I am engaged in decoration engineering, engaged in this industry for more than ten years, in these years, I found a particularly strange event, I have encountered a total of two times, in our decoration industry also have a special view of this matter.

Six years ago, I renovated a house for one of our power bureau staff, and we called this person a jun bar. That house area is about 140 square meters, the contractor wrapped material decoration, a Jun is a meticulous person, you buy a nail he has to see if there is a rust point on the top, buy a board corner on a little damage are required to replace, although I am the contractor responsible for material procurement and construction, but every morning I arrange the materials and construction plan on the long go, but a every morning at 8 o'clock on time with our workers to work, 6 o'clock and work together, a day at the construction site as a supervisor. Fill the connoisseurs, point fingers at the workers, this is not right, that is not good, the workers are almost bored to death.

That house has a total of 1 kitchen and 2 bathrooms need to do waterproof work, when the waterproof worker made a bathroom waterproof, a called me to say that the waterproof worker is not good in technology, asked for replacement, the worker and I have cooperated for more than three years, the project has never had a problem. But a did not listen to my explanation at all, and finally there was no way to kick the other 2 waterproof out of the project package, and a found someone to complete it by himself.

Later, in the first installation of the floor or the first installation of the lamp on the top of the we have a difference, because the lamp is his own procurement from Guangdong for too long, the floor is I have been ordered locally in advance, the ground first arrived, he asked to lay the floor first and then install the lamp, I told him that he should first install the lamp and then install the ground to avoid the floor in case there is maintenance water to install the lamp, hit the eye water flow and damage the wrench, but he did not listen, stubborn, but he promised to bear the consequences and did it according to his requirements.

After the lights were installed, there was no protection for the water to flow down, and a muttered that I taunted me, and I had to tell him just in case.

As a result, the next afternoon, I called to say that the large bedroom maintenance water flowed under the floor wardrobe door cover were flooded, I took care of you, at that time to explain that you did not listen anyway to the loss of responsibility you bear.

More than half a year after handing over the house, one day I called me again to say that there was a bathroom leaking water to the downstairs residents, scaring me to jump and run to see, lean, close my bird affairs, the waterproofing of the water leakage is done by myself.

A few years ago I did another renovation of a duplex, and this owner was in charge of the hostess C, which was more than a, and all day long I was suspicious of the quality of the construction, suspecting that I colluded with the material supplier to cheat her of money. Extremely dark psychologically.

When booking the interior door, I was asked by c to introduce a supplier who has been working with me for a long time to her, c skipped that I negotiated with the supplier about the product price and style décor, signed the contract, and found a contrasting door color for the cabinet to book the wardrobe and cabinet.

When the door was installed a few days ago, C was not there, and I went to receive the goods according to the contract and installed it. C came back and saw that there was no problem, so I paid the money.

After two days when the cabinet came to install, I found that the color difference between the cabinet and the door was too large, I told c, C also felt wrong after looking at it, took out two contracts to compare and found that the door was looking at 2 colors, choosing 1, but c provided to the wardrobe factory is 2 color samples, blame who, only blame themselves.

After negotiating with the door factory in the past two days, all the door covers and doors can only be removed and returned to the factory to be repaid with paint, and the cost and construction period delay have to be borne by themselves.

Last night, a few of our peers talked about this matter at dinner, and everyone said that they had encountered this kind of thing, and they all felt that the more long their teeth (the local saying, referring to the more they were calculating and suspicious of ghosts and gods and not believing in people), the more likely it was to have problems. And the owners who trust you don't have that kind of thing. Just like another suite I installed some time ago, the owner has come twice, the first time to send the keys, the second time to accept, smooth, the owner is also very satisfied.

Friends, have you ever encountered something similar in your life and work?