laitimes

The latest progress in the planning and construction of concentrated and contiguous areas in Luohu District →

author:Southern Metropolis Daily

In order to attract high-quality enterprises to land

Luohu "shot" again

Luohu District is planned and constructed in a concentrated contiguous area

Here's the latest development

Come and pay attention~

On the morning of April 7, Fan Defan, secretary of the district party committee, presided over the work promotion meeting of the Luohu District centralized contiguous regional planning and construction project to study and promote the relevant work. District Mayor Zuo Jinping, district leaders Xia Dong, Lai Jianhua, Zhan Hui, Huo Guangyong, and Liu Chuwen attended the meeting.

At the meeting, the participants watched the promotional video of Honggang International Innovation Plaza in Qingshuihe Headquarters New Town, B1 Plot of Transit Land, Sungang Kequan and the north area of Dawang Wutong, and listened to the overall work progress of the concentrated area, the structure of the work class, and the report on the investment promotion plan.

Luohu District has four major concentrated contiguous areas

The total land size is 133 hectares

The total scale of investment land is 126 hectares

The first batch of investment land is

Phase II of Honggang International Innovation Plaza

and transit land plot B1

The total land area is about 16 hectares

◇Honggang International Innovation Plaza, Qingshuihe Headquarters New Town, is located at the northern gateway of Luohu and will make every effort to build an economic agglomeration area for digital economy headquarters in the future. It is divided into three phases, with the first phase of 4 plots (2.3 hectares) being transferred, the second phase of the total land area of about 6.7 hectares, and the third phase of Yulong area with a total area of about 30 hectares.

The latest progress in the planning and construction of concentrated and contiguous areas in Luohu District →

△ Renderings, subject to final approval

◇Adjacent to Luohu Port and Shenzhen Railway Station, the B1 plot of transit land covers an area of about 10 hectares, and the current status is pure land, which will be guided by Shenzhen-Hong Kong cooperation and build a Shenzhen-Hong Kong cooperation demonstration park with life and health, cross-border finance and international trade as the industrial direction.

The latest progress in the planning and construction of concentrated and contiguous areas in Luohu District →

△ Renderings, subject to final approval

◇Located in Sungang Street, west of Honghu Park, the Sungang Passenger Area will be comprehensively developed on the basis of retaining the entire railway passenger station and the Guangzhou-Shenzhen Railway operation line. The planned land area is about 59 hectares, and the planned construction area is about 1.495 million square meters, including 500,000 square meters of industrial space that can be used for industrial selection.

The latest progress in the planning and construction of concentrated and contiguous areas in Luohu District →

△ Renderings, subject to final approval

◇Located on the north side of the Dawang Wutong Ecological Integration Zone, with a total land area of about 23.7 hectares, the Dawang Wutong North Area will focus on the layout of eco-friendly formats such as digital creativity, high-end health care, and MICE tourism in the future.

The latest progress in the planning and construction of concentrated and contiguous areas in Luohu District →

△ Renderings, subject to final approval

Recent

It will also be held in Luohu District

The first batch of investment promotion activities in the concentrated contiguous area

Attract high-quality enterprises to land and develop

Fan Defan said that it is necessary to clarify the positioning, open up the ideas, focus on investment and construction, development and operation, and industrial development, and constantly deepen and promote the relevant work plan; to promote as a whole, grasp the joint management, the leading departments should establish a "game of chess" thinking, strengthen the overall planning and work coordination, and cooperate with the relevant departments to act separately, formulate a good road map and construction drawings; Policy support and service guarantee serve as the "stepping stones" for attracting investment, and comprehensively promote the planning and construction projects in concentrated and contiguous areas.

Next

Luohu will speed up

Concentrate on the planning and construction of contiguous areas

Empower the high-quality development of the industry

(Source: Luohu release)