In order to further consolidate the work of creating a national civilized city, the Shigangdun Natural Vegetation Management and Protection Station in Ganzhou District took advantage of the favorable opportunity of planting trees in spring to carry out replanting and replanting of the missing plants and short seedlings in the green belt on both sides of Line 227 and Airport Road, so as to dress up the green appearance and beautify the external "green landscape window".
In order to complete the spring replanting and replanting work with high standards and high quality, the station arranged and deployed early, through the acceptance and evaluation of the key greening and maintenance work in winter and spring, determined the lack of short seedlings on the spot, and determined the replanting and replanting plan according to the growth habits of seedlings to ensure that one plant was planted and one plant was lived.
During the planting process, the staff of the station strictly control the quality of seedlings and strictly enforce the operating procedures for seedling planting. By taking a series of sterilization and root-promoting measures such as different seedling planting depths and root application of rooting powder and carbendazim, we can ensure the survival of planted seedlings and do a good job as a "restorer" of the green ecological corridor.
Up to now, 8,000 lilacs and 3,000 red elm leaves have been replanted in the green belt of Line 227 and Airport Road. Replanting will be completed in mid-April. In the next step, the station will continue to strengthen the spring maintenance of green seedlings, and create a green landscape ecological corridor full of greenery and fragrance of flowers through pruning, cleaning and drying, watering and fertilizing. (He Liang)