A few days ago, we saw a new type of turnaround drawer-type unloading platform on the excellent construction site of safety production and civilized construction in Shenzhen, China Construction First Bureau: no need to be buried, with the use of hanging, internal and external telescopic, easy to use!
Turnaround drawer-type unloading platform and alarm device thereof
What makes the new tipping platform so special?
The new technology will show you a little!
The new unloading platform is not only extremely convenient to dismantle and use, but also has a maximum load of up to 5 tons, which can be widely used in: prefabricated construction projects, glass curtain wall installation and hoisting, ALC partition panel installation and hoisting, large-scale electromechanical hoisting, disc buckle frame hoisting and transferring, steel structure hoisting, PC prefabricated parts hoisting, concrete brick hoisting, decorative materials hoisting, medical equipment hoisting, generator set hoisting, etc., with a wide range of applications, easy to cope with modern engineering construction.
Let's take ALC wall panel unloading and transportation as an example
Take a look at how convenient the new unloading method is
Five highlights
The innovative top-brace support and retractable transport design offer a number of advantages compared to conventional unloading platforms:
01 Easy to install, no need to embed
After transportation to the site, the left and right guardrails and movable doors are unfolded on the ground, and the whole assembly is completed, which is safe and convenient to disassemble and use, and safe and labor-saving to use and install
The spiral mechanism of the support column can be tightened, and the top of the support can be fixed, and no embedded parts are required
02Shorten the construction period and save costs
The internal and external telescopic movement greatly improves the unloading efficiency and saves construction costs
03 The maximum safe load can be up to 5 tons
Rigorous testing is carried out to ensure safety for the maximum safety factor
04 The specifications and sizes are complete, and you can choose according to your needs
The specifications and sizes are suitable for different project site needs
05Folding and storage, saving logistics costs
The folding transportation form is convenient for container loading and greatly saves transportation costs
Application scenarios
The super platform with a cantilever length of 4.5-5.25 meters can meet the needs of all modern prefabricated construction projects, such as the following commonly used components and equipment, which can be easily handled by applying the new unloading platform:
01ALC wallboard construction
- Solve the problem of inefficient construction and transportation of prefabricated ALC partition panels/ceramsite partition panels
- Solve the problem that the size load of the traditional unloading platform does not meet the ALC construction problem
- Reduce the transportation pressure and safety hazards of outdoor construction elevators
- Solve the inconvenience caused by the small transportation space of indoor wellhead construction elevators
Efficient lifting of tower cranes
Super dump platform loading
Electric instead of manpower
02Glass curtain wall construction
- Solve the problem of inefficient construction and transportation of unitized glass curtain wall
- Comprehensively solve the installation defects and potential safety hazards of the traditional self-made unloading platform
- Solve the land occupation and potential damage caused by the outdoor storage of unitized glass curtain wall
- Solve the hidden danger of long-distance wind influence for the installation and lifting of unitized glass curtain wall super high-rise buildings
- The maximum load is 5 tons, which can meet the weight of most of the unitized glass curtain walls
- The standard cantilever is 4.5 m to 5.25 m, which can adapt to the size of the unitized glass curtain wall of different lengths
Efficient lifting of tower cranes
Super dump platform loading
Flatbed truck
03Large-scale mechanical and electrical installation equipment
- Solve the problem of inefficient construction and transportation of large-scale mechanical and electrical equipment
- Comprehensively solve the installation defects and potential safety hazards of the traditional self-made unloading platform
- The maximum load is 5 tons, which can meet the weight of most of the mechanical and electrical equipment
- The standard cantilever is 4.5 meters to 5.25 meters, which can adapt to the size of mechanical and electrical equipment of different lengths and the length of fire pipes
- The width of the model is 1.65 meters - 3.65 meters, which can adapt to the size of different sizes of mechanical and electrical equipment
Real shot at the construction site
At present, the new unloading platform has been widely used in the construction projects of large domestic construction enterprises, including China State Construction and China Railway, and has been well received by all parties involved in the project:
Lifting pedal, non-slip design
The foot-operated movable floor locking mechanism can make the bottom plate lowered as a slope to enter and exit, which is convenient for forklifts to enter and exit the platform, saving labor and improving efficiency
Installation site
Shipped in bulk, convenient for transportation and convenient for on-site storage
A new and upgraded electric model
Completely liberate manpower
Source: Internet, the copyright belongs to the original author.
It is only for communication and learning, if there is any infringement, please contact the author to delete