Chengle Expressway
It is a golden tourist expressway in Sichuan Province
September 30
The reporter learned from the Sichuan Jiaotong Jianle Expansion Construction E2-SG2 project
With the completion of the last section of guardrail markings
It marks the territory of the Leshan section
The right section of the main line is fully completed
Chengdu to Leshan can enjoy a smoother driving experience
Spacious four lanes, brand new pavement, clean markings... In the E2-SG2 section of the Chengle Expressway expansion construction, the original one-way two-lane has been expanded to four lanes. At about 4:30 p.m. on the same day, the traffic conversion was officially completed on the left and right sides, which also marked that the follow-up construction will be fully transferred to the left side, and gradually promote the construction of various projects such as road surface and traffic security.
Chengle high-speed expansion construction E2-SG2 lot with a total length of 31.06 kilometers, since the closure of the road section successfully completed the traffic conversion on June 2, all staff to overcome difficulties, give full play to the maintenance branch road construction fine tradition and professional advantages, grasp each construction period node, not only successfully completed the right half of the construction task, but also completed the left half of the 7 km construction task, greatly alleviating the pressure of the second phase of the whole line traffic organization, providing a strong guarantee for the National Day Golden Week travel.
The reporter learned
This traffic is in the direction of Chengdu to Leshan
It is expected to be the end of this year
The Leshan section of the Chengle Expressway will be open to traffic in both directions
(Courtesy of Sichuan Communications Construction Group)
(Zhou Liu)
Source: Leshan Release