
The whole line runs through
New Gansu client Zhangye, September 7 (New Gansu Daily Gansu Network reporter Yang Hongli) this morning, with the G312 line Zhanglin (Zhangye - Linze) first-class highway pavement project civil construction of a standard K9 + 800 section of military optical cable impact section of the completion of the paving, marking the zhangye city "Ganlin integration" core economic zone important channel fully opened.
It is understood that the G312 line Zhanglin first-class highway construction project was invested and constructed by Zhangye Transportation Construction Investment Co., Ltd., which lasted for two years. The G312 Zhanglin First-class Highway starts at Lijiawan Village, Shangqin Town, Ganzhou District, and passes through Liangjiadun, Chang'an, Xindun Town, Heihe Bridge, Binhe New Area, Planning New Town, Shajing Town, Linze County Park Road, Linze South High-speed Railway Station, and ends at the existing G312 Line. The project is built according to the technical standards of the first-class highway, using two-way four lanes, the design speed is 80 km / h, the total length of the route is 59.742 km, and there is 1 toll station, 1 service area and 1 maintenance area on the whole line, with a total investment of 1.801 billion yuan.
The project is an important part of G312, undertaking the auxiliary road and distribution functions of the Lianhuo Expressway, as an important vertical passage in the golden section of the Silk Road Economic Belt gansu, the completion of the project has realized the spatial layout of "one heart, two belts and four districts" in Zhangye City, further improved the traffic road network structure of Zhangye City, and will greatly play the important role of the core economic zone of "Ganlin Integration", and comprehensively promote the tourism and social and economic development of local tourism and surrounding areas along the route.