laitimes

During the festival, there were fewer vehicles, and the Xinhe Bridge of Hanshi Highway was intensively repaired and maintained

author:Yangtze River Daily

Yangtze River Daily Wuhan client October 7 news (reporter Wang Qian correspondent Lv Pin) from October 5 to 7 "Eleven" holiday, Wuhan Hanshi Highway Xinhe Bridge carried out centralized maintenance and maintenance, repaired 11 diseases, to ensure the quality of the bridge, to facilitate vehicles after the holiday safe and smooth travel.

The Hanshi Highway Xinhe Bridge is one of the important passages in and out of Wuhan's urban area, connecting Chenjiaji and Huangpiwu Lake on the riverbank, a four-lane bridge, built in October 1991 and opened to traffic for 30 years. With the use of many years, there have been a certain degree of diseases on the bridge deck, such as potholes and cracks, and the Wuhan Highway Maintenance Department has been continuously treating the disease.

During the festival, there were fewer vehicles, and the Xinhe Bridge of Hanshi Highway was intensively repaired and maintained

Maintenance workers work on the bridge.

"Our maintenance can not cause traffic congestion, but also can not close the traffic, this bridge usually has a large flow of traffic, especially more trucks, less vehicles in and out of the city after the holidays, some projects have been stopped trucks have also been reduced, this time to use the relatively small traffic flow of the time, focus on maintenance." Wang Jianzhang, the relevant person in charge of the highway center of the Wuhan Municipal Transportation Bureau, said that although the traffic conditions have improved compared with weekdays, the maintenance team is still facing difficulties such as tight time, small working surface, and maintenance while opening traffic.

Wang Jianzhang introduced that the maintenance workers began to repair from the morning of October 5 to more than 6 p.m., which lasted for two full days, today is the last day of the holiday, there are many vehicles entering the city, and the work ends at 3 p.m.

The maintenance team organizes operations in strict accordance with the "Highway Maintenance Safety Operation Regulations" and "Highway Maintenance Technical Specifications", partially closes lane traffic, sets up warning signs and cone barrels in the operation area, arranges special personnel to direct traffic, adopts mechanical and manual methods to chisel the broken cement concrete, uses high-performance materials to fill, greatly shortens the maintenance operation time, and repairs a total of 11 diseases.

【Editor: Zhang Ling】