On the 15th, the military transfer platform bridge located in the high-tech zone was officially completed and opened to traffic. The bridge is designed as a two-way six-lane bridge, with non-motorized lanes and pedestrian sightseeing trails on both sides of the bridge deck. The completion of the Mobilization Bridge has greatly shortened the travel time from the high-tech zone to Lishan District.
All-media reporter Cong Nan