laitimes

Keyan Street accelerated the construction of key projects

author:Nine factions view the world

"The construction problems of water supply, drainage, and power supply of these infrastructure facilities have been solved." Recently, at the site of the Tiansheng Ecological Breeding Industry Chain Project in Keyan Street, Keqiao District, the project leader was very satisfied with the "three services" special docking meeting held last month, and his confidence in putting into production at the end of the year was even greater.

In order to accelerate the construction and commissioning of the project, Keyan Street held a "three services" docking meeting, and invited the business leaders of 8 units such as the Talent Office of the Keqiao District Committee, the Ecological Environment Branch, and the Water Affairs Group to participate, and face-to-face to consult the pulse of the 5 key projects of the street.

The five key projects are Yiguang Technology, Tiansheng Ecological Breeding Industry Chain, Sitang Fashion Soft Decoration Industry Chain Base, Buchuang "Cloud Cotton" Industrial Base and Textile City Bureau Of Influence Testing, all of which are key projects introduced and settled in Keyan Street in the past two years. These projects have large investments and high technical standards, and the requirements for landing are naturally high. Because these projects are near the intersection of Jingshui South Road and Yangshao Highway, there is a lack of basic supporting facilities such as water supply, drainage, and power supply, and can only be built from scratch. Because of objective reasons such as the construction of the Hangshaotai Expressway and the southern extension of Jingshui Road, and the construction of surrounding villages, the construction plan has been adjusted many times.

"Never drag the project behind, and the infrastructure must be ahead of the project." At the docking meeting, the business leader of the relevant unit made a statement on the spot. In the afternoon of the same day, the person in charge of the street went to the scene with the person in charge of the water supply, drainage, power supply and other units to conduct on-site investigation, discuss solutions, and finally agreed on the synchronous construction of water supply, drainage and power supply, and fully promoted the construction of the project.

【Source: Shaoxing Network-Shaoxing Daily】

Disclaimer: The copyright of this article belongs to the original author, if there is an error in the source or infringement of your legitimate rights and interests, you can contact us through the mailbox, we will deal with it in a timely manner. Email address: [email protected]

Read on