laitimes

The Xiaoliu Road School in the north of the bridge is about to be completed

author:New Jiangbei

Good news! The Xiaoliu Road School in Taishan Street is expected to be put into use in the second half of the year! At present, it is carrying out decoration and mechanical and electrical installation. In particular, this school has built a large basement and set up a full underground pick-up system, so parents will have more peace of mind when picking up and dropping off their children.

The new project of Xiaoliu Road School is located in Taishan Street, east to Xiaoliu West Road, west to Chuangye River, south to Kaitian Road, north to Xiaoliu North Road, with a total area of 60,500 square meters and a total construction area of about 96,700 square meters.

The Xiaoliu Road School in the north of the bridge is about to be completed

"The entire playground is currently being poured with a concrete base. Following the deputy chief engineer of the project, Zhou Haojun, came to the school playground, and a concrete sky pump "draws" an arc under the blue sky, "The school has two outdoor playgrounds and wind and rain playgrounds, and in the future, children can not only exercise outdoors, but also take physical education classes indoors in rainy and snowy weather." ”

The Xiaoliu Road School in the north of the bridge is about to be completed

"The school's No. 1 teaching building, No. 4 administrative building, No. 7 canteen, and wind and rain playground have completed the main acceptance, and passed the acceptance of Nanjing's high-quality structural engineering on April 8. Li Jiawei, the project leader of the public construction center, said that at present, all single buildings and underground garages have fully entered the stage of decoration and mechanical and electrical installation.

The Xiaoliu Road School in the north of the bridge is about to be completed

Walking into the teaching building, some of the classrooms have been renovated. "During the renovation process, we used high-grade materials to provide a healthy learning environment for our students. Zhou Haojun said that the classroom door is made of E1 level environmental protection materials, and the ceiling gypsum board has the characteristics of high strength, high density, high nail holding force, waterproof, fireproof and anti-cracking, sound insulation and anti-deformation.

The project is equipped with a large basement of 25,000 square meters and a fully underground pick-up and drop-off system, which is guided by two sunken plazas, and sets up student waiting areas, parent waiting areas, parent parking areas, etc. The whole underground pick-up and drop-off system not only fundamentally solves the problem of traffic congestion during the peak period of commuting to and from school, and alleviates the parking anxiety of students' parents when picking up and dropping off, but also fundamentally solves the safety problem of students' pick-up and drop-off through the two-way docking of the student waiting area and the parent waiting area.

The Xiaoliu Road School in the north of the bridge is about to be completed
The Xiaoliu Road School in the north of the bridge is about to be completed

"When the main building is almost completed, the construction of the green part of the school will begin. Li Jiawei, the project leader of the public construction center, said that Xiaoliu Road School is equipped with plants with the theme of "peach and plum all over the world", combined with evergreen and four-season flowers, and through 7 thematic zoning design, it eliminates visual fatigue and pays attention to the matching of fragrances, so as to build an excellent learning environment with excellent fragrance.

Let's look forward to the opening of the new school~

Source | Nanjing Jiangbei New Area Public Construction Center