laitimes

Successfully completed!

On June 30, the renovation project of the Xiuwen Oil Depot Railway Special Line of Shanxi Great Wall Petroleum Co., Ltd. to access Xiuwen Station was successfully completed, which created favorable conditions for the opening of the special line in the next step.

Successfully completed!
Successfully completed!
Successfully completed!

Shanxi Great Wall Petroleum Co., Ltd. Xiuwen Oil Depot Railway Special Line Project is located in Xiuwen Town, Yuci District, Jinzhong City, Shanxi Province, and the special line is connected to Xiuwen Station of Nantongpu Line. The renovation project of Xiuwen Station mainly involves the removal of 2 groups of existing interlocking turnouts and the addition of 8 groups of interlocking turnouts; The catenary was reconstructed with 119-96# soft span, 149-126# soft span, wrist arm column, and lower anchor column, and the power supply line of the Xiuwen subdivision was renovated; Modify the station computer interlocking software, signal centralized monitoring software, STP software, and LKJ data replacement.

Successfully completed!
Successfully completed!
Successfully completed!

In 2024, the group company will list the special railway line project as a construction project that must be guaranteed to be opened, as the leader of the guarantee team for the construction of the special line, with the strong support of the relevant professional departments such as the Ministry of Science and Technology and Information Technology and the Ministry of Transportation of the group company, the company will set up a professional technical team, reverse the construction progress, actively coordinate all parties, focus on the difficulties of the project, implement innovative measures, and establish a team led by the relevant departments of the group company + organization and coordination of the project management company + the guardianship and cooperation of each equipment unit, design + supervision, The construction unit will implement the "1+3" collaboration mechanism to ensure that the project is implemented as soon as possible.

Successfully completed!
Successfully completed!

In order to strictly control the three passes of safety, quality and progress, the company has organized relevant units to hold special meetings to study and discuss from the design plan research to the review of construction drawings, from the determination of the construction plan to the refinement of the on-site construction organization, and arranged the project management personnel to go deep into the site to coordinate the professional forces of public works, electricity, power supply, etc., supervise the construction unit to strictly abide by the construction specifications, and successfully completed the construction task of the station renovation on June 30, 2024.

Successfully completed!

Since its establishment in 2022, Shanxi Railway Construction Project Management Consulting Co., Ltd. has always adhered to the business philosophy of "high-quality service, accurate and efficient, standardized management, and win-win situation between roads and land", actively served the owners, gave full play to the professional advantages of the railway, served the local economic development, and continued to build high-quality railway quality projects.