Let's take a look at what preparations need to be made before using a building mold shell?

author:Qianfang east flowing water

Building mold shell is a commonly used material in the construction industry, in order to give full play to the role of building mold shell, in the placement and disassembly of building mold shell also need to pay attention to a few matters, let's take a look at it separately.

Let's take a look at what preparations need to be made before using a building mold shell?

Black construction plastic mold shell

In the process of placing the building mold shell, the building mold shell should be hoisted to the formwork, evenly dispersed and stacked to avoid excessive local load, and two workers should be lifted and placed at the same time during the placement process, and the grid should be accurately placed according to the bullet. After being in place, it should be checked at any time whether the bottom of the plastic mold shell and the top surface of the formwork are closely joined, and large gaps should be avoided, and after the building mold shell is placed, the gap between the mold shell is filled with fillers such as bamboo rubber boards, wooden strips, and extruded slats. Small nails can be used to fix the filler to the formwork to prevent the filler from warping, a more important measure to prevent the horizontal displacement of the plastic mold shell under the pressure of the concrete side.

Let's take a look at what preparations need to be made before using a building mold shell?

1. Before using the building mold shell, we need to prepare the materials and auxiliary tools according to the construction process.

2. When we stack the building mold shell, we need to stack it into stacks, and we need to hold it lightly during use to avoid damage to the building mold shell.

3. When the mold shell is laid in columns, it is laid from the center of the axis to both sides, so as not to show signs of unequal ribs on both sides.

Let's take a look at what preparations need to be made before using a building mold shell?

4. Because the size of the repair molding shell processing is only allowed to have a negative difference, there will be definite flaws after the building mold shell is laid, so it is necessary to use cloth tape to paste the cracks and seal them tightly to avoid leakage.

5. In order to prevent the mortar from flowing into the pores when pouring concrete, before applying the mold release agent, first wipe the air holes around the air holes, and check whether the air holes can circulate, and then use no less than 50mm 50mm cloth tape to block the air holes, this thing should be copied as a pre-inspection project. When pouring concrete, there should also be a special guard.

6. After the building mold shell is installed, it is necessary to conduct a comprehensive quality inspection of the building mold shell and manage the pre-inspection procedures, and the mold shell support system is settled and strong, which allows disadvantages.