Debriefing report of the renovation project manager

author:Template template sample assistant
Debriefing report of the renovation project manager

Renovation Project Manager's Debriefing Report 1

  I am from the xx project department. First of all, I am very grateful to all the leaders for taking time out of their busy schedules to listen to my debriefing, and I am also honored to be a member of the installation branch. XX year is a turning point in my life and a new starting point in my life. It has been more than four months since I started the induction training, and in these months, with the help of leaders and colleagues, I have learned a lot about the work process, and I have also deeply experienced our company's corporate culture and various rules and regulations with "integrity" as the core.

  After coming to the project, I was mainly responsible for the on-site construction, on-site management and project documentation, and I was also actively learning about budgeting. During this period of project work, I learned that the management of a project is mainly divided into four parts: safety, quality, progress and business, safety is the prerequisite for the normal work of the project, quality and progress are the lifeblood of the project, and business is the cost and profit of the project. So for a period of time, I have been working hard to implement and study these four major pieces of work. Next, I would like to report on my specific work since joining the company as follows:

  1. Ask for advice with an open mind and study hard.

  Although I am a manager on the project, as a newcomer who has just joined the company, it is mainly based on learning, so after coming to the project, my first job is to read the drawings, familiar with the construction process of the whole project, when I encounter something I don't understand, I will aggressively ask the leaders and colleagues on the project for advice, and at the same time go to the labor team to work with the labor personnel and learn specific construction methods from them.

  2. Serve with affection and work hard.

  In my work, I treat everyone politely, insist on a warm smile, patiently help the labor staff, and I can't answer the questions they ask, I ask the leader for advice, and then give answers; For quality problems, when labor personnel need to rework, I always do 'courtesy first', do not put on a show, patiently communicate with them, and avoid conflicts with them and affect the company's image.

  3. Abide by the system and dare to grasp and manage.

  When the construction is carried out on the site, especially during the installation of the steel structure, due to the high altitude work, the danger is greater, I manage the workers according to the system and procedures, and strictly inspect the personnel entering and leaving every day to avoid the theft of the company's property caused by the entry of suspicious personnel; For those who do not have safety measures in place, such as: 'Entering the construction area without wearing a helmet; Failure to wear seat belts when working at height; There are no fire extinguishing facilities when the fire is used, etc., I will rectify and punish in accordance with the company's systems and procedures, and put various safety measures in place to ensure zero accidents during construction.

  Fourth, hard work and tirelessness.

  I am completely obedient to the leader's arrangement and implement it to the letter; Work with the mentality of persevering until the 'last minute', and continue to do a good job every day; I also take the initiative to undertake the work that I don't know, and strive to be able to share more work for leaders and colleagues, quickly improve myself, and be competent for my own position. As a scholar, I always ask them for their experiences in the work.

  During this period of work, I am also clearly aware of my own shortcomings, mainly at this moment:

  1. Short working hours, insufficient work experience, and no effective working methods;

  2. Individual work is not done meticulously enough, and occasionally there is insufficient coordination;

  3. My theoretical level and engineering project experience cannot catch up with the requirements of the work, and it needs to be improved urgently;

  4. Lack of practical experience of professional knowledge, unable to effectively combine the professional knowledge and practical work learned in school in a timely manner, and need more honing and practice.

  Although I still have a lot of deficiencies in my work, I am determined to seriously improve my business skills and work level, make the company stronger and bigger, and contribute to the strength that I should contribute. So in the future, I will try to do the following:

  1. Consciously strengthen learning, while learning professional knowledge, we should also be enterprising to learn the different professional knowledge involved in our installation engineering, broaden the scope of knowledge, and comprehensively improve ourselves;

  2. Overcome youth and irritability, be down-to-earth, improve work initiative, not afraid to do more things, not afraid to do small things, and improve yourself in bit by bit practice;

  3. Improve self-performance ability, resolutely be able to fully competently perform all the work of your position after half a year, and strive to cultivate yourself into a qualified employee with a comprehensive business;

  4. Enterprising learning of business knowledge, because only by clearly understanding the cost budget of the project can we save costs in the work and get more profits for the project.

  Although I am a student who has just graduated from school, working for only more than four months, there are many deficiencies, but I always demand myself with the standard of a "qualified five bureau people", take leaders and colleagues as an example to remind myself, and strive to be a qualified five bureau people, can show myself on the big stage of the five bureaus, and contribute to the glory of the five bureaus.

  The above is my work during this period of debriefing report, if there are deficiencies, please criticize and correct the leaders, here, I wish you good health, smooth work, happy every day, everything goes well!

Renovation Project Manager Debriefing Report 2

  In accordance with the company's work objectives, we focus on safe production and improving the quality of the project, strengthen management, change concepts, create high-quality brand projects, lead all employees of the project department, pioneer and innovate, grasp quality, package safety, rush progress, and create benefits, so as to ensure the smooth progress of the project under construction.

  1. Complete the project

  1. Completed the construction task of foundation pit excavation of construction engineering, and made various preparations for the construction of the main body of the foundation;

  2. The construction of the X plant project has been basically completed;

  3. The foundation pit project of X project is completed, the foundation cushion construction is completed, and the construction of waterproof engineering is ready for construction.

  2. Strengthen project quality management

  We insist on relying on quality to survive, In the process of quality management, in strict accordance with the design requirements and various specifications and regulations of construction, the implementation of the project quality responsibility system, requiring all types of personnel to strengthen the quality of the construction personnel of the quality ceremony education, do a good job of pre-construction technical disclosure, clear quality standards and requirements, we adhere to the centennial plan quality first policy, do a good job in the prevention of common quality problems, develop management measures, do a good job in the quality control of each process, each team must do a good job in quality self-inspectionThe project department will do a good job in the supervision and inspection of the whole process of construction, and organize relevant personnel to carry out special inspection on the basis of self-inspection, so as to continuously improve the quality of the project.

  3. Strengthen safety management

  In order to conscientiously implement the safety production regulations, implement engineering safety technical measures, establish and improve safety production management institutions, adhere to the principle of managing production must manage safety, and when safety and production are contradictory, production must obey safety, the project department constructors should do a good job of safety technology disclosure work at the same time when arranging construction tasks, and the construction site should obey safety management. Organize the education of basic construction knowledge and operating procedures, correctly use safety protection facilities and labor protection supplies, and strictly implement various safety technical measures in the construction organization design and construction plan to ensure safe construction production.

  Fourth, the status of construction management

  1. In the construction management of the project, the construction personnel should be organized, planned, reasonable and scientifically arranged, so as to truly play and improve the construction efficiency.

  2. Speed up the construction progress under the condition of ensuring the quality and safety of the project.

  3. To control construction costs, one is to strictly control the expenses of the project department, the second is to increase income, and the third is to do a good job in engineering economic visas.

  4. Strengthen cost management to improve economic efficiency, improve construction management by adjusting the construction team, improve the professional quality of construction personnel, and further deepen the management level.

  5. Strengthen material management, strictly control the quality of materials in the process of construction and use of materials, and strictly prohibit unqualified materials from entering the construction site.

  6. Strengthen construction management and improve the level of construction organization. Correctly select the construction plan, reasonably arrange the construction site, do a good job in on-site scheduling and coordination, speed up the construction progress, shorten the construction period, strengthen technical management, improve the quality of the project, formulate and implement technical and organizational measures to reduce costs, improve economic efficiency, strengthen the technical quality inspection system of the construction process, improve the quality of the project and do a good job in various measures to avoid rework.

  Fifth, strive for high-quality brand projects

  Firmly establish the clear idea of quality first in the centennial plan, strengthen the quality awareness of all employees of the project department, strictly implement the quality acceptance standards, strengthen the internal quality management control, make the project management activities orderly and standardized, and ensure that the one-time acceptance pass rate of the unit project is 100%, in accordance with the company's quality objectives and the quality requirements of the contract, prepare the unit project quality target plan, and grasp the three stages of before, during and after the control. We are fully responsible for quality and safety, organize construction reasonably and scientifically, and strive to create high-quality projects for office building projects.

  Sixth, do a good job in the construction of the project department

  In the work of the project department, we will continuously enhance the political awareness, overall situation awareness and responsibility awareness of employees, so that the overall quality and cohesion will be significantly improved, actively organize employees to study carefully, implement the spirit of the company's meeting, adhere to the company's interests above all else, and make all employees strengthen their sense of responsibility, actively participate in and cooperate with the company's work.

  7. Future work plan

  1. In accordance with the company's construction task objectives, strengthen management, strict requirements, work hard, and conscientiously complete the construction tasks arranged by the company

  2. Strengthen management measures in project quality and strive for national high-quality projects.

  3. In terms of safe and polite construction, strive to create a provincial-level safe and polite construction site

  4. Strengthen the construction management of the project department, strengthen the sense of responsibility, and improve the efficiency

  Under the leadership of the company, our project department will closely focus on the company's mission objectives, be realistic and pragmatic, work hard, and strive to complete the construction tasks assigned to us by the company, and make our contribution to the construction and development of the company.

Renovation Project Manager Debriefing Report 3

  XX project fully implement the spirit of the bureau and the company's work conference, with the support of superior leaders and the help of colleagues, conscientiously implement the company's management system, focus on fine management and comprehensive performance, strengthen management methods, do a good job in project management, support the ideological and political work of the party organization and party building work, and continuously improve the business potential and ideological and political quality of the employees of our project.

  At present, there are three projects, of which the second bid section of the renovation project is located in the Henan area of XX District, XX City, with a total length of 1.4km, and the first bid section of the road municipal engineering is located in the Donggu area of Tanggu District, Tianjin, with a total length of 2.0km of 5 roads. The land filling project has 1.86 million m3 of earthwork filling, and the amount of construction filling work reaches the planned fill elevation of 3.5m. In the first quarter, in the state of the demolition of the Zhanan Road and Dagu Road projects was not in place, our project personnel certified and studied, strictly demanded themselves, showed a good spirit, and actively fought for the laying of 623m6 communication pipelines from the owners under the leadership of the project leadership team.

  1. Progress in the implementation of the project

  The general contracting and subcontracting of the XX project shall be carried out normally in accordance with the contract in terms of quality, safety and payment status, and there shall be no breach of contract.

  Second, the progress of management

  Zhanan Road Reconstruction Project Bid Section 2 and Road Municipal Engineering Bid Section 1 Except for the owner's undemolished lot, the construction task is completed under the requirements of the general contracting contract, and the land filling project, the first phase of the contract period is completed by the owner of the earthwork filling project of the plot designated by the owner, and the speed of the construction period has been recognized and praised by the owner.

  Third, the quality management status

  As of March 31, the three projects concealed acceptance, inspection and evaluation pass rate of 100%, no incompatible items, the construction quality is relatively stable, no quality problems are exposed, in the quality inspection station, the owner and the supervision unit to the inspection to praise, establish a strict quality requirements of the image.

  Fourth, the status of safety management

  The project actively participates in the safety activities of the company and the construction committee, conveys the relevant safety spirit in a timely manner, conducts self-inspection and self-correction before resuming work, investigates the safety and quality hazards of the existing machinery on the site, and reports it regularly. According to the different characteristics of each stage and period of the project, the construction personnel should be reminded to do three things at the construction site, and pay attention to anti-skid, anti-falling, anti-falling objects, anti-electric shock, etc. As of the end of the first quarter, there were no personal and equipment safety incidents.

  Fifth, the project cost control status

  Since the resumption of work of the XX project, it has been controlled from on-site management, measure cost control, material cost and subcontracting cost, and regularly made cost analysis to calculate the profit and loss situation, and reduced costs and increased efficiency by optimizing the construction plan, increasing the number of change visas, strict process materials, machinery, manual management, safety quality control and other measures.

  Sixth, the status of contract management

  As of March 31, 3 general contracts have been signed for XX project, and a total of 40 subcontracts have been signed, including 9 labor subcontracts, 20 material procurement contracts and 21 lease contracts, all of which are valid signatures and seals.

  7. Labor management status

  At the beginning, with the rise of goods, there was a shortage of labor all over the country, and Tianjin was no exception, and the project department took timely measures to contact and communicate with the labor subcontracting team in a timely manner, and did a good job in organizing and deploying according to the contract to ensure the demand for engineering labor. On this basis, we will continue to improve the company's labor management system in the quarter.

  8. Polite construction and skill emission reduction management

  In the first quarter, the XX project continued to strengthen the management of on-site polite construction and skill emission reduction, and the safety officer specialized in the construction of the courtesy site, continued to clean the construction site, made the road clean and smooth, and all kinds of equipment and materials were marked and stacked in an orderly manner, especially the earthwork of the construction site was leveled and squared, and the materials were stacked, and the construction site gave people a pleasing feeling. At the same time, it actively contacts the owners and local environmental and water protection authorities, and actively invites them to enter the site for inspection, solicit opinions, and gradually improve environmental and water protection plans and measures. The groundwater pumped from the precipitation project and the surrounding '5 large ponds' are set up as water storage tanks at the construction site.

  9. Problems existing in the project and corrective measures

  Tianjin project due to the owner has not been demolished, the project is in a semi-suspended state, the construction environment is complex, to our bidding into the site unexpected, from the contract period, the time has been significantly exceeded, the project and the subcontracting team appeared in the situation of nesting, while the price of labor, materials, machinery continues to rise, the future economic prospects of the project are not optimistic. But the project department is not passively waiting, but taking positive measures:

  (1) Formulated a sound economic data management system, regularly report to the owners and supervisors, and collect the owners, supervisors and government documents and on-site image data.

  (2) Take precautions to purchase the bulk materials needed before the price of materials rises, prepare for construction, and prevent the price of materials from rising sharply.

  The above is the first quarter of the work report, although some work has been done, but with the requirements of the superior leadership, there is still a big gap, the second quarter of my project will focus on the annual work plan and goals, further strengthen the responsibility, refine the task, quantify the goal, strengthen management, continue to accelerate the pace of construction of the project under construction, and successfully complete the task. Mainly do the following work:

  1. Further improve project management

  2. Full performance

  3. Reduce costs and increase efficiency

  4. Increase the number of change visas

  5. Improve the overall technical strength of yourself and the project

Renovation Project Manager Debriefing Report 4

  I am from the XX project department. First of all, I am very grateful to all the leaders for taking time out of their busy schedules to listen to my debriefing, and I am also honored to be a member of the installation branch. XX year is a turning point in my life and a new starting point in my life. It has been more than four months since I started the induction training, and in these months, with the help of leaders and colleagues, I have learned a lot about the work process, and I have also deeply experienced our company's corporate culture and various rules and regulations with "integrity" as the core.

  After coming to the project, I was mainly responsible for the on-site construction, on-site management and project documentation, and I was also actively learning about budgeting. In the project work for a period of time, let me understand that the management of a project is mainly divided into safety, quality, progress and business four parts, safety is the prerequisite for the normal work of the project, quality and progress is the lifeblood of the project, business is the cost and profit of the project, these four blocks are interlocking and complementary, only efforts to do a good job in these four pieces of work can ensure the efficient operation of the project. So for a period of time, I have been working hard to implement and study these four major pieces of work. Next, I would like to report on my specific work since joining the company as follows:

  1. Ask for advice with an open mind and study hard.

  Although I am a manager on the project, as a newcomer who has just joined the company, I mainly focus on learning, so after coming to the project, my first job is to read the drawings, familiar with the construction process of the whole project, when I don't understand something, I will aggressively ask the leaders and colleagues on the project for advice, and at the same time go to the labor team to work together with the labor personnel to learn specific construction methods from them.

  2. Serve with affection and do things positively.

  In my work, I treat everyone politely, insist on a warm smile, patiently help the labor staff, and I can't answer the questions they ask, I ask the leader for advice, and then give answers; For quality problems, when labor personnel need to rework, I always do 'courtesy first', do not put on a show, patiently communicate with them, and avoid conflicts with them and affect the company's image.

  3. Abide by the system and dare to grasp and manage.

  When the construction is carried out on the site, especially during the installation of the steel structure, due to the high altitude work, the danger is greater, I manage the workers according to the system and procedures, and strictly inspect the personnel entering and leaving every day to avoid the theft of the company's property caused by the entry of suspicious personnel; For those who do not have safety measures in place, such as: 'Entering the construction area without wearing a helmet; Failure to wear seat belts when working at height; There are no fire extinguishing facilities when the fire is used, etc., I will rectify and punish in accordance with the company's systems and procedures, and put various safety measures in place to ensure zero accidents during construction.

  Fourth, hard work and tirelessness.

  I am completely obedient to the leader's arrangement and implement it to the letter; Work with the mentality of persevering until the 'last minute', and continue to do a good job every day; I also take the initiative to undertake the work that I don't know, and strive to be able to share more work for leaders and colleagues, quickly improve myself, and be competent for my own position. As a scholar, I always ask them for their experiences in the work.

  During this period of work, I am also clearly aware of my own shortcomings, mainly at this moment:

  1. Short working hours, insufficient work experience, and no effective working methods; 2. Individual work is not done meticulously enough, and occasionally there is insufficient coordination;

  3. My theoretical level and engineering project experience cannot catch up with the requirements of the work, and it needs to be improved urgently; 4. Lack of practical experience of professional knowledge, unable to effectively combine the professional knowledge and practical work learned in school in a timely manner, and need more honing and practice.

  Although I still have a lot of deficiencies in my work, I am determined to seriously improve my business skills and work level, make the company stronger and bigger, and contribute to the strength that I should contribute. So in the future, I will try to do the following:

  1. Consciously strengthen learning, while learning professional knowledge, we should also be enterprising to learn the different professional knowledge involved in our installation engineering, broaden the scope of knowledge, and comprehensively improve ourselves;

  2. Overcome youth and irritability, be down-to-earth, improve work initiative, not afraid to do more things, not afraid to do small things, and improve yourself in bit by bit practice;

  3. Improve self-performance ability, resolutely be able to fully competently perform all the work of your position after half a year, and strive to cultivate yourself into a qualified employee with a comprehensive business;

  4. Enterprising learning of business knowledge, because only by clearly understanding the cost budget of the project can we save costs in the work and get more profits for the project.

  Although I am a student who has just graduated from school, working for only more than four months, there are many deficiencies, but I always demand myself with the standard of a "qualified five bureau people", take leaders and colleagues as an example to remind myself, and strive to be a qualified five bureau people, can show myself on the big stage of the five bureaus, and contribute to the glory of the five bureaus.

  The above is my work during this period of debriefing report, if there are deficiencies, please criticize and correct the leaders, here, I wish you good health, smooth work, happy every day, everything goes well!

Renovation Project Manager Debriefing Report 5

  Under the correct guidance of the company's leaders and the cooperation of colleagues in various functional departments of the company, all the employees of our engineering project department adhere to the spirit of advancing with the times and pioneering spirit, conscientiously carry out the work of engineering project management, and have achieved the necessary results. A debriefing report on the work is as follows:

  1. Project progress scenario and output value completion scenario

  1.1 Project progress scenario

  The civil structure part of the project has been basically completed, and the construction and production of the steel structure part has also been completed, and the deployment and hoisting are currently being carried out; the foundation pile project of the fourth phase of the project has been completed, and the civil structure part is currently under construction.

  1.2 The completion of the output value of each project

  Up to now, the XX factory is 29.729 million yuan, the fourth phase is 9 million yuan, and the output value is expected to be about 45 million yuan by the end of the year.

  Second, the situation of the personnel of the project department

  There are 5 management personnel in the project department: project manager, safety officer, quality officer, safety officer and constructor.

  3. Safety, quality, progress and courtesy construction control

  After a year of hard work, with the efforts of all management personnel of the project department, we will coordinate various relationships, deal with various problems and ensure the safety and quality of the project. At present, there are no major quality and safety accidents, and all projects have done well in progress control and polite construction control.

  Fourth, actively cooperate with the company's business department to do a good job in market development

  Doing a project, building a monument, making a friend, and opening up a market is the business philosophy of the project department, and doing a good job in the project under construction and winning the trust of the owner is the key to contracting the follow-up project. On the basis of doing a good job in the project under construction, with the assistance of the outsourcing team, all the employees of the project department actively cooperate with the market operation department to develop the market and track the potential bid-winning projects.

  5. Objectives

  With the efforts of all employees of the project department, we have overcome difficulties and achieved good results, and successfully completed this year's work.

  Looking forward, all the staff of the project department are full of confidence and are determined to contribute to the further development of the company, and at the same time, in order to make the project management level to a higher level, in order to make the marketing indicators of our project department to a higher level, our project department strives to do a good job in the following aspects:

  1. Do a good job of safe and polite construction

  In the project department, a higher goal is first set for the projects involved, so that the management can be targeted. Establish a safety management system with full-time post safety management as the core, with professional engineers as the backbone, team leaders and workers fully involved, strengthen the safety disclosure work, especially the disclosure of the collaborative team, so that the general contractor and the collaborative team safety management system constitute a linkage, closely combine production and safety, and rely on the company's management strength to do a good job in safe and polite construction to ensure the realization of project safety management objectives.

  2. Do a good job in quality control

  In order to better control the quality, establish a quality responsibility system at all levels, insist on putting quality in the first place in construction and production, grasp the quality of all employees, and implement the responsibilities to each management position, especially to implement the management personnel of the outsourcing team, strengthen the quality awareness education of the outsourcing team, and the education should reach 100%.

  Strengthen the quality inspection, the project department set up special quality inspection personnel, every day to carry out the quality inspection of the project, fully grasp the role of prevention and gatekeeping, and strive not to have any quality accidents.

  3. Do a good job in management and communication

  Enterprising to do a good job in project management, through exchanges and training, improve the management level of the outsourcing team, and communicate with the owner, supervisor and other project participating units, so as to enhance the image of the project department.

  4. Enterprising and open up the market

  As always, we will actively cooperate with the company's business department to do a good job in market development, provide accurate and timely market information, and strive to make greater contributions to the company's business scale to become bigger and stronger.

  5. Strengthen the cultivation of reserve talents

  Vigorously cultivate reserve talents, push some young students to the front line for practical training, give full play to the advantages of young students, and improve the management level of the project.

Renovation Project Manager Debriefing Report 6

  In 20xx, in accordance with the company's work objectives, we focused on safe production and improving the quality of the project, strengthened management, changed concepts, created high-quality brand projects, led all employees of the project department, pioneered and innovated, grasped quality, package safety, rushed progress, and created benefits, so as to ensure the smooth progress of the project under construction.

  1. Complete the project

  1. Completed the construction task of foundation pit excavation of construction engineering, and made various preparations for the construction of the main body of the foundation;

  2. The construction of the X plant project is basically completed;

  3. The foundation pit project of X project is completed, the foundation cushion construction is completed, and the construction of waterproof engineering is ready for construction.

  2. Strengthen project quality management

  We insist on relying on quality to survive, In the process of quality management, in strict accordance with the design requirements and various specifications and regulations of construction, the implementation of the project quality responsibility system, requiring all types of personnel to strengthen the quality of the construction personnel of the quality ceremony education, do a good job of pre-construction technical disclosure, clear quality standards and requirements, we adhere to the centennial plan quality first policy, do a good job in the prevention of common quality problems, develop management measures, do a good job in the quality control of each process, each team must do a good job in quality self-inspectionThe project department will do a good job in the supervision and inspection of the whole process of construction, and organize relevant personnel to carry out special inspection on the basis of self-inspection, so as to continuously improve the quality of the project.

  3. Strengthen safety management

  In order to conscientiously implement the safety production regulations, implement engineering safety technical measures, establish and improve safety production management institutions, adhere to the principle of managing production must manage safety, and when safety and production are contradictory, production must obey safety, the project department constructors should do a good job of safety technology disclosure work at the same time when arranging construction tasks, and the construction site should obey safety management. Organize the education of basic construction knowledge and operating procedures, correctly use safety protection facilities and labor protection supplies, and strictly implement various safety technical measures in the construction organization design and construction plan to ensure safe construction production.

  Fourth, the status of construction management

  1. In the construction management of the project, the construction personnel should be organized, planned, reasonable and scientifically arranged, so as to truly play and improve the construction efficiency.

  2. Speed up the construction progress under the condition of ensuring the quality and safety of the project.

  3. To control construction costs, one is to strictly control the expenses of the project department, the second is to increase income, and the third is to do a good job in engineering economic visas.

  4. Strengthen cost management to improve economic efficiency, improve construction management by adjusting the construction team, improve the professional quality of construction personnel, and further deepen the management level.

  5. Strengthen material management, strictly control the quality of materials in the process of construction and use of materials, and strictly prohibit unqualified materials from entering the construction site.

  6. Strengthen construction management and improve the level of construction organization. Correctly select the construction plan, reasonably arrange the construction site, do a good job in on-site scheduling and coordination, speed up the construction progress, shorten the construction period, strengthen technical management, improve the quality of the project, formulate and implement technical and organizational measures to reduce costs, improve economic efficiency, strengthen the technical quality inspection system of the construction process, improve the quality of the project and do a good job in various measures to avoid rework.

  Fifth, strive for high-quality brand projects

  Firmly establish the clear idea of quality first in the centennial plan, strengthen the quality awareness of all employees of the project department, strictly implement the quality acceptance standards, strengthen the internal quality management control, make the project management activities orderly and standardized, and ensure that the one-time acceptance pass rate of the unit project is 100%, in accordance with the company's quality objectives and the quality requirements of the contract, prepare the unit project quality target plan, and grasp the three stages of before, during and after the control. We are fully responsible for quality and safety, organize construction reasonably and scientifically, and strive to create high-quality projects for office building projects.

  Sixth, do a good job in the construction of the project department

  In the work of the project department, we will continuously enhance the political awareness, overall situation awareness and responsibility awareness of employees, so that the overall quality and cohesion will be significantly improved, carefully organize employees to study carefully, implement the spirit of the company's meeting, adhere to the company's interests above all else, and make all employees strengthen their sense of responsibility, participate in and cooperate with the company's work.

  7. Future work plan

  1. In accordance with the company's construction task objectives, strengthen management, strict requirements, work hard, and conscientiously complete the construction tasks arranged by the company

  2. Strengthen management measures in project quality and strive for national high-quality projects.

  3. In terms of safe and polite construction, strive to create a provincial-level safe and polite construction site

  4. Strengthen the construction management of the project department, strengthen the sense of responsibility, and improve the efficiency

  In 20xx years, under the leadership of the company, our project department will closely focus on the company's mission objectives, be realistic and pragmatic, work hard, and strive to complete the construction tasks assigned to us by the company, and make our contribution to the construction and development of the company.