laitimes

More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".

author:Movement news

"The joint inspection operation of the dynamic inspection line 4 line and 2 columns CR300AF-2015 EMU has been completed, and the conditions for leaving the warehouse have been met". At 0:25 a.m. on April 29, with the production instructions from the walkie-talkie, the night maintenance task of the EMU in the Guiyang North EMU inspection warehouse of the Guiyang Depot ended.

More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".
More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".
More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".

It is reported that the "May Day" holiday railway transport period from April 29 to May 6, a total of 8 days, a total of 140 pairs of EMUs, 12 groups of reconnection, all 88 groups of EMUs will be arranged every day to run on the line.

In order to make every effort to ensure the safety of EMUs, more than 600 cadres and workers will stick to their posts during the festival, and carry out EMU maintenance and application work 24 hours a day in a "three-shift system".

More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".
More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".
More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".

Since late April, this section has calculated in advance the demand for EMUs during the peak transportation period of the "May Day" holiday, optimized the production organization arrangement, and implemented "off-peak" maintenance for the EMUs that were put into operation during the holiday to ensure that the EMUs were "zero maintenance" during the festival and all of them were put into operation. At the same time, in order to improve the operation quality of the EMU, this section focuses on the seasonal risks such as bad weather and high temperature driving that may occur in the near future, and focuses on the inspection, maintenance and rectification of the customer service facilities, air-conditioning system and key components of the EMU in the upper part of the EMU, so as to completely eliminate the "stubborn old diseases" of the EMU and ensure that the technical status of each component of the EMU is in good condition.

More than 600 "bullet train doctors" are ready to ensure the smooth operation of "May Day".

At the same time, in order to efficiently respond to possible emergencies, the section is equipped with strong emergency support forces, and the safety production dispatching command center is on duty 24 hours a day, implementing remote monitoring of the EMUs running on the line, and selecting 10 emergency backbone forces to be stationed at Guiyang North Railway Station to ensure that emergencies can be properly handled in a timely manner, and to ensure the safety and punctuality of the EMUs during the festival.

Correspondents: Mou Zhibin, Li Zhengpeng, Yang Jiewen