laitimes

The No. 2 extra-large bridge in Yueba Village of Anlan Expressway was successfully closed

author:Ahead plus
The No. 2 extra-large bridge in Yueba Village of Anlan Expressway was successfully closed

Recently, with the last box girder slowly hoisted to the predetermined position, the No. 2 bridge in 13 Biaoyueba Village of the Langao to Shaanxi-Chongqing boundary section of Anlan Expressway was successfully closed, marking the completion of the main project of the bridge and laying a solid foundation for the completion and opening of the Langao to Shaanxi-Chongqing boundary section of Anlan Expressway on schedule.

The No. 2 extra-large bridge in Yueba Village of Anlan Expressway was successfully closed

The No. 2 bridge in Yueba Village, which was constructed by the Anlan 13 contract section of China Railway 12th Bureau, is located in Four Seasons Town, Langao County, Ankang City, with a total length of 1,297 meters and a bridge deck width of 12.25 meters. During the construction of the bridge, the project construction unit continuously optimized and adjusted the construction organization plan, implemented safe construction and protective measures, overcame multiple difficulties such as narrow construction site, frequent heavy rain and floods in the flood season, and low temperature construction in winter, and comprehensively grasped the quality and safety management in the construction process to ensure the efficient and effective progress of various construction links.

The No. 2 extra-large bridge in Yueba Village of Anlan Expressway was successfully closed

The section from Langao to Shaanxi-Chongqing boundary of Anlan Expressway is an important part of the G69 of the national highway silver hundred line in Shaanxi, carrying the important task of connecting the two provinces and cities of Shaanxi and Chongqing and promoting the coordinated economic and social development of the regions along the line.

Liang Fan, chief reporter of Xi'an Newspaper All Media