laitimes

As of 17:00 on May 15, 2024, the highway conditions in the province are summarized

author:Shaanxi Expressway

Until 17:00 on May 15, 2024

The rest of the highways in the province are normal

01 Provincial highway traffic control map

As of 17:00 on May 15, 2024, the highway conditions in the province are summarized

02Traffic control

First, the main line is closed

1. Due to the construction of the special maintenance and remediation project from Taiyi Palace to Yingpan, from 12 o'clock on April 15 to 12 o'clock on July 15, 2024, all vehicles will be prohibited from passing in the K946+239 to K910+085 section between Yingpan Interchange in Xi'an direction and Taiyi Palace Interchange in the Xizhen section of Baomao Expressway, and trucks and passenger cars with more than 19 seats (excluding 19 seats) will be prohibited from passing through the section from Qujiang to Wangmang Hub Interchange in the direction of Ankang; The entrance and exit of Weiqu toll station are two-way, the entrance and exit ramp of Taiyi Palace toll station in the direction of Xi'an, and the entrance of the Yingpan toll station in the direction of Xi'an. Vehicles heading to Xi'an can go through the Shuiyang section of the Danning Expressway to the Shanyang hub interchange, and detour to Xi'an through the Shangman section and the Lanshang section of the Fuyin Expressway; Or you can go to Xi'an through G211 National Highway to Guangxiang Street, and through G210 National Highway through Xi'an Outer Ring Expressway and Guanzhong Ring Road; Or you can go to Gepai through S102 Provincial Highway, pass through Caoping Town, Jiujianfang, Gepai Town, and enter the blue business section of Fuyin Expressway at Gepai toll station to detour to Xi'an.

2. The Xi'an Outer Ring Expressway Wangmang Hub Interchange is closed in both directions to the Xi'an direction ramp of Baomao Expressway; The ramp of Baomao Expressway Ankang Interchange to Xi'an Outer Ring Expressway is closed, and the ramp of the main line of the Ring Expressway is closed in both directions to Xizhen Expressway.

3. Affected by the construction of Xizhen Expressway, from 12:00 on October 11, 2023 to 24:00 on July 31, 2024, the ramp of the Xi'an Ring Expressway to enter the Xizhen section of Baomao Expressway through Qujiang Interchange will be closed, and trucks and passenger cars with more than 19 seats (excluding 19 seats) will be prohibited from transferring from Qujiang Toll Station to Baomao Expressway.

4. Due to the construction of the Fangjia Village Traffic Capacity Improvement Project of the Xi'an Ring Expressway, from February 26, 2024 to 24 o'clock on July 31, 2024, the ramp control of the Fangjia Village Interchange in the Xiwei Section of the Lianhuo Expressway in the direction of the inner ring (southern section) of the Ring Expressway; From February 26, 2024 to 24:00 on June 30, 2024, the Fangjiacun interchange ramp of the Xiwei section of the Ring Expressway will occupy one lane.

5. From 10 o'clock on November 7, 2023 to 24 o'clock on September 30, 2025, due to the implementation of reconstruction and expansion construction, the main line between the three bridge toll stations of the Xixing section of Lianhuo Expressway and the Xiwu hub interchange will be closed in both directions, the ramp of Maoerliu Interchange and Xiwu Interchange to Xixing Expressway will be closed, and the entrances and exits of the three bridges, Xianyang and Xianyang West toll stations will be closed.

6. Affected by the reconstruction and expansion of Xixing Expressway, the Xiwu Hub Interchange of Xi'an Outer Ring Expressway will be closed to the ramp in the direction of Xianyang and Sanqiao of Xixing Expressway, and vehicles going to Xianyang will be diverted from the direction of Maoling, and vehicles going to Sanqiao will be diverted from the south direction of Xianyang, which is expected to end at 24 o'clock on September 30, 2025.

7. Due to the construction of the reconstruction and expansion project, from March 15, 2023 to September 30, 2024, the entrance and exit of the Terracotta Warriors and Horses Special Line and the Terracotta Warriors and Horses toll station in the Xiwei section of the Lianhuo Expressway will be closed, and vehicles going to the Terracotta Warriors and Horses Museum will leave the Lintong and Xinfeng toll stations.

8. Due to the reconstruction and expansion construction of Xixing Expressway, from 12 o'clock on September 6, 2023 to September 30, 2025, the exit ramp of the Maoerliu Interchange to the Three Bridges Toll Station in the inner ring direction of the Ring Expressway will be closed.

9. Due to the construction of highway capacity improvement, from 7 o'clock on January 8, 2024 to 24 o'clock on July 31, 2024, the ramp in the direction of the inner ring of the inner ring of the city expressway at the entrance of the Baqiao toll station in the Xiwei section of the Lianhuo Expressway will be closed. During the construction period, vehicles from the Baqiao toll station to the inner ring direction will go from the Fangjiacun interchange to the Xinzhu toll station and re-enter the ring expressway, or from the East Third Ring Road Andi interchange through the Guanting interchange, Banpo interchange, Changle East Road to the Xiangwang interchange to enter the inner ring of the ring expressway.

10. Due to temporary construction, the section K798+371 to K814+181 between Xinxing and Sanyuan in the Xifu section of Baomao Expressway is closed to large transport vehicles, and large transport vehicles going to Xi'an need to bypass Yanxi Expressway.

11. Due to the construction of pavement maintenance and renovation projects, from May 6th to June 6th, the K311 to K330 section between Yulin North and West Left Boundary in the direction of Jingbian of Yujing Section of Baomao Expressway was single-width two-way traffic, and from May 6th to May 22nd, the entrance and exit of Jingbian direction of Yulin West Toll Station were temporarily controlled. From June 7th to July 4th, the section K382 to K395 between the Huanghaojie toll station and Jingbian Interchange will be single-width two-way traffic. From July 5th to July 13th, the K412+200 to K414+018 section near Jingbian Interchange in the direction of Jingbian will be single-width two-way traffic, and vehicles from G65 Baomao Expressway to G20 Qingyin Expressway in Yulin direction will need to detour in advance or get off the highway from Jingbian East Toll Station, and vehicles in the direction of Yan'an will need to detour in advance or get off the highway from Jingbian West Toll Station. From July 14th to July 22nd, vehicles transferring to G20 Qingyin Expressway from K412+127 to K414+018 near Jingbian Interchange in the direction of Yulin need to detour in advance. From July 23rd to August 8th, the K331 to K336+284 section between Yulin West and Hengshan Toll Station in the direction of Yulin will be single-width two-way traffic, and vehicles entering and exiting the West Left Boundary Toll Station from Jingbian to Yulin will need to detour in advance.

12. From 12 o'clock on May 6, 2024 to 24 o'clock on July 24, 2024, due to the special maintenance and rectification of the expressway, the inner ring direction of the K46+005 to K37+800 section between the Hechizhai Interchange and the Afanggong Interchange of the Ring Expressway will be temporarily controlled, and the single-width two-way traffic will be implemented in the outer ring direction. The inner ring of Hechizhai Interchange to Afanggong Interchange prohibits the passage of trucks and large buses higher than 2.5 meters, and all trucks and large buses higher than 2.5 meters in the direction of the main line to the inner ring need to exit the highway through the Hechizhai toll station or bypass the Western Han Dynasty and Xi'an Outer Ring Expressway. The main line in the direction of the inner ring is transferred to the exit of the Afanggong toll station and the ramp of Xibao Expressway. The entrance of Hechizhai and Afanggong toll stations will turn to the ramp in the inner ring direction of the Ring Expressway, and the ramp in the direction of the inner ring of the West Han Expressway and Xibao Expressway will be controlled in the direction of the inner ring of the Ring Expressway, and the control is expected to be lifted on May 28, 2024.

13. Due to road construction, from May 7 to July 30, 2024, the road in the Xi'an direction of the K1356+200 to K1358+000 section between the Hanzhong service area of the Hanning section of the Beijing-Kunming Expressway and the Mianxian toll station will be closed, and the single-width two-way traffic will be implemented in the Sichuan direction, with a speed limit of 60KM/h.

2. The entrances and exits of toll stations are closed and restricted

1. Due to road maintenance construction, from 0:00 on September 5, 2023 to 24:00 on December 31, 2024, the entrance and exit of the Majiapu toll station of the airport-specific expressway will be closed

2. Due to the construction of the Wangjiatou traffic ramp pavement disease control project, the entrance and exit control of the Wangjiatou toll station of Yujia Expressway is expected to end on May 31, 2024.

3. Due to the renovation and construction of the weighing system, from 08:00 to 18:00 every day from May 8 to July 15, 2024, the 003 lane at the entrance of the Xixiang toll station in the Xiluo section of the ten-day expressway will be temporarily controlled, and the 001 and 002 lanes at the entrance will only allow the passage of two-axle blue trucks for passenger cars and ETC suit users, and the rest of the trucks will be bypassed from National Highway 316 to the Wuzishan toll station; The 002 lane at the entrance of the Baocheng toll station is temporarily controlled, and the 001 lane at the entrance is only allowed to pass through the two-axle blue plate trucks of passenger cars and ETC suit users, and the rest of the trucks can bypass the Hanzhong North Toll Station.

4. Due to the construction of the mechanical and electrical system renovation project, the exit of the Huazhou toll station in the Xiwei section of the Lianhuo Expressway, the exit of the Luofu toll station 003, and the exit of the Xinfeng toll station 106 are prohibited from passing vehicles with a width of more than 3.2 meters, and the construction is expected to end on July 31.

5. Due to the construction of the mechanical and electrical system renovation project, the 107 Weinan and North Exit of the Weiyu Section of the Yulan Expressway is prohibited from passing vehicles with a width of more than 3.2 meters, and the construction is expected to end on July 31.

6. Due to the scale renovation project, the temporary control of lane 004 at the entrance of the Weiyang North Toll Station of the Ring Expressway is expected to end on May 29.

7. Due to the renovation construction of the platform, from May 10 to May 30, 2024, the exit of the Afanggong toll station in the Xibao section of the Lianhuo Expressway will be closed to large vehicles.

8. Due to the construction of mixed lanes, from 12 o'clock on May 11 to 19 o'clock on May 15, 2024, trucks and non-ETC vehicles at the entrance of the Fenglou toll station in the commercial boundary section of the Shanghai-Shaanxi Expressway need to detour to G345 (Guoshan Road) from the Shangnanxi and Jinsixia toll stations to enter the Shanghai-Shaanxi Expressway.

9. Affected by the construction of large and medium-sized repairs of national highways, from May 11 to June 30, 2024, passenger cars with more than seven seats and yellow trucks will be prohibited from passing at the exit of the Mizhi and Shilipu toll stations in the Yusui section of the Yulan Expressway.

10. Due to the construction of the water treatment project, the temporary control of the exit ramp in the Xi'an direction of the Rongchuan toll station of the Lanshang section of the Fuyin Expressway is expected to end on May 22.

11. Due to the construction of the renovation of the platform, the 102 mixed lanes at the exit of the Gongchuan toll station of the Lanshang section of the Fuyin Expressway are temporarily controlled, and the exit 101 ETC lanes are only allowed to pass ETC buses and a type of blue truck equipped with ETC suits, which is expected to end on June 15, 2024.

12. Due to temporary construction, trucks are prohibited from passing at the entrance of the toll station of the Baochuan section of the Yinkun Expressway.

03 Heavy traffic flow

The exit of the Baqiao toll station in the Xiwei section of the Lianhuo Expressway is slow.

04 Geological hazards

1. Due to the partial subsidence of the subgrade slope due to water damage, the K51+300 to K52+000 section between the Jingyang North Toll Station and the Jingyang Service Area of the Xi'an Outer Ring Expressway occupies the emergency lane.

2. Due to the repair of potholes on the road surface, the section K1207+700 to K1207+930 between Ganxi and Baoti in the direction of Gansu in the Baotian section of Lianhuo Expressway occupies the driving lane and emergency lane.

3. Due to the repair of water damage on the high slope, the K31+900-K32+200 section between the Panlong toll station in the Zichang direction of Ziyao Expressway and the Yongping service area occupies the emergency lane and driving lane. The construction will end from 7 a.m. to 6 p.m. daily (except holidays) and is expected to end on May 25, 2024.

05 The service area is closed

1. Due to temporary construction, the parking area of Chengcheng and Azhuang of Hetong Expressway is closed.

2. Due to the imperfection of the equipment, the Shanyang East service area of the denim expressway is closed in both directions.

3. Due to maintenance construction, the Chengshang Expressway traffic service area is closed.

06Construction information

(1) Hebao high-speed copper section

Due to road maintenance construction, from March 20 to December 31, 2024 (8 a.m. to 6 p.m. daily), the K692+200 to K742+820 sections between Guanzhuang Interchange and Tuqiao Interchange in the Tongxun section of Hebao Expressway will alternately occupy overtaking lanes, driving lanes and emergency lanes in both directions.

(2) Wuding Expressway

Due to daily maintenance construction, from February 18, 2024 to December 31, 2024, the K0+000 to K92+217 sections of the Wuding Expressway will alternately occupy the overtaking lane, driving lane and emergency lane in both directions, and the speed limit of the construction section is 40km/h.

(3) Xifu section of Baomao Expressway

1. Due to the construction of the Jingyang Interchange Project of the Baomao Expressway under the southern section of the Origin West Road, the K823+500 original Jingyang Toll Station entrance to Xi'an direction between Jingyang and Jinghe New Town Toll Station of the Xifu Section of Baomao Expressway is closed, and the exit ramp of the main line Xi'an to Jingyang Toll Station is closed, and all vehicles are driving on the newly repaired ramp. The construction is expected to end at 6 p.m. on July 31, 2024.

2. Due to the replacement of steel pipe guardrails and marking construction in the middle of the belt, the K687 + 401 to K647 + 000 sections between Huangling West and Yangquan in the Xifu section of Baomao Expressway occupy the overtaking lane and a driving lane or a driving lane and an emergency lane in both directions, and the construction is expected to end at 8 o'clock on May 31.

3. Due to temporary construction, K751+300 between Yan'an and Tongchuan North in the Xifu section of Baomao Expressway occupies the emergency lane.

4. Due to the construction of road milling and marking, from 10 a.m. on May 13, 2024 to 18 a.m. on September 26, 2024, the section K731+539 to K789+739 between the two-way Ma'e section of the Xifu section of the Baomao Expressway and Tongchuan North will randomly occupy part of the lanes.

(4) Yanzhiwu Expressway

Due to daily maintenance and construction, from February 18 to December 31, 2024, the K0+000 to K109+930 sections of the Yanzhiwu Expressway will alternately occupy the overtaking lane, driving lane and emergency lane in both directions, and the speed limit on the construction section is 40km/h, speeding and overtaking are prohibited.

(5) Xi'an Outer Ring Expressway

Due to road surface damage, the K50+300 between Tangyu toll station and Yangzhuang service area in the inner ring direction of Xi'an Outer Ring Expressway occupies the driving lane and emergency lane.

(6) Taifeng Expressway

Due to the repair of pavement potholes and hot repair process, the new paved pavement and the original pavement are uneven, and the K146+950 between Shaanxi and Gansu boundary and Fengxian toll station in the Taibai direction of Taifeng Expressway occupies the driving lane and emergency lane.

(7) The extension section of the Changyan Expressway

Due to the road milling and resurfacing construction, from 7 a.m. to 7 p.m. every day from May 14 to May 16, 2024, the section K315+300 to K315+560 between the Qiankun Bay Toll Station and the Yellow River Bridge in the Shanxi direction of the Yanyan Expressway will occupy the driving lane and emergency lane.

(8) Yangzhen Expressway

1. Due to the construction of ramp markings, from May 8 to June 30, 2024, from 8 a.m. to 6 p.m. every day, the K0 to K49+533 section between Wuzishan and Zhenba of Yangzhen Expressway will alternately occupy the overtaking lane and driving lane.

2. Due to the cleaning of the tunnel roof drainage ditch, from 8:30 to 18:00 every day from May 14 to May 18, 2024, the two-way traffic lane will be occupied in the K0 to K49+553 section between Wuzishan and Zhenba in the ancient town section of Yangzhen Expressway.

(9) Ten-day high-speed west section

1. Due to the bridge inspection and construction, from May 8, 2024 to August 31, 2024, from 08:00 to 18:00 every day, the section K296+210 to K357+000 between Chazhen and Shahe in the two-way section of the ten-day high-speed Xiluo section will occupy the driving lane and emergency lane.

2. Due to the construction of pavement disease treatment: from May 12 to June 30, 2024, from 8 a.m. to 6 p.m. every day, the K0+800 to K2+800 section of the Xinjiezi Toll Station Connecting Line of the 10-day Expressway Xiluo Section will implement single-width two-way traffic (no construction in bad weather and holidays).

(10) Xibao section of Lianhuo Expressway

Due to the construction of the G30 Expressway under the middle road of Fengxi New Town, from May 8 to June 30, 2024, the section K1084+730 to K1085+140 between the Xianyang South Toll Station in the Xi'an direction of the Xibao section of the Lianhuo Expressway and the Xiwu Interchange will implement a single-width two-way traffic.

(11) The West Han section of the Beijing-Kunming Expressway

Due to line failure, there was a two-way power outage between the West Han Section of the Beijing-Kunming Expressway from Huangguan to Ningshaanxi from the Shamaoshi Tunnel to the Shitouzi Tunnel from K1196 to K1197, and the Hejialiang Tunnel to the Aiziping Tunnel from K1207 to K1220.

(12) Xiwei section of Lianhuo Expressway

1. Due to the construction of the pavement milling and resurfacing of the maintenance project and the restoration of the marking, the section K902 to K1032 between Tongguan and Huokou in the Xiwei section of Lianhuo Expressway occupies part of the lanes in both directions, and the construction is expected to end on September 30, 2024.

2. Due to the construction of bridges, culverts and tunnel maintenance projects, the K902 to K1032 sections between Tongguan and Huokou in the Xiwei section of Lianhuo Expressway occupy part of the lanes in both directions, and the construction is expected to end on September 30, 2024.

(13) Weiyu section of Yulan Expressway

1. Due to the construction of road milling and resurfacing and marking restoration works, the section K490+909 to K581+973 between Pucheng East and Yushan Interchange of Weiyu Section of Yulan Expressway occupies part of the lanes in both directions, and the construction is expected to end on September 30, 2024.

2. Due to the construction of bridges, culverts and tunnel maintenance projects, the section K490+909 to K581+973 between Pucheng East and Yushan Interchange of Weiyu Section of Yulan Expressway occupies part of the lanes in both directions, and the construction is expected to end on September 30, 2024.

07 Special Tips

1. Due to the needs of urban exhaust gas treatment, trucks are prohibited from passing at the exit of Baoji and Jiangcheng toll stations in the Baotian section of Lianhuo Expressway.

2. According to the notice of the Shangnan County Government, 24 hours a day, trucks with four axles and above are prohibited from passing at the exit of the Shangnan West Toll Station.

3. Due to the need for exhaust gas treatment, from 17 o'clock to 24 o'clock every day, the high-speed section between Weinan East and Weinan West Toll Station (Weinan Transit Line) of Lianhuo Expressway West Wei Section is prohibited from crossing large and medium-sized trucks and yellow trucks, and the entrance and exit of Weinan West Toll Station are prohibited from yellow trucks throughout the day. According to the notice of the traffic police, the entrances of Huazhou West, Weinan East, Huazhou, Luofu and Huayin toll stations are prohibited from 22 o'clock to 6 o'clock the next day on Fridays, Saturdays and Sundays.

4. According to the notice of the traffic police, the entrance of the toll station of Pucheng East, Luyang Lake, Lindian, Weinanbei, Gaotang and Qiaonan of the Weiyu section of the Yulan Expressway is closed to hazardous chemical transport vehicles from 22 o'clock to 6 o'clock the next day every Friday, Saturday and Sunday.

5. The Guangyuan toll station of the Guangshan section of the Beijing-Kunming Expressway to the Qipanguan toll station is prohibited from 0:00 at night to 6:00 the next day for passenger cars of type 2 and above.

Wechat sweep

Pay attention to the official account

People draw lines