laitimes

Thumbs up! Baishazhou is in tatters and has been restored

author:White Sandbank
Thumbs up! Baishazhou is in tatters and has been restored

Wuhan Baishazhou road network planning Baisha 4th Road

The Baisha No. 4 Road in the Third Ring Road of Baishazhou, Wuhan, is repaired once every half a month, and a major repair every month, when will it be repaired again? It will be repaired in 19 years to be repaired in 23 years, but in five years, it will be broken like the previous Fengsheng Road. Hasn't Hongshan District considered how the Hanyang River Beach planned and developed the roads near the river beach? "

▲A map of Wuhan Baishazhou planning (platform exclusive)

Hongshan District Urban Management Law Enforcement Bureau

Municipal Facilities and Landscape Management Section responds

The handling situation is now replied as follows:

Regarding the problem of road surface damage on Baisha 4th Road. After verification, our unit has repaired the damage to the road surface in the early stage of Baisha 4th Road.

Thumbs up! Baishazhou is in tatters and has been restored

In view of the repeated damage, our unit will arrange construction personnel to conduct road inspections on the road section in the near future, and strive to do a good job in road repair in a timely manner. The situation has been explained to you.

Thumbs up! Baishazhou is in tatters and has been restored
Thumbs up! Baishazhou is in tatters and has been restored