laitimes

With an investment of 550,000 yuan, the two sections of Pubei and Zhanghuang roads have been renovated and upgraded, and they have become beautiful

author:Pubei scholar

Recently, at the construction site of the "white to black" road reconstruction project on Dongfeng Road and Wenhua Street, Zhanghuang Town, Pubei County, the roar of large asphalt pavers, road rollers and other machinery came in bursts, and the construction personnel carried out paving and filling operations in an orderly manner, and a wide and smooth "blackened" road extended forward......

With an investment of 550,000 yuan, the two sections of Pubei and Zhanghuang roads have been renovated and upgraded, and they have become beautiful

Pavement reconstruction is under construction

Dongfeng Road is one of the main roads in Zhanghuang Town, and it is also the traffic artery for the masses to go to Quanshui Town, because of the construction time for a long time and the traffic flow and the flow of people are larger, many road sections have large areas of cracks, aging, potholes and other phenomena.

"Especially during the rush hour when students go to and from school, sometimes a block is half an hour, and it is very inconvenient for us to ride a bicycle to pick up and drop off children. Talking about the road surface before it was repaired, a parent who was picking up and dropping off her child at the entrance of the kindergarten in the center of Zhanghuang Town said.

In order to effectively help the masses to solve the "troubles", Zhanghuang Town People's Congress has repeatedly organized people's congress representatives to the damaged road section of the site for investigation, after fully understanding the actual situation and the opinions of the masses, the town people's Congress will timely reflect the investigation to the town party committee and government, and put forward the proposal of "taking advantage of the key construction projects in the jurisdiction in the mobilization of construction machinery to assist in repairing the damaged road surface". After receiving the opinions and suggestions of the town people's congress, the town party committee and government attached great importance to promoting the implementation of the "white to black" project on Dongfeng Road and Cultural Street in Zhanghuang Town, and it was successfully completed.

With an investment of 550,000 yuan, the two sections of Pubei and Zhanghuang roads have been renovated and upgraded, and they have become beautiful

Pavement reconstruction is under construction

The asphalt pavement after the transformation and upgrading is clean and spacious, the road signs are eye-catching, and the bright street lamps stand on both sides of the road, the road environment has been greatly improved, and the masses have traveled conveniently and comfortably. It is understood that the "white to black" project of Dongfeng Road and Cultural Street in Zhanghuang Town has invested a total of 550,000 yuan and paved about 1.2 kilometers of asphalt pavement. At present, the "white to black" project has been completed, which can not only improve the road traffic environment, but also enhance the ability of the road to absorb dust and discharge rainwater, and is expected to benefit about 20,000 local residents.

With an investment of 550,000 yuan, the two sections of Pubei and Zhanghuang roads have been renovated and upgraded, and they have become beautiful

The road after the renovation is completed

The smooth implementation of the "white to black" road reconstruction project on Dongfeng Road and Cultural Street in Zhanghuang Town is a microcosm of the people's congress deputies in Zhanghuang Town who actively perform their duties and solve their worries for the people. In recent years, the Zhanghuang Town People's Congress has focused on the needs and expectations of the masses, adhered to the main line of promoting high-quality urbanization, gave full play to the role of the people's congress deputies as a bridge and staff assistant, extensively listened to and collected the opinions and suggestions of the grassroots people from all aspects, found the path to expand and strengthen the town economy and drive the development of new urbanization, and continued to promote the continuous improvement of infrastructure construction in market towns to make up for shortcomings. With an investment of 17 million yuan, the water supply pipe network project in the market town is about to be completed, and the development of the west area of the market town (baking town) has entered the substantial land acquisition stage, and the total number of "white to black" projects in the market town has been completed for about 4 kilometers, and the lighting project has been improved, and 230 street lamps have been installed. The implementation of batches of practical projects for people's livelihood has accumulated new development momentum and vigorous strength for Zhanghuang Town.