Shenzhen News Network, October 12 (reporter Zhou Weiyuan correspondent Li Ruoshi Chen Weiye Du Yongjing) In the face of the typhoon "compass" attack, the Dapeng office responded efficiently, strictly implemented the system of leaders leading shifts and 24-hour duty, and all the cadres of the organs were divided into multiple roads and continued to conduct comprehensive investigations. Foresight is not cute, in order to avoid danger and invisible. In order to make good preparations for the defense of Typhoon No. 18 "Compass", the Dapeng Office made every effort to do all the work of defense and emergency response, and after repeated inspections and work, a total of 45 homestays in the first two rows of the front two rows of the sea at the end of the field were emptied, and all the personnel were evacuated. The main scenic spots Kaisa International Paradise and Guanyin Mountain have been closed. All 107 ships returned to port to shelter from the wind, and all employees landed. All 19 beaches in the jurisdiction were cleared and closed. The construction work of 93 small scattered projects under construction in the jurisdiction has been completely stopped, and 131 dangerous houses have been inspected, of which the C3 class dangerous houses have always remained vacant. 142 slope inspections were carried out, and no new geological hazards were found; a total of 1583 people were transferred from 14 construction sites and sheds, such as the Xiasha Seashore, the Manjinghua Construction Site, the Dapeng 0813 Plot Talent Settlement Project, and the Eastern Seawall. Complete flood control work for water-prone points and water-generating points within the jurisdiction. Arrange special personnel to be on duty in the first industrial zone of Kuinan Road, place the extraction equipment for emergency use on the spot, and use the water barrier for water drainage. Disposed of 16 lodging trees and 43 broken branches. In order to prevent the rebound of the results of rectification, under the condition of ensuring the safety of the staff themselves, at about 20:00 that night, the Dapeng Office once again sounded the "rallying call" and carried out "looking back" inspections of key parts, and resolutely achieved real reform and real reform. The office actively contacted the traffic police department and the Dapeng police station to set up an emergency team to implement synchronous linkage of police intelligence and improve emergency rescue capabilities. It is reported that as of now, all 10 typhoon shelters under the jurisdiction of the Dapeng Office have been opened, providing help for the masses for 24 hours, and a total of 1,031 hedgers have been placed.