laitimes

Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights

author:Chuanhui Housing Construction

In order to do a good job in flood prevention and flood transit in the central urban area, the District Housing and Construction Bureau was ordered to immediately set up a "flood prevention and rescue commando team" and rushed to the East Wind Tipai Station of the Jialu River and the Jialu River Dangerous Works Office to carry out flood prevention and rescue work to ensure the safety of the people's lives and property.

On July 21, the peak of the flood is approaching, the Jialu River has exceeded the guaranteed water level, the Shaying River has exceeded the warning line, and the flood control work is facing a severe test. Flood situation is the order, emergency rescue is the responsibility!

The District Housing and Urban-Rural Development Bureau set up a "flood prevention and rescue commando team" for the project under construction, and the engineers took on the responsibility of fighting floods and rescue at the front-line dangerous work and danger office, organized and dispatched the flood prevention and rescue team of more than 200 people from the Zhoukou Wanji Construction Unit, the supporting road construction unit of the Jialu Jinhai Jiayuan Resettlement Area, the unit of The Lotus New City Henan Fuchun Construction Group Company, and the construction unit of the B plot of The Fourth Construction Jinhai Jiayuan of Henan Sijian, and quickly rushed to the flood prevention site. The rescue team members were divided into two groups, one group laid tarpaulins, loaded sand and stones at the mouth of the river, and a group of personnel carried sand and gravel bags neatly into the embankment, and stepped up the flood prevention and emergency reinforcement of the dangerous sections of the dangerous work, and the work was done all night.

There is a kind of responsibility called perseverance, there is a belief called responsibility, and there is a choice called no regrets.

Since July 21, more than 200 people have been guarding a number of dangerous places day and night for three days and three nights, with a total of more than 600 person-times.

Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights
Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights
Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights
Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights
Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights
Flood prevention frontline Chuanhui people: Residents guard the front-line positions of flood prevention and flood control peaks for three days and three nights

In this flood prevention and rescue work, the project under construction is based on the flood situation, actively fighting in the front line of flood prevention and disaster relief, interpreting the responsibility and fulfilling the original mission.