laitimes

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

author:Interesting facts about life

Chengdu-Leshan Expressway, referred to as "Chengle Expressway", also known as "Chengle Expressway", is a tourist expressway in Sichuan Province, connecting Chengdu city and Dileshan City, with a total length of 86.834 kilometers, officially opened to traffic on December 28, 1999. In recent years, due to the increasing economic exchanges between Chengdu and Leshan, the rapid growth of traffic flow of Chengle Expressway, has greatly exceeded the maximum saturation threshold of road design, in order to adapt to the commercial exchanges between Chengdu and Leshan and the normal exchanges between residents between the two places, the transformation and expansion of Chengle Expressway has become an urgent matter of people's livelihood.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

The Chengle High-speed Expansion Construction Project line starts from the Sichuan-Tibet Interchange of the Third Ring Road in Chengdu, and includes the main line and the Leshan Urban Transit Double Line. Among them, the main line passes through Wuhou District, Shuangliu County and Xinjin County of Chengdu City, Pengshan County, Dongpo District and Qingshen County of Meishan City, Jiajiang County and Shizhong District of Leshan City, and the main line of Leshan Section is about 31 kilometers long. The main line is divided into three sections, (1) the starting point of the third ring road ~ the main line toll station section, all newly built, the design speed of 80 km / h, two-way six lanes, the width of the roadbed 28.5 meters; (2) the main line toll station ~ Qinglongchang interchange section, all newly built, the design speed of 120 km / h, two-way eight lanes, the width of the roadbed 42 (41.5) meters; (3) Meishan interchange ~ Gu Liba interchange section, the original road widened, the design speed of 100 km / h.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

The Leshan to Meishan Qinglongchang section will widen the original road to two-way eight lanes; the Chengdu to Qinglongchang section will build a new two-way eight-lane double line, starting from the third ring Road Sichuan-Tibet interchange, and the two sections will be connected, which will become a new Chengle Expressway with a total length of more than 130 kilometers (including the main line and the Leshan urban transit complex line, of which the main line of the project is 127.622 kilometers long (Chengdu 37.966 kilometers, Meishan 59.076 kilometers, Leshan 30.58 kilometers); Leshan urban transit complex line is 8.502 kilometers long). The project will also build an Emei connection line to Emeishan City through a two-way six-lane highway at the Chengle Expressway Jiajiang Interchange. The section from Chengdu to Qinglongchang costs more than 300 million yuan per kilometer, making it the most expensive highway section in China.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

Recently, with the completion of the last section of the guardrail marking line, the right side of the main line of the Leshan section of the Chengle Expressway was successfully completed and officially opened to traffic, and the direction from Chengdu to Leshan was expanded from the original one-way two-lane to four-lane, and the traffic travel was more smooth. Since the successful completion of the traffic conversion of the closed road section on June 2 this year, the E2-SG2 project department of the Chengle High-speed Expansion Construction Project has overcome difficulties and carefully organized, and more than 1,200 construction personnel have worked day and night to actively and steadily promote the production task, not only successfully completed the right-hand construction task, but also completed the left-width 7-kilometer construction task, which greatly alleviated the pressure on the second phase of the entire traffic organization.

It is reported that at present, the main line foundation project of the Leshan section of the Chengle Expressway is 100% complete, the pavement project is 53% complete, and the bridge project is 98.6% complete. The right side is completed and opened to traffic, the left and right sides are officially completed the traffic conversion, and the follow-up construction will be fully transferred to the left side, and gradually promote the construction of road surface, traffic security and other projects, and it is expected to achieve full line penetration by the end of the year. Up to now, the 15 kilometers on the right side of the main line from Meishan South to Qingshen section of the Chengle Expansion Project have been successfully completed and opened to traffic.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

As of October, the Qingshen Toll Station, a supporting project of the Chengle High-speed Expansion Project, was officially put into operation. Qingshen Toll Station is located in Jinhua Village, Xilong Town, Qingshen County, with a total of nine toll lanes of "four in and five out", the toll station integrates a large number of Qingshen characteristic bamboo culture and Sudongpo cultural elements, and at the same time, it has completed 5 ramps and 4.5KM Qingshen connection lines. At present, only small vehicles from Chengdu to Qingshen can get off the highway from the Qingshen toll station, and until December 31 this year, Qingshen to Leshan and Leshan to Chengdu can be fully opened to traffic.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

The two cities of Leshan and Meishan, through which the Xinchengle Expressway passes, are very rich in tourism resources, and their outstanding features are the organic integration of natural landscapes, cultural relics and monuments, and cultural landscapes. Thousand Buddha Rock is located 3 kilometers west of Jiajiang County, Leshan City, Sichuan Province, Jiajiang Thousand Buddha Rock is a cultural relics scenic spot that combines natural landscape and cultural landscape. The main cultural relics and landscapes are: provincial key cultural relics Tang Dynasty Moya statue, Golden Statue Temple, Song Dynasty Zifu Cave inscription, the country's first handmade paper museum, ancient boardwalk ruins, Dianjiangtai ruins, Juxian Street residences, Guandi Temple, Golden Dragon Temple, etc.

Great, Chengdu to Leshan high-speed expansion has made a breakthrough, along the way the people are blessed

After the completion of the project, the delivery will greatly shorten the mileage from Chengdu to Leshan and Meishan, reduce the driving time, greatly increase the number of tourists in Leshan and Meishan, and realize the goal of tourism to promote economic development. The project will also greatly alleviate the traffic pressure in and out of Chengdu city in chengle and chengya expressways, and there will be one more channel in and out of Shuangliu airport. Dear netizens, welcome you to pay attention to me and bring you more fresh and warm traffic and life information. You are welcome to leave a message, collect, share, forward, and grow together.