The heart is tied to one place, nothing is accomplished, and the meticulous carving is the ingenuity. In September, Guruiwat photovoltaic inspection into wanjia activities launched. In October, Gurui watt "photovoltaic inspection into 10,000 homes" is in full swing, service pioneers and photovoltaic inspection promote each other, becoming a beautiful scenery of "photovoltaic inspection into 10,000 homes" South China Station.

The pace is non-stop, the struggle is endless. At present, Gurui watt photovoltaic inspection into Wanjia in South China has gone through more than 20 days of service trip. It has inspected 8 provinces in South China, more than 80 cities and counties, and more than 200 distributed power stations. As an economy with a domestic GDP of more than 10 trillion yuan, there are many photovoltaic projects in South China, but they are scattered, and the demand for service operation and maintenance inspection is huge. Every day, countless inverter equipment operates efficiently in various power station projects, playing an important role.
Sunlight makes barren land blossom into dreams
For a long time, Gurui watt has been deeply cultivating south China, doing a large number of benchmark demonstration power stations, and achieving a very good market reputation and mass foundation. The South China Inspection Detachment took the lead in coming to Guangdong, and Zhoutian Town belongs to Huilai County, Jieyang City, Guangdong Province, located outside Kwaiyang Pass in the east of Huilai County. Wuning Primary School and Xinxiang Primary School are located in Zhoutian Town, and 80KW and 212KW photovoltaic power plants are built respectively. The economic income of Wuning Village and New Village is mainly based on agriculture, and it is a pure agricultural village. Wuning Primary School power station is surrounded by weeds, blocking the fan, service engineer Wang Mingfu arrived, began to clean up the weeds, and the inverter, MC4 terminal connection, AC and DC distribution box and other items one by one inspection. And patiently explain to users various common problems in the use of the process and precautions in the use of the process, won the praise of users. After issuing the test report, Wang Gong rushed to Xinxiang Primary School without stopping.
"In order to overhaul the product, we will go up to the roof, carry the tools up the stairs, carefully maintain every detail of the product, and cherish the smile and affirmation from the customer." This is the 25th roof I have climbed this month, although the waist is slightly sore and the hands are slightly numb, I want every user to have an efficient and reliable power station. Wang Gong said with a smile that because there was no ladder, Wang Gong climbed the roof of the Xinxiang Primary School power station with his bare hands.
These seemingly simple photovoltaic power plants are actually a popular science topic for students who popularize solar energy knowledge and promote solar photovoltaic systems. The Italian natural scientist Bruno once said that science is the best way to make the spirit brave. The two campus photovoltaic power stations can not only provide clean energy power for teachers and students on campus, but also organically combine photovoltaic power generation with the school publicity and education platform, use the installed solar photovoltaic power generation equipment to carry out unique education and teaching activities, and plant new energy, green, energy-saving and environmental protection seeds in the hearts of students.
Efficient + service to help industrial and commercial power stations to blossom
As a large province for the development of small and medium-sized industrial and commercial enterprises, Fujian, industrial and commercial distribution also occupies a pivotal position in the development of distributed photovoltaics in Fujian. Mr. Zhang of Putian Yibo New Energy Co., Ltd., who has been in contact with the photovoltaic industry for several years, has extremely high requirements for power station equipment. "If a worker desires to do good, he must first use it."
"Efficiency, reliability and safety are the most basic and must be considered first; secondly, whether the inverter can really save operation and maintenance costs; in addition, after-sales service and training, etc., also need to be considered." Especially with a power station life of up to 25 years, we are more cautious about the details of the inverter. On the basis of field research and market research, and after repeated comparisons, we finally chose Guriwat. Of course, their good reputation among their peers is also one of the reasons why we chose. In particular, there are now free value-added activities such as photovoltaic inspection into wanjia, which can further detect and supervise the quality of the power station, so that the power generation income of the power station can be guaranteed. He said.
After-sales worry-free, truly make the service "home"
Sichuan Dazhu → Chongqing → Bishan → Chongqing Fengdu → Chongqing → Mianyang → Yingshan → Chengdu → Capital Zhongbei → Zigong → Rong County → Leshan → Meishan → Renshou → Meishan → Kunming → Sichuan Panzhihua → Kunming → Yunnan Wenshan → Guangxi Baise Napo County → Liuzhou (Kangzhai County) → Chongzuo → Yulin (Beiliu) → Liuzhou → Hainan, this is the service engineer Qiu Gong's October inspection road map, the weather is changeable, but he is full of enthusiasm, day and night, wholeheartedly into the service inspection work, one by one to understand the operation of the power station equipment, Check every detail, explain to the user again the maintenance and operation of the equipment and the matters that should be paid attention to in the process of use, and solve the relevant problems raised by the user in a timely manner, listen to the opinions and suggestions of the user, so that the user can feel the enthusiasm of Gurui watt sunshine service.
This is a Guriwat inverter that left the factory in 2015, but there is no trace of age. "The two Guruiwat inverters in the power station have been used for 5 or 6 years, and there has never been a problem." The user sighed. In the process of inspection, we have seen countless cases like this.
We see that every smile of the user confirms the dedication and persistence of Guruihuate's service; the front-line soldiers in the market who are running on the road and the labor models who stick to the production line all convey Guruihuat's dedication to professionalism and the pursuit of quality.
Adhere to the responsibility to the user
Inspection registration is open again
In the process of continuous inspection service, more and more users want to sign up to join it, in line with the attitude of being responsible for the industry and being responsible for customers, the "photovoltaic inspection into ten thousand homes" activity registration lasts until October 31, Gurui watt will continue to invest huge manpower and material resources to provide customers with completely free inspection and maintenance value-added services, with faster, more professional, more extensive service, to assume the heavy responsibility on the shoulders, so that the interests of customers can be effectively guaranteed, and promote the continuous upgrading of service standards in the distributed photovoltaic industry.