laitimes

Zhangzhou Longwen: Arrange the project in the fastest time limit to promote the project

On the morning of October 14, Zhu Zhen, secretary of the Longwen District CPC Committee, investigated the work of education projects and stressed the need to thoroughly implement the spirit of the 12th Municipal Party Congress, adhere to the people-centered development thinking, run fair and high-quality education well, persist in planning first, move quickly, and move quickly, and move quickly, arrange the progress of projects with the fastest time limit, ensure the speed and quality of education project construction, and persistently build a strong education district. Zhou Shaobin, deputy secretary of the Longwen District CPC Committee, and Chen Qi, deputy mayor of the district, participated in the investigation.

Zhangzhou Longwen: Arrange the project in the fastest time limit to promote the project

Zhu Zhen and his party went to the construction sites of the Longwen Campus of Zhangzhou Experimental Primary School, the Second Central Kindergarten of Guokeng, the Longxi School, and the Tongyuan School under construction to understand the progress of the project construction and hold a special promotion meeting to coordinate and solve the difficulties and problems in the promotion of the project.

Zhangzhou Longwen: Arrange the project in the fastest time limit to promote the project

Zhu Zhen pointed out that education is the core competitiveness of Longwen's sustainable development. The Zhangzhou Municipal Party Congress proposed to "run a fair and high-quality education", as the core area of Zhangzhou City's "one nuclear and two wings", Longwen has the foundation, conditions, and responsibility to run the education that the people are satisfied with. We must seize the opportunity, keep a close eye on the new expectations of the masses for high-quality education, persist in doing our best and doing what we can, and strive to be the first and first-class in expanding the supply of high-quality education resources. It is necessary to go all out to build a high-quality education supply system with universal and inclusive preschool education, high-quality and balanced compulsory education, and diverse characteristics of high school education, accelerate the construction of strong education areas, and strive to ensure that "learning has excellent education" so that the masses can enjoy fair and high-quality education at their doorstep.

Zhu Zhen stressed that it is necessary to rapidly advance the project. In the preliminary work of promoting the project, all relevant units should effectively strengthen the requirements of "overtime default and default accountability", firmly establish the awareness of "today is late is also early, tomorrow is early and late", further enhance the sense of urgency and responsibility of implementation, and make every effort to ensure that each work is completed with high quality in the shortest possible time; it is necessary to finely promote the project. Adhere to the "one hand to grasp the quality of education, the other hand to grasp the project construction", education, development and reform, finance and natural resources and other departments and relevant owner units should work together, closely cooperate, pay close attention to the refinement of the formulation of 14 education project promotion plans, list timetables, road maps, wall chart operations, table advancement, accurate and meticulous work; to close the loop to promote the project. Longwen District leaders should strengthen coordination, education departments and relevant owner units, cooperation units should strengthen coordination, close the loop with each other, meet and consult in a timely manner, timely feedback on the situation, report problems, and study countermeasures to ensure that each education project is time-effective, the construction is effective, and it will benefit the people as soon as possible.