laitimes

The picture says that | power! Project construction

author:Zhidongying

The spring day is clear, and the busy figure can be seen everywhere in Dongying at this time. Medical workers, grid members, public security officers, community workers, volunteers running on the front line of epidemic prevention and control... They built the most solid protective wall for Dongying. At the same time, we also saw a construction site with roaring machines, a production scene in full swing, and a boom in project construction everywhere.

The picture says that | power! Project construction

  A few days ago, the storage tank foundation of the 2022 provincial major project Shengli Oilfield Dongying Crude Oil Depot Relocation Project located in Niuzhuang Town, Dongying District, is under intense and orderly construction. It is reported that Dongying Crude Oil Depot is the largest crude oil reserve depot in Shengli Oilfield, and since its completion in 1986, it has cumulatively resold 870 million tons of crude oil for Shengli Oilfield. At present, the relocation project of the 36-year-old large oil depot is under intense construction.

Correspondent Miao Hongwei

The picture says that | power! Project construction

  A few days ago, in the gas equipment production workshop of Shandong Kerui Oil and Gas Equipment Co., Ltd., workers are producing and testing a set of intelligent equipment for flue gas capture and injection. It is reported that the equipment can make full use of a large amount of carbon dioxide emitted during the combustion process of the boiler to assist in the thermal recovery of heavy oil, to achieve the resource utilization of flue gas, not only to improve the development effect, but also to greatly reduce the greenhouse gas emissions in the production process of heavy oil in the oilfield, which is of great significance to promoting the low-carbon green development of heavy oil and improving quality and efficiency, and to achieve "carbon neutrality".

Correspondent Wang Liang

The picture says that | power! Project construction

  Recently, in the production workshop of the gas equipment division of Shandong Kerui Oil and Gas Equipment Co., Ltd., workers are rushing to produce a batch of reciprocating compressor equipment for export to Nigeria. At present, Dongying District has taken precise measures to seize the favorable opportunity of the petroleum equipment market, while accurately blocking the import of the epidemic, while ensuring the orderly production of enterprises, the orders of the petroleum equipment industry have increased significantly, and the petroleum equipment industry has maintained steady growth.

Correspondent Miao Hongwei

The picture says that | power! Project construction

  At the site of the municipal key project Dongying District Domestic Waste Classification Operation Center, workers are carrying out column reinforcement lashing and beam formwork installation in the main body of the comprehensive building and the main body of the No. 1 sorting center. It is reported that after the completion of the project, it will become the largest and most functional comprehensive garbage classification comprehensive operation center in the city.

Correspondent Miao Hongwei

The picture says that | power! Project construction

  The epidemic prevention and control is not relaxed, and the project construction does not stop. At the construction site of these projects, excavators shoveled soil with their arms, transport vehicles shuttled back and forth, tower cranes raised their huge arms and rotated back and forth, accompanied by the roar of machines, and workers stepped up construction... A thriving scene.

Source: Aidongying

Edited by: Geng Geng