laitimes

Exceeded 100 million people!

Exceeded 100 million people!

According to the latest announcement of "China Railway" WeChat

October 4

The national railways sent 17.547 million passengers

More than 17 million people for 5 consecutive days

Since the start of transportation during the National Day Golden Week on September 29

A total of 105 million passengers have been transported by railways across the country

The transportation is safe, smooth and orderly

October 5

Rail passenger traffic continues to run at a high level

Short- and medium-haul passenger traffic has increased

It is expected to send 17.95 million passengers

It is planned to add 947 passenger trains

Exceeded 100 million people!

Image source: China Railway

Judging from the pre-sale of 12306, from October 6th to 8th, the national railway will usher in the peak of return passenger flow, Beijing to Shanghai, Chengdu to Xi'an, Guangzhou to Nanning, Guangzhou to Shantou, Beijing to Hohhot, Dalian to Shenyang, Beijing to Taiyuan, Guangzhou to Changsha, Beijing to Shenyang, Wuhan to Changsha and other sections of the passenger flow is relatively concentrated. Judging from the remaining tickets, there are still remaining tickets from Shanghai to Nanjing, Suzhou, Hefei, Beijing to Tianjin, Chengde, Guangzhou to Changsha, Nanning, Hengyang and other directions on October 5. From October 6th to 8th, Beijing to Baoding, Shijiazhuang, Chengde, Zhengzhou, Datong, Taiyuan, Shanghai to Suzhou, Nanjing, Hangzhou, Changzhou, Xuzhou, Guangzhou to Nanning, Changsha, Hengyang, Guilin, Hangzhou to Hefei, Wuhan to Xinyang and other directions There are still remaining tickets, passengers can check the specific remaining ticket information through the railway 12306.

As of 9 o'clock today, Railway 12306 has sold a total of 149 million tickets during the Golden Week transportation period.

Exceeded 100 million people!
Exceeded 100 million people!

The railway department issued a reminder to the majority of passengers, the railway 12306 website (including the mobile phone client) is the only official train ticket online ticketing platform of China Railway, and has never authorized any third-party platform to sell train tickets. The railway 12306 platform is committed to providing fair, just, safe and convenient ticketing services for the majority of passengers, without any additional charges such as ticketing acceleration packages, ticketing membership fees, and carriage seat selection fees. Please be sure to purchase tickets through the official channels of the railway, and look for the official website of 12306 and the official App of "Railway 12306"; At the same time, confirm that the payee of the ticket is "China Railway Network Co., Ltd.", so as to avoid not receiving the refund when you need to refund or change the ticket in the future.

During the holiday, the railway passenger flow is large, please pay attention to the weather changes and travel service information in time, reserve enough time to enter the station to take the train, carry your belongings in strict accordance with the regulations, and take the train in an orderly manner according to the number, date, section and seat number marked on the ticket, so as to achieve civilized travel and jointly maintain a good travel environment.

Why don't you open more "night high-speed rail" during the holidays? On October 1, the number of railway passengers sent reached 21.448 million, a record high in a single day. Since the beginning of the holiday, passenger trains have been opened in many places, and "night high-speed rail" has also been opened on hot lines. So some netizens reported that since the passenger flow continues to rise, why not open some more night high-speed rail? The so-called night high-speed rail is a high-speed train that runs from 0:00 to 4:00 in the morning every day. Under normal circumstances, high-speed rail trains need to be overhauled during this period. Just like a car needs regular maintenance, after a day of operation of a high-speed rail train, equipment such as EMUs, lines and catenaries must be overhauled and maintained to ensure safe operation the next day. Before each "night high-speed rail" operation, transportation, dispatching and passenger transport departments should study and formulate a "night high-speed rail" operation plan on the basis of drawing a transportation plan, comprehensively considering the equipment status, weather changes and other conditions.

At the same time as the "night high-speed rail" is running, it is also necessary to ensure the orderly operation of the scheduled trains, so from the current holiday transportation plan in various places, the proportion of "night high-speed rail" is not large.

Source: China Railway CCTV News