laitimes

Super station, scheduled to open at the end of the year!

author:Released in Guangzhou, China

Super station - Guangzhou Baiyun Station

Another important development!

Super station, scheduled to open at the end of the year!

recently

Guangzhou Baiyun Station

Integrated transportation hub integration project

(Baiyun Station Comprehensive Hub)

The main structure of the supporting station project was capped

Mark the project

The civil works were all completed

It laid a solid foundation for the opening of operation at the end of the year

Super station, scheduled to open at the end of the year!

Guangzhou's first urban rail transit

A large hub station where 6 lines intersect

Baiyun Station Comprehensive Hub

It is the first urban rail transit in Guangzhou

A large hub station where 6 lines intersect

Super station, scheduled to open at the end of the year!

▲ Rendering of Guangzhou Baiyun Station (data picture)

The supporting station projects mainly include Fangbai Intercity, Line 8 North Extension Transfer Channel, Line 12, Line 8 North Extension Branch Line, Foshan Metro Line 8, New Line Metro Reservation Project, bus hub, tourist depot, long-distance hub, operation center, East Square, West Square, road in the field and supporting foundation pit enclosure structure engineering.

Super station, scheduled to open at the end of the year!

thereinto

Fangbai Intercity, Line 12

The northern extension of Line 8 is here

There are three underground stations

Foshan Metro Line 8, New Line

There are two underground stations

Interchange passage of the northern extension of Line 8

Connect with the existing Shitan Station for transfer

The bus hub, tourist depot, long-distance hub and operation center are all three-story underground and three-story aboveground structures, and the east and west squares are two-story underground sunken squares.

The hub command and dispatch center, public facilities rooms, bus lanes, and long-distance lanes are located in the podium on 3 floors above ground, and the 3 underground floors are reserved for development space and underground parking lots.

Super station, scheduled to open at the end of the year!

Guangzhou Baiyun Station comprehensive hub construction site (data picture)

"Yunshan pearl water, kapok open"

The exterior of the building has unique Lingnan characteristics

The main station building of the station is adopted

Unique Lingnan characteristics

"Yunshan pearl water, kapok open" appearance shape

A large number of advanced design concepts and building technology are used

Each "petal" of the station building extending outward

It echoes the flower kapok of Guangzhou City

It shows Guangzhou's city business card and green ecology

Super station, scheduled to open at the end of the year!
Super station, scheduled to open at the end of the year!

Infographic

China Railway No. 4 Survey and Design Institute

Huang Bo, the general manager of Baiyun Station project design

Previously said in an interview

The newly built Guangzhou Baiyun Station

It will become a new urban landmark in Guangzhou

Super station, scheduled to open at the end of the year!

The super station is full of highlights

Guangzhou Baiyun Station

It is located in the south of Baiyun District, Guangzhou

To the south, it is about 5 kilometers away from Guangzhou Railway Station

It is about 20 kilometers north from Guangzhou Baiyun Airport

It is one of the largest railway station complexes in Asia

After the completion of the project

It will undertake Guangzhou Railway Station and Guangzhou East Railway Station

All general speed buses

In addition to the unique appearance of the building

Construction of Guangzhou Baiyun Station

It is also full of highlights

"Super Station"

It covers an area equivalent to 4 Guangzhou South Railway Stations

Guangzhou South Railway Station, which has the highest passenger flow in China

It covers an area of 615,000 square meters

The total area of Baiyun Station is 2.63 million square meters

It is 4 times the size of Guangzhou South Railway Station

Super station, scheduled to open at the end of the year!

Renderings

Guangzhou Baiyun Station will

According to the construction concept of "Greater Bay Area on Track"

Build to be

A world-class modern comprehensive transportation hub super-large railway station

The station is retractable and the square will breathe

In order to solve the problem under a specific node

People flow to solve the problem

Guangzhou Baiyun Station Innovation Proposal

"Retractable station, breathing square"

Smart concept

Create two breathing squares in the east and west

Super station, scheduled to open at the end of the year!

Renderings

  • Usually, the square not only integrates the functions of landscape leisure, but also becomes a space for display and performance, allowing passengers to feel the cultural atmosphere of Guangzhou while waiting for the train.
  • During the Spring Festival, the breathing square can be retracted into an "elevated waiting room" to accommodate three times more passengers.

According to the plan

Guangzhou Baiyun Station

It is expected to be completed and operational by the end of 2023

At that time, the project will be developed for the national railway

Building a "Greater Bay Area on Track"

Inject new effective power

Soon, Guangzhou citizens will be able to take the high-speed train in the city center to accelerate the way to other cities in the province and China. The time and space distance between various parts of the Guangdong-Hong Kong-Macao Greater Bay Area will also be further narrowed.

At that time, Guangzhou Baiyun Station, in addition to the concentrated general speed train to continue to serve the general public, there are also some high-speed rail, intercity trains and a number of subway lines gathered here, which will become the largest transportation hub and new landmark building in Baiyun District.

See you at Guangzhou Baiyun Station at the end of the year!

Source | Guangzhou Metro, Guangzhou Daily, Guangzhou Baiyun Release, China Railway