laitimes

State Grid Xiangxi Power Supply Company "warms up" for Zhouqing Power Preservation Work

author:Xiangxi Net
State Grid Xiangxi Power Supply Company "warms up" for Zhouqing Power Preservation Work

Check the operation of the equipment

Xiangxi Network, September 17 (Correspondent Yang Dong Jia Ming) Xiangxi Prefecture's 60th anniversary of the state celebration is imminent, in order to ensure that the work of the state celebration of power protection is foolproof, on the afternoon of September 15, the State Grid Xiangxi Power Supply Company held a joint anti-accident drill for the 60th anniversary of the state celebration of power protection, in order to test the disposal ability of the power protection personnel in actual combat, and to ensure the safe and reliable power supply during the state celebration with sufficient preparations.

The person in charge of the company stressed that the power supply work of Zhouqingbao has entered a critical period, and it is necessary to comprehensively test the perfection of the emergency plan, find the weak links and hidden dangers in various types of plans, and improve the emergency response level of each power protection site, which is the necessity of organizing emergency drills.

In order to comprehensively test the emergency handling ability of various fault situations, the drill set up a total of three drill scenarios, namely simulating the main power supply fault trip of the State Cultural and Sports Convention Center, the trip of the main power supply fault of gloria Hotel, and the loss of power at the main power supply point of The Phoenix Hotel in Phoenix County. At the same time, in order to ensure the authenticity of the drill and test the timeliness of the on-site power preservation personnel, in this drill, the on-site simulation and second reading timekeeping method is adopted, and after the "failure" occurs, the on-site drill personnel carry out emergency disposal work such as transferring loads, inspecting lines, and inspecting equipment in accordance with their respective responsibilities, and must restore normal power supply in the fastest time, and at the same time, the supervisors also evaluate and record the disposal process of the drill personnel and the emergency response status of the on-site personnel in a timely manner to ensure that the timely drill achieves practical results.

Through this emergency drill, the implementation of various preliminary measures of Zhouqing Power Protection was comprehensively tested, and the "warm-up" of Zhouqing Power Protection Work was carried out in advance, and the details of power protection such as communication lighting, on-site duty, and traffic protection were further accurate. The company said that all electric power personnel will have a high sense of responsibility, rigorous and meticulous work style, give full play to the advantages of teamwork, and ensure the successful completion of the task of state celebration power protection.

(Xiangxi Network)

(Yang Dong, Jia Ming)

(Teng Jia)

Read on