laitimes

Jianhu County Highway Development Center strengthens spring road maintenance

author:New things in the Yangtze River Delta

Since the beginning of this year, due to the frequent rainy weather in Jianhu, many roads in the territory have appeared cracks, potholes, ruts and other road diseases to varying degrees, which has a certain impact on the travel of the masses. In order to eliminate the hidden dangers of highway traffic as soon as possible, a few days ago, the Jianhu County Highway Business Center seized the current spring fine weather, comprehensively strengthened the daily maintenance of roads in the jurisdiction, and increased the maintenance and treatment of road surface diseases. According to the degree of damage to the pavement, serious pavement potholes are repaired by re-paving asphalt after milling, and general pavement cracks are directly repaired by asphalt grouting or joint tape. In the process of maintenance and repair, the maintenance and maintenance personnel conscientiously implement the repair technical specifications, strictly implement the process requirements, strictly control the quality of repair, and ensure that the road surface condition is improved to the greatest extent.

Jianhu County Highway Development Center strengthens spring road maintenance
Jianhu County Highway Development Center strengthens spring road maintenance
Jianhu County Highway Development Center strengthens spring road maintenance

(The picture shows that on April 18, the Jianhu County Highway Development Center organized the maintenance and treatment of S331 pavement diseases in the territory, and the maintenance and maintenance personnel methodically repaired and treated the ruts, potholes, cracks, etc. on the road surface to ensure the quality of road conditions.) )

Over the past few days, the Jianhu County Highway Development Center has invested more than 180 maintenance personnel, more than 30 sets of machinery and equipment, and organized the spring centralized maintenance and treatment of G343, S233 and S331 pavement diseases in the jurisdiction, with a total of more than 9,000 square meters of milling and paving, more than 100,000 meters of joints and more than 10,000 meters of joints. In the next stage, the center will continue to seize the good weather, concentrate on comprehensively carrying out the maintenance and treatment of pavement diseases, continuously improve the level of highway maintenance and management, and ensure the safety and smooth flow of highways. (Contributed by: Zheng Hu, Li Wei, Li Dawen)

Editor: Tang Zhixing