laitimes

The spring inspection of the 35-110kV line in the Longdong oil area of Changqing Oilfield was successfully concluded

author:Daily Gansu

On April 9, with the end of the overhaul of the 35kV Huaqiao I. circuit line, the spring inspection of the 35-110kV power line in Changqing Longdong Oil Area was fully successful. A total of 18 lines of 287.6 kilometers have been repaired, 557 defects have been treated, and 295 equipment have been replaced, laying a solid foundation for the safe operation of the power grid in Longdong oil area.

The spring inspection of the 35-110kV line in the Longdong oil area of Changqing Oilfield was successfully concluded

Accurately formulate maintenance plans. The Changqing Oilfield Line Construction and Installation Brigade, which undertakes the maintenance task, scientifically compiles the "one line one plan" maintenance plan in combination with the daily inspection and defect investigation, and tailors maintenance and elimination measures for different defects of different lines to enhance the targetedness of maintenance and defect elimination. Implement "one card, two lists, and one file", comprehensively strengthen emergency management, clarify each maintenance task, clarify risk disposal measures, detail quality and technical standards, improve the targeting of maintenance work, and enhance the risk controllability of the maintenance process. Implement the maintenance line contracting responsibility system, each maintenance team to grasp the operation status of the line in advance, analyze the hidden dangers of defects, formulate measures to eliminate defects, implement who is responsible for maintenance, who is responsible for dereliction of duty, and who is responsible for dereliction of duty, so as to avoid quality problems caused by inadequate investigation, incomplete analysis and incomplete elimination, so as to ensure high-quality and efficient maintenance.

The spring inspection of the 35-110kV line in the Longdong oil area of Changqing Oilfield was successfully concluded

Strict implementation of safety measures. The brigade implements the "round" management model, and the cadres of the brigade and the squad insist on following the operation, tracking and inspecting the maintenance organization, risk identification, hidden danger investigation and maintenance safety and quality on the spot, refining and analyzing the scope of operation, risk sources and safety measures, and strictly implementing on-site safety responsibilities. Before each overhaul, the task division of labor and safety disclosure meeting will be held to carry out the division of labor and risk identification of the maintenance rod section, improve the reduction measures and quality requirements, and hold a work summary and analysis meeting after the overhaul to review, analyze and comment on the problems existing in the maintenance on the same day, and at the same time take a collective discussion method to refine the major operations such as the line porcelain bottle, continuous gear wire, lightning protection down line and grounding electrode replacement, and do a good job in risk identification and reduction measures, and improve the risk management level of major operations.

The spring inspection of the 35-110kV line in the Longdong oil area of Changqing Oilfield was successfully concluded

The competition helps to improve the efficiency of spring inspection. The brigade carried out the theme practice activities of "the party flag is raised at the spring inspection site, and the party members are pioneers in the front" at the spring inspection site, and 73 party members stood in the lead and became pioneers, and drove the employees to rush to the front and do the first with practical actions; carried out the labor competition activity of "keeping in mind the main responsibility to ensure power supply and fighting for the spring inspection to be the pioneer", and compared skills, competition style and bright performance through the forms of "ring competition", "competition competition" and "matchmaking" to stimulate the enthusiasm of employees for spring inspection; carried out the youth meritorious activity of "youth bravely striving for the first and making new contributions in spring inspection", and carried out the "mentor leading apprentices" Activities, to take the old with the new, with the strong with the weak and other "one to help one", the maintenance site into a training classroom, the formation of "learning by doing, learning to help, help in leading" strong atmosphere, to promote the spring inspection work to speed up and improve efficiency.

The spring inspection of the 35-110kV line in the Longdong oil area of Changqing Oilfield was successfully concluded

Care for employees and gather strength. The brigade pays full attention to the thoughts, work and life of the employees participating in the inspection, and the branch members insist on going deep into the front line of the spring inspection to understand the needs and desires of the employees, do a good job in the typical commendation work of the phased spring inspection, and timely condolences to the employees during the key maintenance period to help solve the difficulties in work and life. At the same time, it actively coordinates with the logistics support unit to bring meals to the employees who cannot eat on time during the overhaul, so that the employees can replenish their physical fitness in time after the overhaul is completed, and through the implementation of bit by bit care and care measures, so that the employees can eat comfortably and work strongly, and promote the safe and stable conclusion of the spring inspection. (Zheng Kaiyun)

Read on