Han Wei successively went to the urban renewal project of Wanglu Beixin Area, the Dingtailu Xinxu Urban Renewal Project, and the "Four Pavilions" project site to inspect the construction situation. At the site of the Wang Lu Beixin and Ding Taro Xinxu projects, Han Wei listened to the work reports of the relevant responsible comrades and learned in detail about the relevant work conditions such as land requisition and relocation, demolition of above-ground objects, and cleaning and transportation of slag. It is necessary to focus on the difficult problems and difficulties of the work, dredge the blockages in the work, and ensure the orderly progress of the project construction.
At the site of the "Four Pavilions" project, Han Wei learned in detail about the construction of important functional areas in the auditorium, library and other libraries. He stressed that it is necessary to coordinate the actual functional needs such as conference support and literary and artistic performances, further improve the construction design of the venue, highlight the functionality and adaptability of the venue, scientifically adjust the stage layout and seating, and effectively achieve perfect functional facilities, efficient and practical design, and excellent construction quality.
Cheng Song, member of the Standing Committee of the District Committee and director of the office, and the main responsible comrades of relevant departments and streets attended the activity.