laitimes

Meltwater terminates flood control level 4 emergency response

author:Beautiful meltwater style Miao Township
Meltwater terminates flood control level 4 emergency response
Meltwater terminates flood control level 4 emergency response

Township people's governments and member units of the autonomous county flood control and drought relief headquarters:

In view of the fact that the heavy rainfall weather process in our county has basically ended, the water potential of the main rivers is stable. According to the provisions of the "Emergency Plan for Flood Control and Drought Relief in Rongshui Miao Autonomous County", with the approval of the leaders of the county flood control and drought relief headquarters, it was decided to terminate the four-level emergency response for flood control in the autonomous county from 8 o'clock on April 22, 2024.

All townships, towns, and member units are requested to conscientiously perform their duties and continue to do a good job in flood prevention, emergency rescue, and disaster relief during the flood season.

Rongshui Miao Autonomous County Flood Control and Drought Relief Headquarters

April 22, 2024

Meltwater terminates flood control level 4 emergency response

Source丨Rongshui Miao Autonomous County Flood Control and Drought Relief Headquarters

Proofreading on duty丨Huang Xingqiao

Editor丨Liang Liming

Responsibility audit丨 He Cheng

Responsible Producer丨Gong Xiangyou

Produced by丨Rongshui Miao Autonomous County Rong Media Center

"Drunken Beauty Melt Water" APP and "Xiumei Melt Water Style Miao Township" WeChat public account are all rights reserved, and the work may not be reproduced, excerpted or otherwise used without written authorization.

Meltwater terminates flood control level 4 emergency response