later, I optimized it a little and sorted out the complete flowchart:

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

Novice owners must be dizzy at first sight, don't worry, I'll slowly break it down into the process of each day, and tell you in detail.

Decoration generally begins with the handover

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

1. Start of construction disclosure: the designer, owner, construction team, supervision four parties to the scene to communicate and report, clarify the construction process, standards and construction of the addition or decrease items.

Note: If you need to remove it, check the balconies, doors and windows, water heaters, etc. that need to be preserved in advance to ensure that they are not damaged before proceeding to the next step.

2. Demolition

3. Hydropower disclosure

Note: It takes 3 days for floor heating and central air conditioning installation, and 2 days for fresh air system installation. Heating modification, gas meter displacement, brick selection, measuring cabinets, measuring windows, these can be completed before the bottom is handed over.

Foundation construction generally starts with hydropower

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

4. Hydropower transformation: Before the transformation, the hydropower materials should be notified to enter the site in advance. During the decoration process, pay attention to the depth and diameter of the water and electricity grooves and the angle of the air conditioner holes.

During the renovation of water and electricity, window installation and entrance door dimensional measurement can be arranged at the same time.

5. Hydropower acceptance

Note: Strictly compare the design drawings during acceptance. After acceptance, you can purchase relevant hardware accessories and panels according to the switch panel configuration given by the bookstore master.

6. Indoor structure transformation: can be carried out at the same time as water and electricity transformation.

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

7. Filling and kitchen and bathroom wall cement leveling: The wall leveling work can not be less, and the balcony insulation project can be done together.

Note: Remember to say hello to the downstairs neighbor in advance, because to carry out the closed water test and waterproof effect test, you can go downstairs to check the effect.

(Mini programs have been added here, please go to Toutiao client to view)

8. Kitchen and bathroom and balcony do waterproof and closed water test

9. Kitchen and bathroom and balcony wall tiles

10. Tiling and leveling of cement floor

Note: After pasting the rotation must do a good job of ground sprinkler maintenance, all ground should be taken care of, during this period can arrange the installation of water heaters, flue check valves, smoke pipes, change gas pipes, and then notify the kitchen and bathroom ceiling manufacturers to measure door-to-door

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

11. Carpentry for suspended ceiling, background wall, etc.:

12. Wall and top plaster leveling: Paste plaster line after the leveling work. During this period, you can go to the building materials market U-shaped gutter, toilets, sanitary ware, furniture, appliances and so on. At the same time, arrange a home manufacturer to visit the home for measurement.

Note: At the latest, buy good paint before scraping putty, some workers brush different paint habitually with different tools, remember to say hello.

13. The oiler scrapes the putty 2~3 times

Note: You can't paint on rainy days, and the paint is difficult to dry through; Wind and dust weather can not be painted, there will be dust particles attached to the brushed paint surface.

14. Putty sanding

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

15. Paint one bottom and two sides or paste wallpaper: at the same time, you can carry out kitchen and bathroom ceilings, install switch socket panels and home lamps.

At this point, the basic hard installation is over, and the rest of the work is installation, cleaning and ventilation.

PS: Remember to notify the flooring merchant 10 days in advance to measure and test the ground condition to see if it meets the conditions for laying the floor.

Staying up late for 3 days to sort out the home improvement process 20 steps, the construction is accurate to every day, I see who dares to fool me

Later installation of the main material