In order to ensure the smooth progress of the construction of minor road repairs and maintenance projects on the South Third Ring Road and Qiliang Road in Danyang City and the traffic safety of the surrounding roads, in accordance with Articles 5 and 39 of the Road Traffic Safety Law of the People's Republic of China, it was decided to implement traffic control on some sections of the South Third Ring Road and Qiliang Road. The relevant matters are hereby notified as follows:
1. Control time
From 00:00 on July 22, 2024 --- until 24:00 on September 22, 2024.
Second, the control of the road section
South Third Ring Road (312 National Highway to Qiliang Road), Qiliang Road (Grand Canal Bridge to 312 National Highway).
△South Third Ring Road (312 National Highway to Qiliang Road)
△Qiliang Road (Grand Canal Bridge to National Highway 312)
3. Control measures
1. Half of the motorway is closed for construction and half of the traffic is carried out on the controlled road section.
2. The construction unit shall, in accordance with the provisions of road construction, set up traffic signs and strengthen on-site management.
3. Drivers and pedestrians are requested to consciously abide by the above traffic management measures and obey the command of traffic police and traffic management personnel. Violators will be punished in accordance with the relevant provisions of road traffic safety laws and regulations.
Notice is hereby given.
Traffic Police Brigade of Danyang Public Security Bureau
July 16, 2024
Source: Danyang Traffic Police
share
collection
Looking