After reading the flow chart and the on-site measurement drawing, anyone can understand it
author:Architectural engineering information
1. The rough house undertakes the acceptance process, plan, common tools and projects
1. The rough house undertakes the acceptance process
Note: The following pictures can be clicked to view high-resolution images
2. The rough room undertakes the acceptance plan
Formulate an inspection plan according to the project schedule, complete the inspection and rectification before the project is delivered, and the inspection items must be full inspection, not random inspection.
The participants' mastery of the inspection standards is the basis and guarantee for improving the quality of work. Indoor inspection: Each team can generally complete the inspection of xx households every working day.
3. Common tools for rough room acceptance
4. The rough room undertakes the acceptance project
Dimensions of rooms and common areas
Thickness and cracks of cast-in-place slabs
Door and window installation works
Walls, floors and ceiling coverings
Waterproofing works
Glass installation works
Water supply and drainage system installation works
Electrical installation works
Second, the basis for the acceptance of the rough house
Code for Residential Buildings GB50386-2005
Code for Residential Design GB50096-2011
"Unified Standard for Acceptance of Construction Quality of Construction Projects" GB50300-2013
Code for Acceptance of Construction Quality of Concrete Structure Engineering GB50204-2015
Code for Quality Acceptance of Building Decoration and Decoration Engineering GB50210-2001
Code for Acceptance of Construction Quality of Building Ground Engineering GB50209-2010
Code for Construction Quality Acceptance of Building Water Supply and Drainage and Heating Engineering GB50242-2002
Code for Acceptance of Construction Quality of Building Electrical Engineering GB50303-2015
3. Acceptance standards and methods for rough houses
1. The size of the room and public parts
2. Detection method of bay size
3. Door and window inspection
4. Walls, floors and ceilings
5. Waterproof engineering
6. Glass installation engineering
7. Building water supply and drainage engineering
In addition to the inspection items required by the household inspection, the branch pipe drainage slope inspection, through-ball test, irrigation test, and water supply pipeline pressure test should be carried out
8. Building electrical engineering
Equipotential, grounding, and inter-line insulation tests for distribution boxes, exterior wall windows, and railings
Source: Internet, the copyright belongs to the original author.
It is only for communication and learning, if there is any infringement, please contact the author to delete