If you pave tiles again, I swear that these places must be watched in person, not because I don't trust them, but I am afraid that some mistakes will be made again!
——Staring at the tile itself——
It is best to unpack the tiles as soon as they are moved, and see if there is a problem with the tiles:
Breakage rate
In the process of moving tiles, it is inevitable that there will be bumps, the key is not too much, otherwise the damage rate will be very high!
Flatness
The tiles are generally flat, but you need to check them again, for example: stick the two tiles face to face together to see if there is a width in the middle, if so, you must pay attention to the width can not exceed 3 mm, otherwise it will be uneven on the ground!
Adhesive-backed release agent
Secondly, you look at the back of the tile, there is no white substance, this kind of thing is called adhesive release agent, if it is not cleaned up in time, it will affect the later paving effect!
——Staring shop——
Obviously told the workers to shop the whole house, I thought one sentence was enough to explain, but some workers with little experience may give you the whole fake shop!
The real shop is the whole house is connected very smoothly, it is the location of the door, not to mention that it is the door, get a door stone of the same color, this is a fake shop!
This situation is not unexpected, so when laying floor tiles, you must keep an eye on how he handles the position of the doorway to prevent you from getting a fake paving.
——Staring at the bathroom waterproof——
The bathroom must be waterproof, if you don't watch the scene, some workers may be lazy, directly do a waterproofing, this is not good!
And you have to pay attention to wait for the first waterproof to dry thoroughly before you can do waterproofing, otherwise the waterproof effect is not ideal!
At least 1.8 meters should be done, otherwise if you usually take a bath, it will penetrate into it, and after a long time, it will be prone to various problems!
——Staring at the flue bricklay——
It stands to reason that there is nothing to keep an eye on the flue bricklaying, if you meet a worker who wants to be lazy, you may directly hang the net + paste the tile, this is not strong, and wait for a year and a half, the brick will fall almost the same!
The best way is: first use red bricks or green bricks, then brush cement, hang nets, and finally paste bricks, such a series of operations, although troublesome, but indeed strong and durable.
(Picture invasion and deletion)