After the new house is in hand, most owners are beginning to consider the problem of decoration. Before the decoration, it is necessary to understand the relevant knowledge and specific process of the decoration, so as to avoid being deceived by the bad team during the decoration process. The following fang sister will bring you a 12-point perfect strategy for home decoration, 30 years of experience teacher Fu exclusive secret, small partners hurry up to learn it!

01
The construction team and decoration materials entered the site
The renovation company and the owner need to go through the formalities, and then the renovation team can officially enter. Decoration auxiliary materials and some main materials also need to be entered at the same time. After admission, the owner, foreman and supervisor need to accept the materials at the same time.
02
Demolition and renovation works
The purpose of house demolition and modification is to transform the structure of the house, but when demolishing and changing, we must pay attention to not destroying the overall structure of the house, let alone demolishing the wall or other structures at will.
03
Hydropower retrofits
After the demolition and reconstruction project is completed, the next step is to carry out hydropower transformation work. The plumber formulates the direction of the water and circuit according to the needs of the owner, and opens a good channel at the corresponding position of the wall or the ground, buries the water pipe and the thread pipe, wears the wire, and finally flattens the channel with gypsum or cement mortar.
04
Waterproofing works and closed water tests
After the construction of the hydropower project is completed and the pressure test of the water pipe is completely normal, the construction of the waterproof project can begin. The area that needs to be waterproof will be cleaned up, the waterproof paint will be painted, and when the waterproof layer is completely dry, it is necessary to conduct at least 24 hours of closed water test, and check and accept with the property personnel to ensure that the waterproof layer does not leak.
05
Tile paving
After the waterproofing project is accepted, the work of paving the tiles can begin. Before the tile is paved, the ground should be leveled first, and the floor with floor drains should also be ensured to have a certain tilt angle to prevent water in the ground area.
06
Plate entry and carpentry construction
After the plate enters the site, it needs to be accepted first, and after the acceptance is passed, the carpenter can start construction. Carpenters are mainly responsible for the production of suspended ceilings, door and window covers, molding structures and furniture.
07
Paint construction
After the wall scrapes putty and levels it, apply latex paint. Putty generally needs to be scraped two to three times, and the putty of the latter time must wait for the previous putty to dry before it can be scraped, otherwise the wall surface is very easy to appear empty drums and fall off in the later stage. In addition, furniture made by carpentry also requires lacquering.
08
Ceiling and cabinets, sinks, etc. installation
After the above works are completed, the integrated ceiling is installed, and finally the cabinets, sinks, etc. are installed.
09
Installation of doors and floors
After the cabinet is installed, you can start to install doors, door suction, etc. Once the doors are installed, the floor can be laid and installed. At the same time as the cabinet installation, a variety of kitchen appliances can be installed.
10
Installation of switches, sockets and lamps
The installation of switch sockets should be kept upright, and the sockets in the kitchen, bathroom and balcony should pay attention to the splash-proof box. Whether this link is reasonable or not mainly depends on whether the laying of lines is in place during hydropower transformation.
11
Installation of sanitary ware and hardware
After the sanitary ware arrives at the scene, it is necessary to carry out acceptance first to ensure that there are no cracks, bumps and other phenomena on the surface of the sanitary ware. After the sanitary ware is installed, baskets, towel racks, etc. can also be installed at this time.
12
Furniture and home appliances entered the venue
After the furniture and home appliances enter the field, they also need to be accepted first, and after the acceptance is qualified, they are placed in the designed position, and the new home is also renovated.