laitimes

Li Bo went to Yushen Coal and Power Company to inspect and investigate the safe and stable heating situation in winter

author:Sissy News

Recently, Li Bo, member of the Standing Committee of the Yulin Municipal Party Committee and executive vice mayor, went to Yushen Coal and Power Company to inspect and investigate the safe and stable heat supply situation in winter. Wang Yuming, deputy secretary of the party committee and general manager of Yushen Coal and Power Company, and Hu Yanbin, deputy general manager of Yushen Coal and Power Company, accompanied the inspection.

Li Bo went to Yushen Coal and Power Company to inspect and investigate the safe and stable heating situation in winter

At the production site, Xiang Ming, deputy secretary of the party committee and general manager of the company, reported to Li Bo and his party on the company's current safety production and heat supply situation, and introduced in detail the economic and technical and environmental protection indicators of production and operation. Li Bo pointed out that Yushen Thermal Power Company is a major people's livelihood project in Yulin City, which has made a significant contribution to the winter heating of the majority of citizens in Yulin City, and the current system and equipment are running stably, so that the government and citizens can rest assured. On behalf of the Municipal Party Committee and the Municipal Government, he expressed his gratitude to all the employees of Yushen Thermal Power Company. At the same time, it is required to resolutely implement the important arrangements made by the Party Central Committee and provinces and municipalities, carry out various work in strict accordance with the requirements of epidemic prevention and control, and ensure that the epidemic prevention and control work and safe and stable production and operation are not mistaken.

From 2019 to 2020, Yushen Thermal Power Company's #1 and #2 units were the first thermal power plant in Shaanxi Province to be successfully transformed through zero power transformation of heating and low-pressure cylinders. After the transformation, the peak regulation capacity and heating capacity of the unit have been greatly improved, and it has the ability to deeply peak shave to less than 30% of the rated electrical load during the heating period.

Li Bo went to Yushen Coal and Power Company to inspect and investigate the safe and stable heating situation in winter

At present, the company is in the first station of heating capacity improvement and transformation project, after the completion of the transformation, the maximum heating capacity of the unit can reach 18 million square meters, which will greatly alleviate the long-term contradiction of central heating demand in Yulin Urban Area, improve the ecology and living environment of Yulin Urban Area, and make more positive contributions to the urban development and environmental protection of Yulin City.

Xiang Xiangming said that Yushen Thermal Power Company is the first new cogeneration project that Yuneng Group has put into production, and has always been adhering to the goal of green environmental protection, safety and efficiency, serving the general public, please rest assured by the government and the masses. (YT02)

Read on