First, the machine room floor

Type: Epoxy floor paint

Color: Bright, light gray

Function: anti-slip, oil-resistant, compressive, dust-proof, permanent.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Second, the machine room trunking

Requirements: Relevant safety markings can be applied to the cable ducts by purchasing ready-made tape signal signs or on-site brushes.

Note: If you choose to paint on site, it is recommended to use yellow as the base color, and then measure the spacing to paint the slash with black paint, do not use black to base, which will cause yellow to cover the black paint.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Third, the computer room safety logo

Requirements: All blocks that are dangerous and necessary to make people pay attention to safety must be labeled with safety warning labels to achieve the purpose of preventing danger.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )
Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )
Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Fourth, maintenance information board

The maintenance information board is made according to the company's unified template, the material is PVC, and the plug box cover is plexiglass.

Kanban board needs to be posted in a conspicuous position at the entrance of the machine room, it is recommended to set on the blank wall on the left hand side of the door of the machine room, and the left side is the information of the 2 maintenance personnel responsible for the elevator, including name, employee number, contact information, 24-hour maintenance hotline and slogan: professional service, dedicated service; the right is the annual maintenance work schedule, A3 paper size, recording each employee maintenance situation.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

5. Disc wheels and loose brake devices

The disc wheel and loose brake device are required to be placed on the right side of the main machine, and the upper end of the font is basically within the same horizontal line or 2CM as the top of the main engine;

The words on the disc wheel and the loose brake device are required to be centered, and need to be sprayed with paint, no handwriting or marker pens are allowed to write, the font color is required to be red, and the font size is bold 32.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

6. Work area

The working area needs to be clearly set in front of the control cabinet, and the working area needs to be pasted with yellow tape or painted.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

7. Hooks

The hook needs to be painted yellow with paint.

The font needs to be sprayed with paint, handwriting is prohibited, the font color is red, and the font size is bold body size 36.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

8. Fire extinguishers

Two 4KG dry powder fire extinguishers need to be placed in the machine room, placed in the most easily obtained place, and checked and registered every month.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Nine, anti-collision angle and wire rope hole

The anti-collision angle should be painted with yellow marks to prevent bumping into people;

Wire rope holes should be painted yellow to warn against debris falling into the shaft.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )
Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )
Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

10. Identification of the flat area

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

11. Enter the stairs of the computer room

The floor color of the stairs is all painted black, and the sides of the pedals are painted yellow as a reminder to prevent tripping.

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

XII. Description of color system

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Elevator machine room specifications

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

1, the elevator machine room environment should be cleaned up, the door and window of the machine room should be weatherproof, and marked with the words "the machine room is heavy, idle people are exempt from entering", the passage to the machine room should be smooth and safe, and there should be no other equipment unrelated to the elevator in the machine room;

2. The power supply board and power switch of the computer room should meet the requirements of the specification, the installation position is reasonable, firm, the mark is perfect, and the machine room trunking should be reasonable and standardized;

3. The power line is isolated from the control line, and a pad is added to the corner;

4, the machine room ventilation is good, the ambient temperature of the machine room should be maintained between 5 ~ 40 degrees, the machine room should be equipped with fixed test electrical lighting, the illumination on the floor surface is not less than 200LX;

5. There should be an emergency rescue device and its instruction manual in the computer room;

6. The holes in the elevator shaft and the machine room, the flat layer marking of the lead rope, the marking of the elevator running direction, etc. shall meet the requirements of the specification;

7. The machine room control cabinet is installed correctly, the control cabinet is installed correctly, and the traces in the control cabinet are reasonable and beautiful.

8. There should be necessary fire fighting equipment in the machine room.

General requirements for elevator machine rooms

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

1, each elevator should be provided with a single cut off the elevator's main power switch, the switch position should be able to be conveniently and quickly approached from the entrance of the machine room, such as several elevators sharing the same machine room, the main power switch of each elevator should be easy to identify. Its capacity should be able to cut off the maximum current under normal use of the elevator, but the switch should not cut off the following power supply circuits:

a. Car lighting and ventilation;

b. Lighting between the machine room and pulleys;

c. Power socket in the machine room;

d. Power outlets for the roof and pits of the car;

e. Elevator shaft lighting;

f. Alarm device.

2. Each elevator should be equipped with a power supply system phase-breaking and dissociation protection device, and the device should also play a protective role in the phase of elevator operation interruption.

3, elevator power and control line should be separated and laid, from the machine room power supply from the zero line and grounding line should always be separated, the color of the grounding wire is yellow and green two-color insulated wire, in addition to the safety voltage below 36V electrical equipment metal shell should be provided with easy to identify the grounding end, and should have a good grounding. The grounding wires should be directly connected to the grounding poles respectively, and must not be connected to each other and then grounded.

4. The laying of conduit and trunking should be straight, neat and firm. The total area of wire in the trunking is not more than 60% of the net area of the groove; the total area of the wire in the conduit is not more than 40% of the net area in the tube; the fixed spacing of the hose is not more than 1m, and the fixed spacing of the end is not more than 0.1m.

5. The installation position of the control cabinet and screen should conform to:

a. The control cabinet, screen front distance door, window is not less than 600mm;

b. The maintenance side wall of the control cabinet and screen is not less than 600mm;

c. The control cabinet and screen pitch mechanical equipment are not less than 500mm.

6. The gap between each side of the wire rope and the floor slab hole in the machine room should be 20 to 40mm, and a step of more than 50mm should be built around the hole leading to the shaft.

7. If the load-bearing beam of the traction machine needs to be buried in the load-bearing wall, the support length should exceed the center of the wall thickness by 20mm, and it should not be less than 75mm.

8. There should be a sign corresponding to the direction of the car lifting and lowering on the motor or flywheel. The outside of the traction wheel, flywheel, and limiter wheel should be painted yellow. The brake manual loose wrench is painted red and hangs on an accessible wall.

9. The traction machine should have an appropriate amount of lubricating oil. The oil gauge should be complete, the oil level display should be clear, and the active lubrication parts of the speed limiter should also have reliable lubrication.

10, the brake action is flexible, when braking, the brake pads on both sides should be tightly and evenly attached to the working surface of the brake wheel, and the brakes should be synchronized when the brakes are loosened, and the average of the gaps at the four corners is not greater than 0.7mm on both sides.

11. The deviation of the speed limiter rope wheel and the layer separator steel pulley from the plumb line is not more than 0.5mm, and the deviation of the traction wheel and the guide wheel from the plumb line is not more than 2mm under no load or full load conditions.

12. The speed limiter should run smoothly, the action speed adjustment seal should be intact without disassembly marks at the factory, the speed limiter installation position is correct, the base is firm, and there is no fluttering phenomenon when linked with the safety clamp.

13, power failure or electrical system failure should have a car slow movement measures, such as the use of manual emergency operation device, should be able to use the loose wrench to release the brake, and need to use a sustained force to maintain its release state.

Elevator machine room management procedures

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

1. Purpose

Standardize the management of the elevator machine room to ensure the normal operation of the elevator.

2. Content and process control

1. Non-staff members are not allowed to enter the elevator machine room casually.

2. Keep the elevator machine room clean, and it is strictly forbidden to store flammable items.

3. Elevator maintenance personnel must regularly maintain and clean the elevator machine room, host computer, and control cabinet to prevent dust from causing electrical short circuits and causing fires.

4. During power outage maintenance and cleaning, it is forbidden to scrub with flammable products such as gasoline and alcohol.

5. When the elevator is repaired, it must be operated according to the safety regulations and other procedures. Illegal operations are not permitted.

6. Smoking is strictly prohibited in the elevator machine room, and irrelevant personnel are not allowed to enter. Do a good job of preventing drowning and preventing small animals from entering.

7. The fire in the computer room must be declared and carried out in accordance with the relevant procedures and regulations, and there must be safety measures.

8. The elevator machine room should be equipped with a certain number of hand-held dry powder fire extinguishers, and regular inspection to ensure normal use.

9. Elevator inspectors need to often check whether the temperature of the machine room is too high and whether the exhaust fan is operating normally.

10. After the elevator maintenance personnel complete the operation in the machine room, they must close the doors and windows when leaving the machine room, and check whether the tools are left in the machine room.

More property information / dry property goods

Concern: National Construction Political Research Institute Property Training

Welcome to share/forward/leave a message/like

The comments section is up!

Recent

course

November 26-27, Shenzhen Station | "Benchmark property full-cycle quality management ability improvement special practical course (training + inspection) workshop" registration notice

The latest courses | Notice on the launch of the online "National Senior Property Professional Manager Senior Training Class"

Favorite | Property elevator machine room standardization construction scheme (illustration, specification, requirements... )

Disclaimer: The above pictures and texts are organized from the network, the copyright belongs to the original author, the content itself does not represent the author's point of view, does not represent the public account view, does not constitute investment advice, and the copyright belongs to the original author. If you have any questions about the content of your work, copyright or otherwise, please contact us in a timely manner so that we can promptly publicize, delete or properly deal with it.