
Inside Terminal 3 of Guiyang Longdongbao International Airport photographed on December 14.
On December 15, Terminal 3 of Guiyang Longdongbao International Airport, which was built by China Construction Third Bureau, was officially opened. Terminal 3 is designed and constructed to meet the needs of Guiyang Airport's target annual passenger capacity of 30 million passengers in 2025, with a total construction area of 167,460 square meters.
Photo by Xinhua News Agency reporter Ou Dongqu
Passengers rest in Terminal 3 of Guiyang Longdongbao International Airport on December 14.
A view of Terminal 3 of Guiyang Longdongbao International Airport taken on December 14.
Passengers walk in Terminal 3 of Guiyang Longdongbao International Airport on December 14.
Author: Ou Dongqu
Source: Xinhua Net