laitimes

The construction of a number of key projects in Chizhou Pingtian Lake Scenic Area has been accelerated

Xin'an Evening News Anhui Network Dawan News On the afternoon of December 13, at the construction site of the first phase of Xiangyun Road Primary School located at the intersection of Liushou Road and Xujiadun Road in The Paradise Lake New Area of Chizhou City, the construction personnel were carrying out the final construction of the main project. "At present, the main structure of the four buildings has been nearly completed and will be capped, and the auxiliary site is under simultaneous construction, and all will be completed and delivered to use in July next year." Ruan Jianhua, a staff member of the Construction Management Office of the Pingtian Lake Scenic Area Management Committee who was present, told reporters that since the construction in August 2021, the construction personnel are going all out to speed up the construction.

The construction of a number of key projects in Chizhou Pingtian Lake Scenic Area has been accelerated

According to reports, the total construction area of the Xiangyun Road Primary School Project (Phase I) in Chizhou City is 12,231 square meters, and the main construction content is 2 teaching buildings, 1 science and education building and 1 multi-functional hall; at the same time, supporting the construction of student activity venues. "In order to allow the children of the residents of the surrounding communities to go to school nearby as soon as possible, since the start of the project, we have been in accordance with the requirements of the Pingtian Lake Management Committee, on the basis of ensuring the quality of construction, and go all out to grasp the progress to ensure that The Xiangyun Road Primary School can be delivered and put into use on time." The person in charge of engineering construction at the site was introduced.

School construction can not be slow, and the construction of resettlement housing communities that are related to people's livelihood must also be fast! At the construction site of the Ninghu Yayuan Resettlement Community in the Paradise Lake New Area, not far from Xiangyun Road Primary School, it is also a busy scene, and the construction personnel and excavators are carrying out foundation pit support and basement foundation earthwork. "We started construction at the beginning of this month, and have now completed site clearance, temporary construction and excavation of basement earth, and strive to achieve basement capping before the Spring Festival." Liu Zhijun, the person in charge of the construction of the Ninghu Yayuan resettlement housing project at the scene, introduced it.

The construction of a number of key projects in Chizhou Pingtian Lake Scenic Area has been accelerated

Since the beginning of this year, the Chizhou Pingtian Lake Scenic Area has grasped and accelerated the pace of key project construction in the spirit of being highly responsible to the people and with the mentality of "only seizing the day and working hard". At present, six roads and corresponding supporting facilities such as Xujiadun Road and Xuejiadun Road in Paradise Lake New Area have been built and networked. Involving 985 households and a total investment of 16 million yuan, the Huishang City hydropower sub-household transformation project has been completed and accepted; the transformation project of the old residential area in Baisha area has been basically completed and the pre-acceptance has been completed; the Qingtong Road extension project is also about to start...

"Thinking of what the masses think and anxious about what the masses are anxious about, we always regard accelerating the integration of Jingcheng and constantly improving the city's public service facilities as an important foothold of our work." At present, the infrastructure layout of 'Ten Roads, Two Schools, One City and One Park' in Paradise Lake New Area has basically taken shape. The beautiful Paradise Lake New Area has become more livable and complete. According to the relevant staff of the Pingtian Lake Scenic Area Management Committee, in addition, the park has also accelerated the construction progress of the relevant supporting facilities of the commercial and trade logistics park in the area, "At present, the construction of Qinglian West Road has been completed and has the conditions for opening to traffic." ”

The construction of a number of key projects in Chizhou Pingtian Lake Scenic Area has been accelerated

According to reports, Qinglian West Road starts from chicheng Qishan Avenue high-speed roundabout in the east to the planned Shengjinhu Road in the west, with a total length of 2.24 kilometers and a road width of 40 meters. "Since Qinglian West Road is directly connected to the highway crossing, after the road is opened to traffic, some large logistics vehicles can directly enter the professional market after getting off the highway, which greatly improves the basic supporting facilities and services of the modern commercial and trade logistics park project in the scenic area, and also provides convenience for nearby residents to travel." Pingtian Lake Scenic Area Management Committee Construction Management Office staff introduction.

Pingtian Lake is a pearl in the main urban area of Chizhou, and the safety of the infrastructure around the lake has always been the focus of park managers. Recently, the Pingtian Lake Scenic Area Management Committee began to demolish and rebuild the Lotus Terrace Wooden Boardwalk platform. "The floor on the wooden boardwalk has a long history, and it is close to the water surface due to perennial rain and sun, and many places are decayed and damaged or even collapsed, there are potential safety hazards, for the safety of citizens and tourists, we decided to demolish and rebuild." According to the relevant staff, the project is expected to be completed by the end of December, when the wooden boardwalk will be stronger and more beautiful.

The construction of a number of key projects in Chizhou Pingtian Lake Scenic Area has been accelerated

"We will conscientiously implement the construction and deployment of the modern 'Three Excellent Ponds' and 'Five New Noble Ponds', and compare the latest requirements such as building a high-quality life service supply base for the eastern industrial new city, an important production comprehensive service base in the city, and a special business travel and health care (exhibition) base in the Yangtze River Delta "Shanshui Wetland City", strengthen confidence, raise the benchmark, accelerate the improvement of the supporting facilities of the park, accelerate the integration of industry and city development, and strive to build the Pingtian Lake Scenic Area into a more competitive industrial innovation and development highland." The relevant person in charge said.

Wang Yueyao Xin'an Evening News Anhui Net Dawan News reporter Zhu Chunyou